• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/49

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

49 Cards in this Set

  • Front
  • Back

Second person verification of a PMS TAG-OUT requires?

Must be 3M PQS qualed


Must be physically present when first tag attached.

A # next to a check means

Mandatory related

What does the ¢ indicates

Performed by higher authority

Which chapter in OPNAVINST 5100.19 provides guidance for electrical safety and tagout procedures?

C9

W/C of the following is a dual periodicity?

M-2/S-2

Who must review FBR after WCS submission

LCPO/DIVO


DH


3MC

What’s the ship 3M manual

NAVSEAINST 4790.8C

What PQS requires 301 as a pre-req?

301 DCPO

If a work candidate is to be written for a shipyard or contractor to accomplish,what should be on the “main lvl” block?

Depot

What are the 4 categories of IEM?

LU, SU, PM, OT


Lay up, start up, periodic maint., Op Test

Scheduling Aids are used to?

To verify what maintenance requirements are applicable to the workcenter

When two or more work center share a MIP it is considered to be what?

Split MIP

An urgent FBR is submitted when the reason for submission involves W/C of the following?

Safety of equipment, personnel and ship.

ACN FBR received must be implemented when?

Effective immediately

ACN stands for?

Advance Change Notice

A part can’t be ordered unless the work center responsible does...

Open a work candidate

Who screens and serialize PMS FBR?

3MC

What document provides instruction for tagout procedures?

TUM 50400-AD-URM-010-rev 7

What’s the purpose of CSMP?

Provide shipboard managers w/ a consolidated listing of deferred maint to identify the material condition of the ship

When a Navy NEC requires, DCPO or Safety PO is assigned substitution of other maintenance personnel is allowed to perform this maintenance?

No

What is the purpose of the tag out procedures

Prevent improper operation when component, equipment, system or portion of a system is isolated or in abnormal condition

Who is responsible for determining equipment IEM Status

DH

What do you use to decide scheduling of dual periodicity coded MRCs?

Notes in MIP and scheduling AIDS.

W/c category of IEM is accomplished on a reoccurring basis during the inactive period to prevent equipment deterioration

Periodic Maintenance

What required when you transfer hazmat to another container

Label

What’s the difference between a caution and warning statement on an MRC

Warning injuries/ caution causes equip damage.

Urgent FBRs are submitted how?

Naval message

W/c item meets criteria for a preferred maint action?

Req assistance from external activity and any maintenance is not expected to be accomplished by ships force w/in time frame prescribed by TYCOM

Y code in SYSCOM MRC control number 10 FLRP Y indicates?

Repair parts are required to perform the maintenance

OPNAVINST 4790/Cic Refers to

Ship’s configuration change form

C1 MYXN N N indicates

No parts required

When can a MIP NOT applicable to a work center be deleted

When FBR is approved for deletion of mip

What instruction dictates requirements for HAZMAT container labeling

OPNAINST 5100.19series

What should be reviewed by WCS a week prior

SKED forecasting report

What FBR Is technical in nature and is used to report technical discrepancies inhibiting PMS performance

CAT B

W/c person has authority to sign for issuing or clear tags and labels?

Authorizing Officer

Which is a convenient related maintenance

Q-3 (M-2)

When maintenance is completed by multiple people who is responsible for signing the 13 week accountability log

Person in charge or most senior person assigned

What does # sign mean next to a primary check?

Mandatory (mandatory related maintenance)

If the work candidate is a safety related discrepancy w/c section of the work candidate requires a brief description of the safety hazard involved?

Problem description

What is the intent of a spot check

Ensure the maintenance was completed and correctly performed.

What does a change in MIP and LOEP indicate?

C

Which maintenance actions ensures equipment is in a condition suitable for operation or to reactivate a piece of equipment or system for after a performed prolonged period of time?

SU start up

Situational requirements & unscheduled maintenance are examples of what?

Non Calendar Periodicity

When does a maintenance person sign for their maintenance?

After successfully completing maintenance

Who overall ensures 3M is functional & meets required standards?

CO

How many days can a work candidate be in the review and queue?

7

When may MP omit non applicable line items on an MRC that do not pertain to current equipment / configuration?

When step is followed by “if applicable” when a note identify steps to be omitted exist on MRC

Who is responsible for CSMP accuracy, content and weekly reviews w/ LCPO?

Divo