First, one must check if the tasks listed are listed in the correct month? If the tasks listed do not match the designated month, step one of the monthly compliance metrics work instructions has not been performed or verified. Next, check to see if all tasks have been completed or submitted on time. If all task listed on step two are not listed with a previous month date, then the proof point for the task has been met and confirmed. Third, one must check if the data from the project dashboard has been saved in the document repository. If there is no data in the repository, steps one and two have not been completed and should be rechecked. Fourth, one must check that the data’s dates align with the proper schedule. Fifth, one must check and confirm that data is not enrolling and if data is enrolling month to month, one must check that the enrolling data numbers are updated monthly. The final step for confirming a task dashboard includes an Audit Readiness Plan. Every task dashboard must include an uploaded Audit Readiness Plan to be considered complete and before continuing to step three of the Compliance Metrics Work Instruction. Step three of the compliance metric work instruction covers creation of graphics and populated slide
First, one must check if the tasks listed are listed in the correct month? If the tasks listed do not match the designated month, step one of the monthly compliance metrics work instructions has not been performed or verified. Next, check to see if all tasks have been completed or submitted on time. If all task listed on step two are not listed with a previous month date, then the proof point for the task has been met and confirmed. Third, one must check if the data from the project dashboard has been saved in the document repository. If there is no data in the repository, steps one and two have not been completed and should be rechecked. Fourth, one must check that the data’s dates align with the proper schedule. Fifth, one must check and confirm that data is not enrolling and if data is enrolling month to month, one must check that the enrolling data numbers are updated monthly. The final step for confirming a task dashboard includes an Audit Readiness Plan. Every task dashboard must include an uploaded Audit Readiness Plan to be considered complete and before continuing to step three of the Compliance Metrics Work Instruction. Step three of the compliance metric work instruction covers creation of graphics and populated slide