Custom Boat Builders

Great Essays
Custom boat builders are an international inc. Custom boat builders having a team of full time designers’ and drafters that use the AutoCAD along with Solidworks and Rhino for 3D modeling. The company is a liaison between naval architects and owners of shop floor who assist in the design process. The Company works with owners of naval architects in cabinetry, exterior solutions and electrical. Although the company is capable of working on non-marine projects that involve residential housing, the company majorly involves itself in marine projects. Such projects involve new build or re-fit. The company has more than 20 years experience and hence it can guide any project to any building phase. The company also deals with boat parts manufacturing …show more content…
Shortening of the deadline will not only benefit the client, but also protect the company’s profitability. The client is likely to benefit from a shortened deadline, since he is capable of planning in advance, requesting for any modification and ensuring that all preparations are within the time limit for business commencement. The company is also likely to benefit from a reduced timeline by minimizing on production cost; the longer the period of production the more the cost and vice versa. The production timeline as projected in our initial project is one year i.e. summer 2015. The redefined timeline is supposed to be 8 months. The timeline would also be shorter by at least 6 months, however the production costs may seem higher. It is therefore reasonable to work with this timeline, since it is reasonably dependant on the budget and the type of commercial boat that is required by the client. This decision influenced the success of the company positively. Even though there were challenges such as client complaining over cut corners and a less complex commercial boat, such complaints had been reduced by a quite larger margin since the commercial boat was delivered on time; a standard boat of high quality was presented to the client, and room for redesigning under a less agreeable cost was also put in place. Finally the client gave a positive feedback. The company was also able to …show more content…
An alternate scope, such as re-modifying an already stock boat rather than a custom boat would prove cheaper and hence meet the defined timeframe. A stock boat is one that was originally designed and developed as a new custom boat for a client so as to suit certain defined requirements; these unique designs would later on result to specific solutions for a client. These custom designs are then subsequently presented as stock boat building plans. A custom boat requires the services of an engineer, a longer time frame in the designing process which is approximately 2 months and a proper planning before commencement of the project. More than 80% of the clients are always satisfied with the company boat plans rather than their own custom designs (Bryde, 2005). The client is therefore likely to be attracted by the stock boat rather than his own custom designs. It was therefore necessary to work with a stock a boat rather than a custom boat and hence proved successful since the company was able to present the boat within the defined period and as per the budget. The company was also able to generate profit from the

Related Documents

  • Decent Essays

    Hrm/531 Week 2

    • 556 Words
    • 3 Pages

    2. Set up specific metrics based on your industry: The Company should be able to cut back the wastage of time to a certain extent and will be able to save money to a certain extent. 3. Perform regular post implementation results: The Company should check into the delivery history and check for any possible delays and should be determine if they were caused by system…

    • 556 Words
    • 3 Pages
    Decent Essays
  • Improved Essays

    Hrm 531 Week 2 Mini Case

    • 594 Words
    • 3 Pages

    Mr. Ray, As requested, I have attached list of “end-of-year actions” we can possibly take to improve our annual earnings growth to this memo. We have many options available to us, but we need to tread carefully as some of those options might put us into very difficult position. Without further due, our options include the following: a. Deferring December’s routine monthly maintenance on packaging equipment by an independent contractor until January of next year.…

    • 594 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    Becoming a certified boat coxswain is the goal and responsibility of all third class boatswains’ mates. I would like the Coast Guard to establish a cohesive plan to train, and fund education to generate qualified BM3 coxswains in the U.S. Coast Guard Reserve. Once they graduate A-school there is no solid plan or funding to ensure the reserve member’s training stays on schedule and completes their training within the required time frame. The process for a Reserve BM3 to become a coxswain is a long and difficult journey.…

    • 778 Words
    • 4 Pages
    Improved Essays
  • Decent Essays

    Legacy Boating Club

    • 263 Words
    • 2 Pages

    For more than a dozen seasons, Legacy Boating Club of Orange Beach has provided a smart alternative for the boat lovers of the Gulf Coast. This members-only, private boat club gives members who prefer not to own their own boats an easy and affordable way to enjoy exciting days at sea whenever they please. So how does the club work? Legacy Boating Club of Orange Beach owns and maintains an elite fleet of powerboats, including Waverunners, center console fishing boats, and pontoons.…

    • 263 Words
    • 2 Pages
    Decent Essays
  • Decent Essays

    Learn About Nutrex Hawaii’s BioAstin Canoe Team Nutrex Hawaii has put together a canoe team to help spread the word about astaxanthin, an amazing antioxidant that has been shown to support joints and tendons and skin, cardiovascular, eye, and brain health. It also has been shown to work as a pain reliever and to reduce inflammation. The canoe team will be participating in events hosted by The Hawaiian Sailing Canoe Association, supporting the associations’ mission encouraging the learning, reviving, educating, and practicing of ancient Hawaiian Skills. The Hawaiian Sailing Canoe Association The Hawaiian Sailing Canoe Association is a non-profit organization that uses the sport of sailing canoes to fulfill its mission to spread the practicing…

