• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/50

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

50 Cards in this Set

  • Front
  • Back

Who is the Ship's 3M Manager?

XO

What document provides instructions and references required for use in the 3M system?

OPNAVINST 4790

What form is used for documenting installation of new equipment?

OPNAV Form 4790/CK

Given the following information: [00883] Tester, 500V, 100MO, SCAT-4452, what number would be used to locate the Tester in SPETRL?

00883

What is OPNAVINST 5100.19 (Series)?

Safety Precautions for Forces Afloat

On the MIP, MRC A-1 has a SYSCOM CONTROL # of 11 BWQD Y. What does the "Y" indicate?

Repair Parts are required

What does a "C" beside a MIL number on the LOEP mean?

A change to the MIP

In SKED, M-1(#R-1) signifies what?

Monthly one has mandatory related maintenance of R-1

T/F: The following operational PMS appears on your Work Center's Quarterly schedule: A-1(#Q-1). You are able to complete the A-1 MRC, but the Q-1 must be rescheduled due to corrective maintenance. The A-1 may be X'd off as complete, but the Q-1 must be rescheduled.

False

How many weeks are in a quarter?

13 weeks

A monthly MR can be scheduled at what interval?

3-6 weeks

The acronym SAR stands for what?

Situational Accomplishment Rate

To perform an equipment validation, you must first do what?

Open a configuration item

To check the status of parts ordered for your Work Center, you should do what?

Open your work candidate and check the status on the parts tab

A list of Repair parts and special tools required for the operation, overhaul and repair of equipment and components can be found in what?

COSAL

An Advance Change Notice (ACN) would be received when?

Whenever a change has been implemented to an existing maintenance requirement.

PMS schedules (boards) are produced using what computer program?

SKED

Who is required to review and sign the accountability log?

WCS, LCPO and DIVO

What does the acronym COSAL stand for?

Coordinated Shipboard Allowance List

T/F: The RPPO is responsible for maintaining a work center's RPPO log.

True

T/F: Maintaining a Work Center RPPO log is optional.

False

What is the maximum periodicity of a weekly (W) MRC?

Every Week

Who is the final approving authority, by signature, for the "Remain In Place" (RIP) chit?

CO

What would be an example of a Consumable item that is to be ordered using the "Non-Maint Supplies" menu in OMMS?

Hand tools

What program onboard is used for HAZMAT identification?

HMIS

What is a SCAT code?

A code used to identify test equipment

What does the acronym CSMP stand for?

Current Ships Maintenance Project

A check note can begin with what?

All of the Above

What color are secret MRC's?

Pink

T/F: A WARNING in an MRC can cause serious damage to equipment.

False

What manual contains all PMS requirements applicable to each Work Center?

43P1

The LOEP is a list of all what?

MIPS

Who must approve an IEM Memo before placing a piece of equipment into IEM?

Dept Head & XO

What can be found in the NSTM 300?

Electrical Safety Information

What does the acronym HMUG stand for?

Hazardous Materials Users Guide

Where can you verify the dates are correct on your Change Page in SKED?

Journal Tab

How long must an IEM letter be kept in your 43P1 before you can discard of it?

6 months after the item is taken out of IEM

Which person has the authority to sign for issuing or clearing tags and lables?

Authorizing Officer

When tagging out a piece of equipment that could jeopardize safety of personnel or endanger equipment, systems or components, which type of tag would you use?

Danger Tag

Which of the following would be considered lost checks?

Daily checks not accomplished

Who documents maintenance accomplished by outside activity?

SMMO

What type of tag would be used as a precautionary measure to provide temporary special instructions or to include that unusual action must be used to operate equipment?

Caution Tags

Who serves as the overall 3M Program technical expert and advisor?

3MC

When requesting a MIP be split between 2 work centers to ease accomplishment of maintenance requirements, what type of PMS Feed Back Report is submitted?

Category A

What reference is designed to provide the user with a ready reference for all aspects concerning the 3M program?

NAVSEAINST 4790.4D

Whose responsibility is it to give a weekly status update on the Work Center's 3M self-assessment program, CSMP, and PMS accomplishment to the Division Officer?

LCPO/LPO

What is a 7 character alphanumeric code assigned to each MRC?

SYSCOM MRC Control Number

What is status II IEM?

Equipment scheduled for overhaul for 7 days or greater

Who is the only person to place SKED in revision mode in order to ensure appropriate oversight of divisional PMS changes?

DIVO

What does CASREP stand for?

Casualty Report