Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
50 Cards in this Set
- Front
- Back
Who is the Ship's 3M Manager? |
XO |
|
What document provides instructions and references required for use in the 3M system? |
OPNAVINST 4790 |
|
What form is used for documenting installation of new equipment? |
OPNAV Form 4790/CK |
|
Given the following information: [00883] Tester, 500V, 100MO, SCAT-4452, what number would be used to locate the Tester in SPETRL? |
00883 |
|
What is OPNAVINST 5100.19 (Series)? |
Safety Precautions for Forces Afloat |
|
On the MIP, MRC A-1 has a SYSCOM CONTROL # of 11 BWQD Y. What does the "Y" indicate? |
Repair Parts are required |
|
What does a "C" beside a MIL number on the LOEP mean? |
A change to the MIP |
|
In SKED, M-1(#R-1) signifies what? |
Monthly one has mandatory related maintenance of R-1 |
|
T/F: The following operational PMS appears on your Work Center's Quarterly schedule: A-1(#Q-1). You are able to complete the A-1 MRC, but the Q-1 must be rescheduled due to corrective maintenance. The A-1 may be X'd off as complete, but the Q-1 must be rescheduled. |
False |
|
How many weeks are in a quarter? |
13 weeks |
|
A monthly MR can be scheduled at what interval? |
3-6 weeks |
|
The acronym SAR stands for what? |
Situational Accomplishment Rate |
|
To perform an equipment validation, you must first do what? |
Open a configuration item |
|
To check the status of parts ordered for your Work Center, you should do what? |
Open your work candidate and check the status on the parts tab |
|
A list of Repair parts and special tools required for the operation, overhaul and repair of equipment and components can be found in what? |
COSAL |
|
An Advance Change Notice (ACN) would be received when? |
Whenever a change has been implemented to an existing maintenance requirement. |
|
PMS schedules (boards) are produced using what computer program? |
SKED |
|
Who is required to review and sign the accountability log? |
WCS, LCPO and DIVO |
|
What does the acronym COSAL stand for? |
Coordinated Shipboard Allowance List |
|
T/F: The RPPO is responsible for maintaining a work center's RPPO log. |
True |
|
T/F: Maintaining a Work Center RPPO log is optional. |
False |
|
What is the maximum periodicity of a weekly (W) MRC? |
Every Week |
|
Who is the final approving authority, by signature, for the "Remain In Place" (RIP) chit? |
CO |
|
What would be an example of a Consumable item that is to be ordered using the "Non-Maint Supplies" menu in OMMS? |
Hand tools |
|
What program onboard is used for HAZMAT identification? |
HMIS |
|
What is a SCAT code? |
A code used to identify test equipment |
|
What does the acronym CSMP stand for? |
Current Ships Maintenance Project |
|
A check note can begin with what? |
All of the Above |
|
What color are secret MRC's? |
Pink |
|
T/F: A WARNING in an MRC can cause serious damage to equipment. |
False |
|
What manual contains all PMS requirements applicable to each Work Center? |
43P1 |
|
The LOEP is a list of all what? |
MIPS |
|
Who must approve an IEM Memo before placing a piece of equipment into IEM? |
Dept Head & XO |
|
What can be found in the NSTM 300? |
Electrical Safety Information |
|
What does the acronym HMUG stand for? |
Hazardous Materials Users Guide |
|
Where can you verify the dates are correct on your Change Page in SKED? |
Journal Tab |
|
How long must an IEM letter be kept in your 43P1 before you can discard of it? |
6 months after the item is taken out of IEM |
|
Which person has the authority to sign for issuing or clearing tags and lables? |
Authorizing Officer |
|
When tagging out a piece of equipment that could jeopardize safety of personnel or endanger equipment, systems or components, which type of tag would you use? |
Danger Tag |
|
Which of the following would be considered lost checks? |
Daily checks not accomplished |
|
Who documents maintenance accomplished by outside activity? |
SMMO |
|
What type of tag would be used as a precautionary measure to provide temporary special instructions or to include that unusual action must be used to operate equipment? |
Caution Tags |
|
Who serves as the overall 3M Program technical expert and advisor? |
3MC |
|
When requesting a MIP be split between 2 work centers to ease accomplishment of maintenance requirements, what type of PMS Feed Back Report is submitted? |
Category A |
|
What reference is designed to provide the user with a ready reference for all aspects concerning the 3M program? |
NAVSEAINST 4790.4D |
|
Whose responsibility is it to give a weekly status update on the Work Center's 3M self-assessment program, CSMP, and PMS accomplishment to the Division Officer? |
LCPO/LPO |
|
What is a 7 character alphanumeric code assigned to each MRC? |
SYSCOM MRC Control Number |
|
What is status II IEM? |
Equipment scheduled for overhaul for 7 days or greater |
|
Who is the only person to place SKED in revision mode in order to ensure appropriate oversight of divisional PMS changes? |
DIVO |
|
What does CASREP stand for? |
Casualty Report |