• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/131

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

131 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)

Builds and maintains the PMS schedules

WCS

Assigns crew members to the work center

WCS

Assigns crew members to accomplish maintenance

WCS

Customizes the PMS documents (review and omit)

WCS

Generates original FBRs

WCS

Monitors situational events (R- checks)

WCS

Performs weekly closeouts

WCS

Records the accomplishment and rescheduling of maintenance tasks

WCS

Indicates the Inactive Equipment Maintenance (IEM)

WCS

Person

Explains reasons maintenance is out of periodicity as a result of PMS Alerts

WCS

Posts the 13-week report for crew members to use

WCS

Works alongside the Division Officer

LCPO

Reviews schedules

LCPO

Conducts spot checks

LCPO, DIVO, & DH

3 people

Signs FBRs

LCPO, DIVO, & HOD

Shares the same view as the LCPO

DIVO

Has some approval authority

DIVO

The next in the chain of command after the DIVO and is responsible for all workcenters within his/her department

DH

Approves workcenter PMS schedules

DH

Approves lineouts (review and omit)

DH

Assigned to a workcenter and report to the workcenter supervisor

Maintenance Man

Reviews the 13-week report

Maintenance Man

Determines what maintenance tasks he/she is assigned

Maintenance Man

Determines when the maintenance tasks are due

Maintenance Man

Used for tracking jobs, and is sequentially off of the workcenter work candidate log

Job Sequence Number (JSN)

7 character code that identifies the equipment

EIC

1st character of EIC...

Identifies the system

1st and 2nd characters of EIC together...

Identify subsystem

3rd and 4th characters of EIC

Identify the equipment category

Remaining 3 characters of EIC...

Identify parts data useful for engineers

A job for a discrepancy or irregularity including part request

2K OPNAV 4790/CKs or Work Candidates

Used to report the accomplishment of maintenance actions that are related to an alteration or result in a configuration change

CK Ships Configuration Change Form

This form is used to provide amplifying information (such as drawings and listings) related to a maintenance action, reported on a OPNAV 4790/2K Form

2L

Provide shipboard maintenance managers with a consolidated listing of deferred maintenance to identify the material condition of the ship. Forecasts money allotment for maintenance of the ship

Current Ship's Maintenance Project (CSMP)

Computerized system that stores maintenance data and is capable of generating shipboard reports.

Automated Shore Interface (ASI)

Explain the relationship between CSMP and supply requisition forms

Supply requisition forms are generated through OMMA. Enter in the equipment's APL and the diagram of parts will come up. Select the part needed and the system will generate the requisition

Who must approve a revision for your work center in SKED 3.2?

DH

T/F: When you generate the R-check Report from SKED 3.2, it will list all R-checks for your work center (active and inactive)

FALSE

What is the acronym SCAR?

Spot Check Accomplishment Rating

Who must approve equipment to go into IEM?

DH

What does an asterisk mean following a periodicity code?

Maintenance is a safety of ship item

Number assigned to tools, parts, material, and test equipment

Standard PMS Item Number (SPIN)

Has overall responsibility for ensuring maintenance is accomplished following 3M system and quality maintenance procedures and that the 3M system functions within command

CO

Provide amplifying instructions for scheduling of maintenance requirements

Scheduling Aids

Serves as the key 3M system assistant to the XO

3MC

Functional manager of the 3M system and is responsible to the XO for the coordination and direct supervision of all admin facets of the 3M system program

3MC

Acts as final reviewer for maintenance responsibility shifts between departments

XO

The command's 3M system manager and is responsible to the CO for the overall management of the 3M system program

XO

A 7 character alphanumeric code which is assigned to each MRC

System MRC Control Number

A _____ following the periodicity code indicates that this procedure is intended to be scheduled and performed by off-ship maintenance personnel

Single Plus (+)

A ______ following the periodicity code indicates that this procedure is intended to be scheduled and performed by either ship's force or off-ship maintenance personnel

Double plus (++)

Mandatory related maintenance from another MIP is indicated as...

IL-017/003:M-4W#

Corrective in nature used to return system or equipment to operational condition within predetermined tolerances or limitations

Unscheduled maintenance

The MIP series code is the portion of the _____ prior to the slash (/) of the _______ containing the MRC

System MIP Control Number

What are the 3 categories of periodicities?

- Calendar


- Noncalendar


- IEM

(CODE) When a situation occurs, accomplish weekly

R-1W

(CODE) Quarterly or prior to getting underway, whichever occurs first

Q-1R

(CODE) Semiannually or during each upkeep period, whichever occurs first

S-1R

(CODE) Weekly or after each use, whichever occurs first

W-3R


(WEEKLY/AFT3R)

(CODE) Monthly or every 600 operating hours, whichever occurs first

M-1R

A persistent event that can be tracked over duration of time (in days)

State Event

An event that is based on the current value of a measurement in relation to the value at the time of the last accomplishment

Metered Event

A single occurrence that may have maintenance action tied to it

Trigger Event

Has frequent meetings with 3MC and XO to discuss 3M system matters and to provide necessary guidance and coordination

CO

What is required to reschedule a check to a later date outside week originally scheduled?

Check Note

Which component in SKED grades you on the timely acknowledgment and approvals of lineouts, FBRs, weekly closeouts, and alerts?

AAR

Who is required to correct and resubmit for approval return to ship (RTS) and/or hold work candidates weekly?

