• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/87

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

87 Cards in this Set

  • Front
  • Back

Level of dimensional precision, often established by trade organizations or accepted norms.

Tolerance
Gap or space provided to allow the construction or installation of a material.
Clearance
Construction drawing section appearing immediately before landscape drawings.
Civil
Which appears first in a document set: interior elevations, or exterior elevations?
Exterior
During construction, a conflict appears between mechanical elements and structural elements. Assuming a standard design-bid-build delivery, Who was responsible for coordination of the two consultant drawings for conflicts?
Architect
A specification listing brand names, telling the contractor exactly what product to use.
Prescriptive or Closed Specification (Proprietary is a type of Prescriptive spec)
A specification which calls out a specific product, but allows substitution with a contractor-selected equal.
base bid with alternates
A specification giving detailed written requirements for material and workmanship but does not mention trade/brand names.
Descriptive specification (A type of Open Spec)
ASTM stands for
American Society for Testing and Materials
What section would contain the specifications for the construction of a swimming pool?
Division 13 - Special Construction
UL stands for
Underwriters Laboratories
ANSI stands for
American National Standards Institute
A specification setting criteria and results required of the item being specified including measurements, tests, or other assurances
Performance Specification
Specification division containing site remediation activities.
02 Existing Conditions (formerly 02 Sitework)
Specification division containing an ornamental metal balustrade.
05 Metals
Specification division containing a skylight.
08 Openings (formerly 08 Doors and WIndows)
Specification division containing access flooring.
10 Specialties
Specification division containing waterproofing information for the cladding system.
07 Thermal and Moisture Protection
A specification is divided into three parts. Which part describes the acceptable manufacturers, test standards, or fabrication instructions?
Part 02
Which section of the specification might ask the contractor to submit a manufacturer's certificate of recycled content?
01 General Requirements
MSDS stands for
Material Safety Data Sheet
What acronym describes a sheet containing information about the toxic chemicals contained in a material or product?
MSDS
VOC stands for
Volatile Organic Compounds
True or false - Part 2 of a specification contains delivery and handling instructions for a material or product.
False. (Part 1)
Which part (1, 2, or 3) of a specification would contain information on tests or inspections for quality control?
Part 2
Which part (1, 2, or 3) of a specification would contain information on product alternates?
Part 1
Which part (1, 2, or 3) of a specification would contain information on interfacing with other work?
Part 3
True or false: a specification should generally avoid phrases that try to shift responsibility to the contractor or other party in a general way.
True
Contract type where the owner has a relationship with one general contractor to perform the work.
Single Prime Contract
Contract type where the owner has a relationship with several separate contractors.
Multiple Prime Contract
A type of project delivery where one portion of the work will be designed, bid, and built before other portions of the work are designed or ready to be priced.
Fast Track
Most traditional project delivery type, where a project is designed, then bid on by a contractor, and then constructed.
Design-Award-Build
Fast track construction often relies on employing a third party who provides estimating services, early constructibility reviews, and other administrative services. This third party is called a:
Construction Manager (CM)
An owner is given a set price for construction before beginning, and is not responsible for overruns. This method may be referred to as (three possible answers:)
Fixed price method, stipulated sum, lump sum
A fixed price method project concludes with money remaining unspent during construction of the work. The money goes to the:
Contractor
After construction is complete, there is money not spent on the work which is returned to the owner, who realizes a savings on the expected total cost of the project. This method of pricing / delivery is called:
Guaranteed Maximum Price
The owner agreed to pay the actual cost of construction and the contractor charges a fee established at the beginning of the work. This is called:
Cost Plus Fee Method
Delivery method where one party executes design and construction work.
Design-Build
AIA document B141 is:
Standard Form of Agreement Between Owner and Architect
On site safety precautions are the sole responsibility of:
the contractor
True or False: The owner calls the structural engineer, who is serving as a consultant to the architect, and directs the engineer to make a change in the documents. Since the client is ultimately the financier of the work being performed, they may direct anyone in the project team, should they choose to do so.
False
True or False: The owner pays for a project design through 50% construction documents and then stops the work. Later the owner decides to use those documents to build a new building on a different site, and asks the architect to transmit the drawings to them, at no charge. The owner owns these drawings, and may use them in this manner.
False
How many days of written notice are required before an architect may suspend their design services, if the owner fails to make payments when due?
Seven
The owner makes a significant change to the program the work is based on. The architect asks for additional fees, stating that the new program represents a change in: (1 word)
Scope
