• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/29

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

29 Cards in this Set

  • Front
  • Back

Which of the following indices provided by the Institute of supply management is considered the most important by economists because it is a composite of five weighted seasonally adjusted indices

Purchasing managers index

According to the textbook which of the following is not a way to closely match supply and demand?

Maintaining a rigid pricing system

The impact of poor communication and inaccurate forecasts resonates along the supply chain and results in the

Bullwhip affect

Inaccurate forecasts can result in negative outcomes like:

Stock outs and poor responsiveness to market dynamics

Which of the following is not a type of qualitative forecasting?

Naïve method

The following are all common qualitative forecasting models except:

Trend variation

Which of the following statements is false:

A. Time series forecasting is based on the assumption that the future is an extension of the past

B. Cause and effect forecasting assumes that one or more factors are related to demand and therefore can be used to predict future demand

C. All quantitative methods become less accurate as the forecasts time horizon increases

D. It is generally not recommended to use a combination of both quantitative and qualitative methods

D

Your company is conducting forecasting that revolves around the current recession and expansion of the US economy. This type of forecasting can be referred to as what component of a time series?

Cyclical variations

The following time series approach to forecasting uses historical data to generate a forecast and works well when demand is fairly stable overtime:

Simple moving average

Exponential smoothing forecast has the same value as the naïve forecast when a in the exponential of smoothing model is equal to:

1

One common cause and affect model used is:

Regression analysis

Some measures of forecasting accuracy include mean absolute deviation, mean absolute percentage error, and mean squared error. The formula for each is dependent on the forecast error, which is calculated by using the equation:

Actual demand for period T minus the forecasted demand for period T

If a tracking signal is positive which of the following is true?

Actual value is higher than forecast

Which of the following is an engineering document that shows an inclusive listing of all the component parts and assemblies making up the final product?

Bill of materials

The goal of resource planning is to minimize the discrepancy between what capacity and:

Demand

Which of the following consist of different products that share similar characteristics, components or manufacturing processes

Product family

Which of the following seeks to develop short range plans seeking to effectively and efficiently manage components and or subassemblies over time period of a few days to a few weeks?

MRP

To check the feasibility of the master production schedule, one would look to:

Rough-cut capacity plan

Which of the following is a long-range materials plan:

Aggregate production plan

In a bill of materials, items at which level are independent demand items?

Level zero

Which of the following basic production strategies used for addressing the aggregate planning problem would work best with make to order manufacturing firms

Chase production strategy

Which of the following is not one of the three basic methods used to calculate the available to promise quantities:

A. Discrete available to promise

B. Cumulative available to promise without looking ahead

C. Indiscreet available to promise

D. Cumulative available to promise with looking ahead

C

Which of the following could be considered a master production schedule for a service firm?

A. The reservation book utilized by a restaurant

B. The employee shift schedule utilized by an auto shop

C. A hospital patients personal information fill

D. The recipe book utilized by a chef at a restaurant

A

Which of the following MRP terms represents a committed order awaiting delivery for a specific period?

Scheduled receipt

Which of the following MRP terms represent the parts demanded by a parent?

Component

The acronym ERP is short for:

Enterprise resource planning

Which of the following is considered an advantage/benefit of utilizing an ERP system

It allows organizations to more easily communicate information about operational changes to supply chain members

Which of the following is considered an add vantage/benefit of utilizing an ERP system(2)

Enables the company to utilize a single centralized database system, thus illuminating duplicate data entry

While ERP is a relatively new technology, it has grown rapidly since the early 1990s. Which of the following is the reason that contributed to its rapid growth?

The year 2000 millennium bug