SMMO

When viewing a MIP in the PMS viewer, what is indicated if an MIP SYSCOM of the screen (the outline pane) is highlighted in BLUE with a YELLOW question mark?

MIP was changed since last force revision

Where is the ship state annotated in SKED?

In my task tab

Where is the ship state annotated in SKED?

In my task tab

What is indicated on a MIP if the S-1 has a "51001073:M-2" in the "Related Maint" column?

Convenience Related Maintenance

Blue folder MIP means...

No PMS alters for its MRC

Who signs a FBR or revision?

LCPO


DIVO


DH

A tagout module used to automate the tasks of generating danger and caution tagouts and printing tagout forms and tags

ESOMS

Assigned in writing by Department Head to coordinate and supervise maintenance within the department

Department 3MA

What guidance can be found in chapter C-9 of 5100.19?

Electrical safety and tagout

Green X means

Complete

How many types of FBRs are there?

2


Cat A


Cat B

Red pencil means

Unapproved lineouts

What actions are required by WCS if an item listed in the TMPTE Block is not called for anywhere in the procedures of the MRC?

Submit FBR

In the Other column of the MIP,


"H" denotes...

Calibration maintenance requirement

Which of the following is NOT an omitted check?

Lineouts of MIP/MRCs w/ approved FBR

Which of the following is NOT an omitted check?

Lineouts of MIP/MRCs w/ approved FBR

# means...

Mandatory related maintenance

How is no related maintenance indicated on the MIP?

None

Blue pencil means...

Approved lineouts

What is the date code for MRC issued in November 2019?

B9

Describe Sys Control Number "17HORBY"

17: month/year (jan/2017)


HORB: Serial number


Y: Yes, parts completed

All ACN are sent via...

Encrypted email

All ACN are maintained by...

WCS

Cent sign means...

Completed by higher authority

After weekly maintenance tasks have been completed, who shall perform the function known as "weekly closeout" in SKED?

WCS

What is the acronym "PAR"?

Periodic Accomplishment Rating

What is the acronym "SAR"?

Situational Accomplishment Rating

How many equipment validations are due each week with your 3M reports, at a minimum?

2

T/F:


SKED will generate an alert if the system automatically reschedules an MRC not marked as complete, no matter if the MRC is still in periodicity or not

False

Of the following entries, which is acceptable for a "problem description" for a work candidate?

Valve packing leaks by____, packing gland has been tightened to its limit

What type of FBR is submitted for safety-related issues on an MRC?

Urgent

Pen and in changes are sent as...

TFBR responses

What does a red line through a MIP mean? Blue?

Red: lineout has not been approved


Blue: approved

Red tag means...

Tagout required

Who must approve equipment to enter IEM?

DH

What is the acronym "SCAR"?

Spot Check Accomplishment Rating

Red circle means...

Lost

"#" with "!" means...

Mandatory related maintenance child check

The "+" following the periodicity code indicates...

Off-ship maintenance personnel perform requirement

What is C1, C9, C12, and C23?

C1: Basic Safety


C9: Electrical Safety


C12: Aircraft Safety


C23: Hazmat Safety

What is the ship's 3M manual?

NAVSEAINST 4790.8C

"#" means...

Mandatory related maintenance parent check

What is the ship's 3M system policy?

4790.4

What signatures are needed to close out the 13 Week Log?

WCS/LCPO/DIVO

What signatures are needed to close out the 13 Week Log?

WCS/LCPO/DIVO

PMS does not provide what?

Corrective procedures to restore equipment to full readiness conditions

What is a PMS-5 report?

List of effective pages

Who initials lineouts on MIPs?

LCPO

T/F:


The new maintenance quarter starts on the 1st of January, April, July, and October no matter what day the 1st falls on

False (it starts on the first Monday)

Where would you look to see if a FBR report is required to justify that lineout?

In the scheduling aids section of that MIP

What document contains all checks that are scheduled for completion in a particular week?

13 Week Report

Who is directly responsible for the administration and quality of the spot check program?

Both B and C

What guide or instruction deals mainly with safety precautions for hazmat?

NSTM 670 VOL II

Under review section in SKED, pages are the same as folders but for...

MRCs themselves

When placing a piece of equipment in IEM, which status should be used for equipment that will be inactive for 7 days or longer and IS subject to corrective maintenance and overhaul?

Status II

When placing a piece of equipment in IEM, which status should be used for equipment that will be inactive for 7 days or longer and IS subject to corrective maintenance and overhaul?

Status II

When placing a piece of equipment in IEM, which status should be used for equipment that will be inactive for 7 days or longer and is NOT subject to corrective maintenance and overhaul?

STATUS I

How often must quarterly maintenance requirements be scheduled?

24 months following the last accomplishment

The WCS's signature on the "record of changes" page denotes what?

The list of effective pages


all maintenance index pages


MRCs


location guide list has been reviewed for accuracy and installed in the work center's PMS documentation

Category A FBRs are...

Nontechnical

Category B FBRs are...

Technical

Assigned in writing by DH to coordinate and supervise maintenance within the department

Department 3MA

A tagout module used to automate the tasks of generating danger and caution tagouts and printing tagout forms and tags

ESOMS

A tagout module used to automate the tasks of generating danger and caution tagouts and printing tagout forms and tags

ESOMS