    • 354 Words
    • 2 Pages
    Decent Essays
  • Improved Essays

    The Open Boat Analysis

    • 615 Words
    • 3 Pages

    The experience of reading Crane’s The Open Boat, isn’t distinctly adrenaline pumping nor is it overwhelmingly emotional. The reader, as well as the men in the boat, do end in a starkly different scenario than when they began their journey, but the movement is often hard to pin point. In fact, the narrative is contrasted so that there are gaps, physical and literary as well as tonally. Shawn Michelle Smith investigates a similar scenario in her analysis of Muybridge’s photo framing.…

    • 615 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    Does anyone know the meaning of Boat People? The Columbia Encyclopedia defined that, “Boat people, term used to describe the Indochinese refugees who fled Communist rule after the Vietnam War.” That was me thirty-three years ago. My younger brother and I escaped from Viet Nam together with fifty-four strangers on March 26, 1982, on a little boat that was only big enough for us to sit neatly face to face with our legs folded up to our chest. After four days and five nights, we arrived to Ku Ku camp in Indonesia Island, agitated, ravenous, and exhausted.…

    • 888 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Scheduling Boat Covers

    • 694 Words
    • 3 Pages

    No one wants to spend hours cleaning and prepping a boat to be able to go fishing. Ideally we would like to be able to throw the gear in the boat and take off. This can be accomplished if we had the forethought to purchase and use a boat cover to prevent the dirt, debris and even insect & animal nests from becoming a part of our boat's interior over the winter months. Any type of maintenance takes away from the fun we want to have on our boat. So what types of covers are there for the boat?…

    • 694 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    Ferdoushi Akhtar Hashi Chowdhury 23/03/2018 Liability in Civil Engineering – A Case Study Carillion Construction Ltd v Woods Bagot Europe Ltd & Ors [2016] EWHC 905 (TCC) Introduction This report presents a liability case study regarding the extension of deadlines in civil engineering projects, and the damages that might occur as a result of these delays. The liability aspect of the dispute presented in this report are reviewed and discussed, highlighting the importance understanding the implications of any delays in civil engineering projects.…

    • 730 Words
    • 3 Pages
    Improved Essays
  • Decent Essays

    OBJECTIVE To secure a position where I can continue to resolve various challenges in a prompt & professional manner while ensuring 100% safety on the job at all times. HIGHLIGHTS OF SKILLS  Deadline-driven individual with 9+ years of solid work experience & skills in completing tasks within a busy & challenging work environment in order to increase business growth & quality of service  Highly skilled & knowledgeable in servicing, maintaining & diagnosing on/off road equipment which results in all jobs to be completed ahead of schedule and with zero interruptions  Effective team-player & problem-solver which is reflected through current role as a Millwright for the large construction services provider (for Oil Sand companies),…

    • 946 Words
    • 4 Pages
    Decent Essays
  • Improved Essays

    ABSTRACT This paper proposes who should the project stakeholders, project sponsor, and the project manager be in the launching of newly designed room-sized plastic storage unit of Winsome Manufacturing Company. This paper also took the opportunity to explain what the communication process will be and how the project charter will manage the whole project. This paper considers to help the head of the marketing department of Winsome Manufacturing Company to present the finding made. INTRODUCTION…

    • 1068 Words
    • 5 Pages
    Improved Essays
  • Great Essays

    Woody 2000 Case Study

    • 1292 Words
    • 6 Pages

    Project Planning a. What should be included in a Woody 2000 project plan? What use would it be? Ans. The project requires the creation of a project scope, charter, schedule, budget, communication, risk, contingency, and close out plan thereby ensuring that the project are is well defined, communicated, monitored and controlled. Woody's project plan should also include: - Sales Assessment-…

    • 1292 Words
    • 6 Pages
    Great Essays
  • Improved Essays

    Furthermore, it is timely as the business set a time-bound which is 2020 to increase the revenue and take 20% market share as…

    • 941 Words
    • 4 Pages
    Improved Essays
  • Great Essays

    The Open Boat Analysis

    • 1736 Words
    • 7 Pages

    Realism and naturalism are two different literary movements, but they have many similarities. Realism expresses real life situations and focuses on a true illustration of life while naturalism is represented like an overstated type of realism. Naturalism is based on humans versus a force that is out of their control. Short stories in American literature portray realism and naturalism in many ways. Editha, The Open Boat, and An Occurrence at Owl Creek Bridge are all based on these literary movements.…

    • 1736 Words
    • 7 Pages
    Great Essays
  • Improved Essays

    The cost of delay has actually risk the project to cost for $12 billion. 1.2 Outsourcing Upon Outsourcing from the journal article of (Forbes, 2015) Boeing made several problems in their decision to outsource their aircraft plan. The purpose is to reduce the project plan time of Dreamliner from 6 years to 4 years and cost from $10 billion to $6 billion however, the project plan does not turn out to be exactly with the plan, Boeing suffer from delay of 3 more year ahead from it planned and thus led to over budget of billions dollars.…

    • 1121 Words
    • 5 Pages
    Improved Essays