• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/61

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

61 Cards in this Set

  • Front
  • Back

What does the acronym ACN stand for?

Advance change notice

What does unscheduled maintenance MRC document?

Actions required to restore a system/equipment to a predetermined operational condition

Which of the following periodicities is a non-calendar periodicity?

R-1, R-1D, R-1W, R-1M, R-2M

A quarterly schedule covers what time period

Three months

Which of the following information is NOT contained in the 13-week accountability log?

Job sequence number (JSN)


tag out serial number (contained)


Printed name (contained)


Date (contained)

What action is required to fix equipment that has failed or is not working to desired performance standards?

Corrective maintenance

What is one of the purpose of the tag -out user's manual?

Prevents improper operation when component, equipment, system or portion of a system is isolated or in an abnormal condition

Who fills out the record sheet and prepares the tags?

Ship's force pretty officer in charge of the operation/work item

When does the maintenance person performing PMS sign for accomplishment?

After completion of the maintenance

Who has overall responsibility for ensuring maintenance is accomplished following the 3M system?

Commanding officer

What is the periodicity for MRC D-1R

Daily and situational requirement

Which statement best describes the Equipment Guide List (EGL)

It is used with a controlling MRC, when the MRC applies to a number of identical items. (All items on an EGL have to be completed for checks to be marked off as completed) EGL cannot exceed 8 hours of work

A ______ is used to provide temporary special instructions or to indicate that unusual action must be exercise to operate equipment.

Caution tag

A ______ is a four-digit number assigned by the work center to the maintenance action, or assigned by the outside activity performing the work?

Job sequence number (JSN)

The Standard PMS Identification Guide (SPMIG) consists of ____ categories.

5

What is used to assign and monitor the accomplishment of required PMS tasks by work center personnel?

Weekly PMS schedule

What does the acronym PMS stand for?

Planned Maintenance System

What does the acronym SPIN stand for?

Standard PMS Item Name

Which of the following safety precautions apply to death or injury?

Warning

On the weekly schedule, whose responsibility is it to "X" off the maintenance requirements that have been fully accomplished?

Work Center Supervisor

Which category of IEM is accomplished on a recurring basis, during the inactive period, to prevent equipment deterioration?

Periodic Maintenance (PM)

What does SPMIG Category I refer to?

Test equipment

The maintenance index pages are .....

Basic PMS reference document.

What Volume and Chapters of the COMUSFLTFORCOMINST 4790.3 (JFMM) pertain to PMS and MDS?

Volume VI, Chapter 5 and 19

ET Division, in Operation Department, owns and performs maintenance on various electrical tools, what division or work center can receive portable electrical tools from the ETs?

No Division or work center

What instruction dictates the requirements for HAZMAT container labeling?

OPNAVINST 5109.19 series

The PMS Cycle will be determined at the discretion of the Tour Commander but will not be exceed _____ quarters.

24

Who is the ship's 3M manager?

XO

Who reviews MRCs and promptly submits a PMS TFBR, whenever maintenance requirement are not fully understood and error exist?

Work Center Supervisor

What is the requirement for repair parts to be listed on an APL?

List repair parts expected to fail during normal operation

Which PMS schedule, displayed in the work center, displays PMS requirements to be performed during a specific 3-month period?

Quarterly board

What does the acronym TGL stand for?

Tag Guide List

______ are prepared and issued for each installed system/equipment for which PMS support had been established

Maintenance Index Pages

Which of the following provides a listing of all maintenance index page for a workcentre within the 43P1?

List of Effective Pages (LOEP)

In the "Procedure" block, work center supervisors may line out the non-applicable line items (alternate procedures) that do not pertain to current equipment/configuration when the step is followed with the word "if applicable" or a note identifying the steps to be omitted. These items must be reviewed and initial by the ______

Division leading chief petty officer/leading petty officer

As a qualified maintenance person, what do you do upon completion of preventive maintenance?

Signed the accountability log immediately upon completion of the maintenance action

What is another name for the List of Effective Pages (LOEP)?

PMS-5

What is the periodic rate for an MRC which begins with the letter Q?

Quarterly

If multiple maintenance persons are signed to a single maintenance action who must sign the 13-week accountability log?

The most senior person assigned

Who will insure that all material deficiencies are properly and promptly documented?

Department head

The ____ shall independently ensure that the correct component is tag and check (verify) for proper component positioning and tag attachments.

Second person

What form is used to report the completion of corrective maintenance action or deferred maintenance actions?

Ships maintenance action form (OPNAV 4790 2K)

What symbol is used to indicate mandatory related maintenance associated with a schedule maintenance requirement?

Pound sign #

What does SPMIG category II refers to?

Materials

_____ actions are those conducted to determine that operational conditions of the equipment, its ability to function as designed, and to be integrated with other requirements to form a system.

Operational test (OT)

What are the categories of preliminary PMS documentation?

Preliminary MRIs with and without MRCs

which of the following is NOT a category of IEM?

Mandatory test (MT)

How much maintenance can be listed on an EGL?

As much as the person can complete in one day (24 hours)

What does SPMIG category IV refers to?

Tools

What does SPMIG Category III refer to?

Parts

Who reviews and initials LOEP, MIP and MRC line outs?

Divisional LCPO

When preparing a quarterly PMS schedule, how are prospective underway dates identified?

The dates are shaded across the top through the tick marks on the date bar

How are man-hours listed on the MRC card?

Hours and tenths of hours

What reference requires all priority change or an any updates to the work candidate to be documented and block 35 (remarks)?

NAVSEAINST 4790.8C

What type of MRCs are printed on pink stock?

Classified

What is the four segments code used in cataloging MIPs?

Conventional MIP cataloging

How is "unscheduled" maintenance requirement card (MRC) designated?

U-1

The _____ supplements, but does not replace, the technical data found in Material Safety Data Sheets (MSDS).

NSTM 670 ( hazardous material users guide "HMUG")

What are recurring maintenance action accomplish during an inactive. To prevent equipment deterioration?

Periodic maintenance (PM)

Who was responsible for the proper performance of the 3M system functions within their respective work center?

Work center supervisor

What is the focal point for receipt and distribution of Maintenance and material data?

3M system central database