• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/45

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

45 Cards in this Set

  • Front
  • Back
what is the 3m manual
NAVSEAINST 4790.8b
what is the safty manual
OPNAVINST 5100.19e
what is the papa manual
43P1
OMMS-NG
organizational maintainance managment system next genaration
CSMP
current ships maintenance project
COSAL
coordinated shipboard allowance list
APL/AEL
allowance parts/equipage list
OPNAV 4790/ck
Configuration change
OPNAV 4790/2K
work canidate
opnav 4790/2L
Supplementary form(drawings and listings)
what is a FORCE REVISION
archive quarter,sighn change page, update LOEP + MIP + MRC's
how many quarters are in a year
4 (jan,apr,jul,oct)
who signs the cycle board
dept head
who signs the weekly board
DIVO
ACN
advance change notice- pen changes only for urgently requiered changes due to personel or equip saftey
* next to periodicity mean what
indicates safty of a ship item and reqiers the ship/user to comply w/ CINCPACFLTINST 4790.3 joint fleet maintenace manual
periodicity range-monthly
3-6 weeks
periodicity range- quarterly
2 to 4 months
periodicity range -SEMI ANUALLY
4-8 months
periodicity range-annually
3-5 quarters
who signs the 13 week report
WCS and DIVO
what does # mean
mandatory related maintence
IEM catagory 1
remains onboard; 30 days or more inactive
IEM catagory 2
30 days or more requires corrective maintenance, removed off the ship
LU
LAY UP
RAR
recorded accomplisment rate
ACF
accomplisment confidence factor
how often do we audit tags
weekly
FBR
feed back report
FBR-cat A
non-technical
FBR-cat B
technical
FBR-urgent
involves safty of personell
SPMIG
standard pms material identification guide
who electronicly signs FBR
DIVO,DH,3MC
how many quarters are in a cycle board
24
what is the PMS 5A
Work Center PMS Manual
what does it mean if blocks are shaded on the 13 week report
underway
what is one thing you can change on the MRC that does not need the TYCOMS aprovall
tools
what are the two types of related maitenance and describe both
 Mandatory related maintenance – maintenance requirements that must be accomplished concurrently with another maintenance requirement. # symbol indicates mandatory related maintenance.....
 Convenience related maintenance – maintenance requirements that can be accomplished concurrently with another maintenance requirement. # symbol is omitted.
2 parts of 3M
PMS and MDS
what are the different types of tags
warning and caution ...know the difference
where would you find and order parts or material related to maitenance
SPMIG
what does 18m-2r mean
every 18 months or when requiered
MAINTENANCE ACTIONS FOR IEM
LU – Lay–Up Maintenance
PM – Periodic Maintenance
SU – Start Up Maintenance
OT – Operational Test
OME REASONS FOR USING A FBR MIGHT BE:
SHIFT OF MAINTENANCE RESPONSIBILITY
REQUEST FOR TECHNICAL INFO
ADDING OR DELETING MIPs AND MRCs TO A WORK CENTER.