A certain percentage, usually 10%, is withheld from each progress payment to the contractor. This is called:
Retainage
Construction completion time is measured from a date, usually described in the contract, called the Date of:
Commencement
A stipulated amount which will be paid to the owner, by the contractor, for each day the project is late.
Liquidated Damages
A payment the contractor may receive for completing the work early, if specified in the construction documents.
Bonus Payment
It is not possible to firmly establish quantities of a portion of the work at the time of bidding. A contractor would typically bid using a ________ price.
Unit
The building permit is typically paid for by the:
Contractor
The land use permit is typically paid for by the:
Owner
True or False: The contractor fails to adequately perform a portion of the work. Seven days later, after a written notice, the owner then performs the work with their own forces. The owner then may deduct the cost of work from the contract sum, including the cost of architect's services.
False: A written notice of seven days is required notifying the contractor of failure to adequately perform work, then a notice of three days that the owner intends to perform the work.
If the cost of a portion of the work cannot be established at bid, the amount set aside for the performance of that work is called a / an:
Allowance
Materials stored on site are stolen by a subcontractor during the performance of the work, but the contractor has agreed in the contract not to bring claims against owner and architect for damages and expenses arising out of performance of the work. This is called:
Indemnification
During construction, the owner hires a separate contractor to install kitchen equipment in portions of the building being built. Who is responsible for coordination so that the kitchen contractor can perform their work?
Owner
An agreement to make a change in the work by owner and architect without agreement on adjustment to contract sum or time with the contractor
Construction Change Directive
Bidding method most likely to result in the lowest possible cost.
Competitive (bidding)
Establishing the bid based on a series of conversations with a selected contractor, possibly with suggestions made by the contractor to reduce the cost of the work. This kind of bid is called a
Negotiated bid
Money required for a bidder to pick up a copy of the bidding documents.
Bid Deposit
True or False: The owner may have the right to pick a bid other than the lowest, or waive bidding irregularities.
True
May the owner reject all bids and abandon the project?
Yes
AIA document A701 is
Instructions to Bidders
During study of the bidding documents, the contractor must report:
Errors, inconsistencies, and ambiguities
If an architect accepts a proposed substitute during the bidding process, he or she must:
Issue an addendum to all bidders detailing the substitution.
A bid is submitted which is above the project budget with alternates that reduce the bid. Some alternates are acceptable to the owner, and others are not. If the owner wishes to accept this bid, but not go over their budget, the owner may:
Accept the bid, with alternates in any combination acceptable to the owner's liking.
A check or bond submitted which guarantees the bidder will enter into a contract if selected.
Bid Security
A bond which guarantees the obligation of a surety company to complete the work should the contractor default.
Performance Bond
A Labor and Material Payment Bond guarantees:
Payment for materials and labor which were the responsibility of the contractor upon the contractor's default.
Submittals are submitted to the architect without bearing any marks that the contractor has reviewed them. The architect should:
Return the submittals without review.
True or False: an architect may modify the work, using addenda, during construction.
False
The architect determines, during construction, that a corridor door must be moved 2 1/2" inches along the wall in order to be framed properly. The architect would issue a:
Minor Change in Work
The number and timing of visits to the construction site by the architect are determined by the:
Architect
True or False: While on site, the architect has the authority reject work not in conformance with the documents.
True
The cost of correcting nonconforming work is the responsibility of the:
Contractor
Generally, the party responsible for the cost of concealed or unknown conditions on site is the:
Owner
Payment made by the owner to the contractor after the architect has determined the amounts requested by the contractor are consistent with work performed and materials stored.
Progress Payment
Amount due to the contractor in a progress payment are based on a document from the contractor called:
Schedule of Values
ASTM-E84
Standard Test for Surface Burning Characteristics of Building Materials
A horizontal or vertical barrier designed to restrict the spread of fire, must be continuous from floor slab to underside of floor above. More restrictive than a partition.
Fire Barrier
A wall assembly of 1 hour rating. Example uses include separating dwelling units or corridor walls.
Fire Partition
A rated wall separating a single structure into separate construction types. Continuous from foundation to roof and guarantees that one side of the structure may collapse without affecting the stability of the other.
Fire Wall
"A" occupancy type
Assembly
"M" occupancy type
Mercantile
Mixed occupancies must be seperated, generally, by this.
Fire Barrier
At egress discharge - any street, alley, or or similar land unobstructed from ground to sky with a clear width of not less than 10'.
Public Way
The number of people that a building code assumes will occupy a given building or portion thereof.
Occupant Load
That portion of exit access that occupants must travel before two separate and distinct egress to two exits are available.
Common Path of Travel