Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
94 Cards in this Set
- Front
- Back
Used to lift Deck Edge ACE Platform? |
Hydraulic engines, sleeves and wire ropes. |
|
What component provides the force to lift the platform? |
Hydraulic Engines |
|
What should proceed a rated load test for ACE? |
Component inspection and operational test |
|
Aircraft carrier has how many Deck edge ACE’s? |
Four |
|
How many lift points are there on ACE platforms and what kind? |
Four-point wire rope suspension that constrains the platform to move vertically |
|
What are the location of the ACE platforms on Aircraft carriers? |
ACE 1,2 and 3 are on the port side. ACE 4 is on the Starboard side. |
|
What is the difference between ACE’s? |
No. 1 has provisions for stopping at Avionics shop #11. No. 3 equipped with a Boat and airplane crane boom interlock circuit No. 4 is equipped with a suspend operation circuit to prevent down operations and allows landing opperations |
|
What platform has folding Deck Edges ACE’s? |
LHA6/LHD1 class ships |
|
What type of ACE are used on LHD and LHA platforms? |
Guide Rail and Cable Lift |
|
How are LHD and LHA ACE’s driven? |
By a horizontal hydraulic cylinder and ram applied cables and sheaves. |
|
What contains a general description and instructions covering installation, operation, care and maintenance? |
Technical Manual (TM) |
|
What information is in Technical Manual (TM)? |
1. General Information and Safety 2. Description 3. Function 4. Scheduled maintenance 5. Troubleshooting 6. Corrective Maintenance 7. Illustrated Parts Breakdown |
|
How many volumes are there for CVN, LHA and LHD ACE technical manual? |
Two |
|
Deck Edge ACE TM volume 1 provides? |
Function description and the necessary information required for Operation and Troubleshooting |
|
TM Volume one chapter 1 provides what information? |
General Information and Safety Precautions |
|
chapter two of the TM provides what information? |
Operations |
|
Chapter three of TM provides what information? |
Function Description |
|
Chapter four of TM provides? |
Scheduled maintenance |
|
Chapter five of TM provides? |
Troubleshooting |
|
TM Volume two provides what information? |
Corrective Maintenance, Adjustment, Repair, and Replacement procedures as well as an IPB |
|
ACE TM Volume two chapter six provides? |
Corrective Maintenance CM |
|
ACE TM Volume two chapter six provides? |
Corrective Maintenance CM |
|
ACE TM Volume two chapter seven provides? |
IPB |
|
ACE TM Volume two chapter eight provides? |
Engineering drawings |
|
Naval Safety and Occupational Health SOH Program for Forces Afloat? |
OPNAVINST 5100.19(series) |
|
Standard Organization and Regulations Manual? |
OPNAVINST 3120.32 (series) |
|
Joint Fleet Maintenance Manual (JFMM)? |
COMUSFLTFORCOMINST. 4790.3 (series) |
|
What information does the NSTM provide? |
Technical information to afloat personnel for supervision, operation and maintenance |
|
Personnel operating and maintaining the ACE will use? |
NSTM 588 Aircraft Elevator and Deck Edge and Hanger Division Doors S9086-T3-STM-010 |
|
Personnel operating and maintaining the ACE will use? |
NSTM 588 Aircraft Elevator and Deck Edge and Hanger Division Doors S9086-T3-STM-010 |
|
NSTM 588 covers? |
Aircraft Elevators and Deck Edge Elevators and Hanger Division Doors. |
|
Purpose of the NSTM 588? |
Provides description, identification, control and components information |
|
Part one of NSTM 588 provides? |
Resource for technical inquiries |
|
Part two of NSTM 588 provide? |
Function and Description. |
|
How many subcategory are there in part two of NSTM? |
7 |
|
NSTM Part two Section four? How many subsection? |
Elevator maintenance and inspection 6 |
|
JFMM volume one covers? |
New Construction |
|
JFMM Volume II Covers? |
Integrated Fleet Maintenance |
|
JFMM Volume III Covers? |
Deployed Maintenance |
|
JFMM VOLUME IV COVERS? |
Test and inspection |
|
JFMM VOLUME V PROVIDES? |
Quality Maintenance |
|
JFMM VOLUME VI COVERS? |
Maintenance Program |
|
JFMM Volume VIi covers? |
Contracted Ship Maintenance |
|
Tag-out Users Manual (TUM) provides? |
Personnel and ship safety and prevent damage to equipment |
|
Operational Risk Management ORM is promulgated as? |
OPNAVINST 3500.39 (series) |
|
What does a PQS accomplish? |
Ensures personal demonstrate required competencies prior to performing duties. |
|
Hazardous Materials Users Guide (HMUG) is what chapter and volume of the NSTM? |
