• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/68

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

68 Cards in this Set

  • Front
  • Back

1. When planning collection system construction, inform utility companies and locate their
lines.
a. true
b. false

a. true

2. In a plan and profile drawings, existing utility lines and sizes, trench depth and new
wastewater line diameter are shown on the plan view.
a. true
b. false

b. false


This is a trick question. it starts by referencing both plan and profile drawings... but ultimately is asking ONLY about the Plan View, Trench depth is only show on the profile drawings.

3. Shoring includes hydraulic or screw jacks with metal bracing, timber and wood sheeting and
trench boxes.
a. true
b. false

a. true

4. Contractors working for a municipality are required by OSHA to shore.
a. true
b. false

a. true

5. Sloping or benching an excavation is an alternative to shoring.
a. true
b. false

a. true

6. Maximum allowable slope is expressed as the ratio of vertical rise to horizontal distance
(V:H)v.
a. true
b. false

b. false


Not (V:H)


It's (H:V) Horizontal dist. to Verical rise is Maximum allowable slope

7. Type B soil may include angular gravel, silt, silt loam, and previously disturbed soils except
those which would otherwise be classed as Type C soil.
a. true
b. false

a. true

8. The allowable slope for type B soil is 1:1.
a. true
b. false

a. true

9. Some considerations when selecting pipe includes exclusion of infiltration, external
pressure, industrial waste characteristics, corrosion and pipe joint length.
a. true
b. false

b. false


Pipe Joint length is not related

10. Types of pipe include vitrified clay, concrete, asbestos cement, plastic and ductile iron.
a. true
b. false

a. true

11. Vitrified clay pipe does not corrode, but root intrusion, cracking and infiltration are clay
pipe problems.
a. true
b. false

a. true

12. To protect concrete pipe from hydrogen sulfide, PVC liners, epoxy, coal tar coatings, or
excess concrete can be installed inside the pipe barrel.
a. true
b. false

a. true

13. While cutting or tapping asbestos-cement pipe, keep the pipe wall wet to avoid breathing
asbestos dust.
a. true
b. false

a. true

14. Plastic pipe has rigid walls and does not depend on bedding for support and strength.
a. true
b. false

b. false


Plastic Pipe DOES depend on Bedding for support

15. PVC pipe wall thickness is classified as Standard Dimension Ratio (SDR).
a. true
b. false

a. true

16. Prolonged exposure to hydrogen sulfide breaks down plastic pipe resins.
a. true
b. false

b. false


Plastic pipe will no corrode.

17. Ductile iron pipe is strong, but heavy and expensive.
a. true
b. false

a. true

18. When stringing pipe along the trench path, point the spigots away from the direction of
installation.
a. true
b. false

b. false


When Stringing Pipe, the Spigots should point IN the (same) direction of installation (water flow).


Bells are up stream


Spigots are down stream

19. If unloading pipe by hand, remove one piece at a time and do not stack pipe higher than 18
feet.
a. true
b. false

b. false


Its 8ft NOT 18ft


When unloading by hand, remove one at a time and do not stack higher than 8ft

20. Wastewater line grade must provide a velocity of at least 2 feet per second.
a. true
b. false

a. true

21. Two systems are generally used to set grade: string and rod, or razor beam.
a. true
b. false

b. false


It's NOT RAZOR... it's LASER


READ THE QUESTIONS WELL...


22. There are two general pipe loads: trench load and surface load.
a. true
b. false

a. true

23. The trench load decreases as the trench width, measured at the top of the pipe, increases.
a. true
b. false

b. false


Trench load INCREASES as the Trench width increases.

24. Trench width should be kept as narrow as possible, but the TCEQ requires trench width to
accommodate work, bedding and compaction equipment.
a. true
b. false

a. true

25. Lay pipe with the spigot pointing upstream and the bell pointing in the direction of flow.
a. true
b. false

b. false


The Bell should point upstream


The Spigot should point in the direction of flow (downstream)

26. Dig holes for the pipe bells so the barrel supports the pipe and do not lay pipe in water.
a. true
b. false

a. true

27. After work, leave the pipe end open and backfill first thing in the morning.
a. true
b. false

b. false


After work SEAL the Pipe End and Backfill the Pipe as soon as possible or by the end of the day.

