• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/38

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

38 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)
OPNAV 4790/2L form
is used to provide amplifying information, drawings, and serial numbers relating to a corresponding deferred action - deferring to resident experts - a study of what the problem is
2L - think "later"
NAVSUP 1250-1 Form
the Supply Standard Requisition Form
During tag-out (danger) of a piece of equipment, the duties of second person checking the tags.
- Make sure that the number of tags satisfactorily ISOLATES the equipment.
- Inspect the ACCURACY and completeness of the tag-out.
- Make sure the tags are HUNG properly
GDAPL
•General Distribution Allowance Parts List the COSAL (Coordinated Shipboard Allowance List) tool that contains all current APL's/ AEL's and offers access and retrieval capabilities previously available in microfiche.
The time restriction on the use of laminated "danger" tags in performing PMS requirements is
During normal working hours only
Laminated "danger" tags of the PMS tag-out is
authorized for use on all shipboard equipment without restriction only.
Preventive Maintenance is
a maintenance which is performed as a minimum requirement to maintain equipment with in specifications
PMS FBR (cat B)
This type of feedback report is used to report technical discrepancies inhibiting PMS performance and/or the need of TYCOM assistance.
SKED - automates:
generates:
as well as (4):
is a PMS program that automates PMS scheduling process generating Cycle, Quarterly, and Weekly schedules as well as TGL's, EGL's, RAR's, and ACF's
Who can shift maintenance and approve one work center to another under PMS FBR category B?
Executive Officer
Mandatory maintenance requirements are identified by:
Which PMS schedule?
(#) next to item - written on the quarterly PMS schedule
Reschedule Column of the PMS Quarterly schedule is utilized
to indicate Semiannual and longer MR's not accomplished but still within periodicity
•The interval of accomplishment for maintenance periodicity
M
Q
S
A
M- 1 3-6 weeks,
Q- 2-4 months,
S- 4-8 months,
A- 3-5 Quarters.
Marking the underway time in the SKED program can be done
before and after the Department Head finalize the quarterly schedule.
•Flip Page Report in the SKED is equivalent of
entering comments on the reverse side of the Quarterly Schedule.
• RAR
(Record Accomplishment Rate) SKED report determines the percentage of qualifying scheduled maintenance requirements that has been accomplished.
Revision Wizard in SKED feature allows who to do what?
Work Center Supervisors to make changes in the PMS boards such as ACNs (Advance Change Notices), DIT's, FR's, and Administrative change entries.
• Cycle PMS Schedule displays
the Planned Maintenance requirements to be performed during the period between major overhauls of the ship
• Equipment not supported by PMS will continue to be maintained until PMS is developed and installed by using
Manufacturer's Technical Manuals
Syscom MRC Control Numbers are used to identify:
If first 2 digits are underlined, this indicates:
those MRC's listed on the MIP. If the first two digits of the Syscom MRC are underlined, this indicates NEW and/ or REVISED MRC.
• PMS supersedes all previous planned or preventive maintenance systems or programs, where
a difference between the requirements and/ or procedures of PMS and other technical publications exist, PMS will prevail
• EGL form is used in conjunction with a controlling MRC when
the MRC applies to a number of identical items and contains no more than a single day's work
• Department Head signs and approves
Cycle and Quarterly PMS schedules
• TIC marks shaded in the Quarterly schedule is used to indicate
During underway period
• The man-hours listed on the MRC denotes
the amount of time to complete the check as describe in the procedures listed in the card.
OPNAVINST 5100.19 series
is the standard reference for Safety Precautions for Forces Afloat
• When can Work Center Supervisors line out line items in the "Procedure" block of the MRC?
When the non-applicable line item or step is followed by the word "if applicable" or a note identifying steps to be omitted
With regard to frequency of PMS actions, each command has the perogative to
INCREASE the frequency of performance of specified PMS actions to meet local conditions - never DECREASE
• Quarterly and below checks maintenance requirements is on
the "Schedule Quarter After Overhaul" columns of the Cycle PMS Schedule.
• Scheduling Aids
is the amplifying instructions that are noted in the maintenance requirement description block of a MIP.
• Maintenance requirement that can be accomplished concurrently with another maintenance requirement is called
Convenience Related Maintenance
• A Work Candidate in OMMS-NG cannot be deleted if
there are unprocessed parts orders associated with it and has ever been reported off the ship.
• The purpose of the Planned Maintenance System (PMS) is to
provide a standard system for planning, scheduling, controlling, and performing maintenance on all equipment
A maintenance requirement accomplished by a higher authority is marked with:
On which schedule?
Cent sign on the Quarterly PMS schedule.
The computation of RAR automatic scheduling program (SKED2)doesn't count for which type of checks?
RESCHEDULED checks
Crew Accomplishment Report (SKED Report) is
information concerning the work actually accomplished by crew members and produces a listing of PMS actions completed by an individual crew during a selected week
3 things are a part of a Tag-Out Record:
Tag Out Instructions
Instrument Log (calibrations)
Index Page
• The schedule verification feature of the SKED2 program annotates Maintenance Requirement checks that are out of periodicity is by
Marking the MR in red