Chapter 670 volume two |
|
HMUG provides? |
Safety and Health Information |
|
How many Groups of materials are covered on the HMUG? |
20 |
|
Machinery space warning sign are posted? |
At or near entrance of all ACE machinery rooms. |
|
Who should be alert to detect and report unsafe work practices and hazardous conditions? |
All Hands |
|
Initial Voltage Verification (IVV) are conducted when? |
Prior to beginning maintenance electrical equipment For low risk circuits rated Greater than 30V to less than 1000V are de-energized |
|
To find information on voltage greater than 1000V refer to? |
NSTM Chapter 300 appendix 1 |
|
LHD 5 and follow-on ships consists of? |
1. Platform and carriage 2. 6-Groove deflection sheave assembly 3. 8-Groove deflection sheave assembly 4. Lock at assembly 5. Wire rope assembly 6. Guide roller assembly 7. Thrust rollers assembly |
|
CVN 68 class ships ACE CONSISTS OF? |
1. Flight deck/gallery deck 2. Hanger deck 3. Platform 4. Machinery room control station |
|
CVN ACE will move a 130,000 lbs in how many seconds? |
70 seconds though a full cycle |
|
LHD has a rated load of? and can complete a cycle in? |
Rated at 75,000 Cycle in 90 seconds |
|
LHD ACE has four cable hitch points where are they located? |
Two forward and two aft |
|
How many deck edge ACE do LHA 6/ LHD 1 ships have? |
Two |
|
Which ship has folding ACE platforms? |
LHA 6/ LHD 1 class ships |
|
Folding ACE platforms can be stowed which way when necessary? |
Vertically |
|
Lock bars are positioned around ACE for? |
Support of the platform while in the stowed position |
|
ACE Guide rail control? |
The lateral motion of the platform. |
|
ACE guide roller restrict what movement? |
Horizontal movement |
|
LHA 6/ LHD 1 class ship ACE have how many guide roller assemblies? |
Four |
|
What guides the lift cables though various turns as they are received? |
Sheave blocks |
|
Lift cables are received from? |
Anchor structure |
|
Wire rope consist of? |
Core, strand and wire |
|
What assembly raise and lower ACE platform? |
Hydraulic Engine |
|
What size hydraulic lift cylinder do LHD 5 and CVN 68 class ship use respectively? |
LHD 5 uses 23” in diameter CVN 68 uses 16” in diameter |
|
What controls the direction and speed of the main control valve? |
Hydraulic Motor control feedback linkage system. |
|
How are hydraulic cylinders mounted? |
Horizontally |
|
Hydraulic engines create? |
The force necessary to lift ACE Platform |
|
What are the two basic types of hydraulic engines? |
Ram and Piston |
|
Some ACE use low pressure hydraulic of 1000 PSIG and others use? |
2800 PSIG |
|
What controls the flow to and from the hydraulic engine? |
Main control valve |
|
What controls the main pumps? |
Limit or Pressure Switches or HP Tanks |
|
ACE can be operated with a minimum of how many pumps? |
One |
|
Air is used to do what to hydraulic fluid? |
Pressurizes hydraulic fluid |
|
What activates the sump tank when a predetermined fluid level is reached? |
Floating switches |
|
What controls the flow of hydraulic fluid to dispatch platform? |
Up-down solenoid |
|
Up-down relays operate the solenoid to? |
Initiate direction |
|
the motor controller transformer converts the 440 VAC to? |
115 VAC |
|
ACE has how many control stations? |
3 - Hanger Deck Control Station (HDS) ( also the master control - Gallery Deck Control Station (GDS) - Machinery Room Control Station (MDs)
All three must be manned to initiate movement of ACE during normal operation |
|
What is the secondary control station for ACE Platforms? |
GDS |
|
Safety interlocks are provided for what? |
To prevent inadvertent operation of ACE |
|
Limit switches? |
Slow down the door movement and then a complete stop the door. |
|
Stanchion proximity switches |
Control the maximum pole travel |
|
Machinery room guards are painted what color? |
Red |
|
What is EOSS |
Engineering Operational Sequencing System |
|
Who verifies all valves are aligned, all fluid levels are at their proper marks, all equipment is operating? |
Machinery room |
|
Gallery Deck ensure? |
Verifies all spaces containing hoist wire ropes, sheave etc are clear of personnel or obstacles |
|
What is the purpose of EOSS? |
A set of systematic and detailed written procedures utilizing charts, instructions and diagrams for operation of ACE |
|
Ensure servo accumulator pressure is between? |
450 PSIG Minimum 825 PSIG Maximum |