• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/13

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

13 Cards in this Set

  • Front
  • Back

1. The Texas Water Code is the state law for water pollution control in Texas.
a. true
b. false

a. true

2. The TCEQ is the primary state agency having authority for water pollution control in Texas.
a. true
b. false

a. true

3. Responsibilities of the TCEQ include construction approval, operator licensing, inspections
and fees, enforcement and penalties, issuing permits, and setting pay scales.
a. true
b. false

b. false


TCEQ DOES NOT SET PAY SCALES...


Under the Clean water Act, The TCEQ can


Approve Construction


Require Operator Licensing


Require Inspections


Issue Permits


Impose Fees, Enforcement and Penalties

4. Municipalities can review wastewater system projects in lieu of TCEQ by submitting
notification of intent to review.
a. true
b. false

a. true

5. The TCEQ can revoke an operator’s license if the plant design is at fault.
a. true
b. false

b. false


TCEQ does NOT revoke an operator's license if Plant Design is at fault. But it CAN when...


An Operator violates the permit


Falsifies Records


States misleading info on the license App.


6. Wastewater system records are private information and cannot be examined or copied by
the TCEQ.
a. true
b. false

b. false


The TCEQ CAN examine and copy plant records

7. If an accidental discharge or spill occurs the TCEQ must be notified with 24 days.
a. true
b. false

b. false


Not 24 days...


They must be notified within 24 hrs.

8. If a water quality violation occurs, the TCEQ may assess an administrative penalty up to
$1000 per day per violation.
a. true
b. false

b. false


The TCEQ administrative penalty can be up to $25,000 per day.

9. No one can construct a treatment plant without a permit except with the TCEQ approval.
a. true
b. false

a. true

10. The TCEQ sets permit conditions including permit duration, quality of discharge, discharge
point, reporting requirements, and ________.
a. pump supplier
b. sludge volume
c. design engineer
d. maximum discharge

d. maximum discharge

11. TCEQ shares authority with agencies including the________ department.
a. Public Safety
b. Human Services
c. Parks and Wildlife
d. Criminal Justice

c. Parks and Wildlife


The TCEQ Shares Authority with


Texas Parks and Wildlife Dept


Texas Department of State Health Services


Railroad Commission of Texas


and Local Governments

12. Local governments must inspect water quality to determine that ________.
a. standards are met
b. dischargers permitted
c. permits are followed
d. all listed

d. all listed

13. Under certain conditions, a city with a population of ________ or more may be required to establish a water pollution control and abatement program.
a. 100
b. 1,000
c. 10,000
d. 100,000

c. 10,000