28. ________ is required when the trench bottom is unstable.
a. Bedding
b. Foundation
c. Backfill
d. Shoring

b. Foundation

29. TCEQ requires pipe bells to be off the trench floor at least ________ inches and have at
least 6 inch clearance from the trench walls.
a. 2
b. 4
c. 6
d. 8

c. 6

30. Class A bedding for rigid pipe is achieved with the concrete ________ or ________.
a. bed/bend
b. sink/rise
c. cradle/arch
d. dip/dom

c. cradle/arch

31. Class B and C bedding for rigid pipe uses crushed stone, shell, gravel or ________.
a. clay
b. peat
c. coal
d. sand

d. sand

32. No rocks larger than ________ inches should be in the final backfill within ________ feet of
the pipe crown.
a. 6/3
b. 3/6
c. 3/3
d. 6/6

a. 6/3

33. The amount of deflection of plastic pipe depends on ________.
a. bedding compaction
b. trench conditions
c. pipe stiffness
d. all listed

d. all listed

34. Bedding material for plastic pipe includes ________.
a. gravel
b. sand
c. clay mixtures
d. all listed

d. all listed

35. Excessive trench load on plastic pipe requires pipe ________.
a. casing
b. bedding
c. roundness
d. stiffness

a. casing

36. Wastewater lines and manholes can be no closer to a water line than ________ feet.
a. 5
b. 6
c. 9
d. 10

c. 9

37. Parallel wastewater and water lines must be in ________ trenches.
a. deep
b. bedded
c. separate
d. shored

c. separate

38. Where wastewater lines or manholes cannot be separated from a water line by 9 feet, TCEQ
lists ________ alternative procedures.
a. two
b. three
c. four
d. five

c. four


1) New installed Parallel (separate Trench)


2) New is to cross 2 ft below and at a 75 -90 degree angle


3) If Not 2ft below or less than 75 degree angle or pipe length is less than 18ft... then a Minimum distance of 6" below...



But if Pipe and joins are not pressure rated to 150 psi... that MUST be placed withing 9 ft of the waterline in all directions AND embedded in cement stabilized Sand (10% cement mix per yard of sand)



4) If a manholes is to be less than 9ft, the water line MUST be encased in new encasement at least 18ft long, with a psi of 150 and a diameter at least TWO sizes larger than the waterline.

39. New ________ manholes are prohibited, and ________ cannot be used to adjust manhole
covers to grade.
a. brick/brick
b. concrete/brick
c. HDPE/fiberglass
d. brick/concrete

a. brick/brick

40. Operators should wear a safety harness with lifeline when entering a manhole and at least
________ persons should remain at the surface as standby help.
a. one
b. two
c. three
d. four

b. two

41. Ventilate by forcing ________ air into the manhole with a blower.
a. cool
b. warm
c. fresh
d. moist

c. fresh

42. Test the manhole for ________ with approved instruments.
a. gases
b. odor
c. temperature
d. roaches

a. gases

43. Install manholes at a change in pipe alignment, change in grade, change in pipe ________,
wastewater intersections and end of lines to be extended.
a. material
b. diameter
c. manufacturer
d. color

b. diameter

44. Manhole covers for new manholes must be ________ inches or larger.
a. 18
b. 20
c. 24
d. 30

c.24 (??old ??)


But in the Book it says 30"


So I say the answer is d. 30

45. ________ are prohibited in new manholes.
a. Vents
b. Steps
c. Laterals
d. Gases

b. Steps

46. Use a J-drop pipe if a wastewater line enters more than ________ inches above a manhole
invert.
a. 15
b. 20
c. 25
d. 30

d. 30

47. The soffit of a pipe is the pipe ________.
a. invert
b. bedding
c. foundation
d. crown

d. crown

48. A manhole fillet is a ________ invert.
a. curved
b. smooth
c. sloped
d. channeled

c. sloped

49. The total infiltration or exfiltration of a new system cannot exceed ________ gallons per
diameter inch of pipe/mile/________ hours at a minimum test head of ________ feet.
a. 50/12/2
b. 50/24/2
c. 24/50/2
d. 24/24/4

b. 50/24/2

50. Prior to an infiltration test, allow the ground water level to stabilize for ________ hours.
a. 12
b. 18
c. 24
d. 36

c. 24

51. Prior to an exfiltration test by water, fill the ________ manhole ________ feet above the top
of the pipe at its upper end, and then take measurements every ________ minutes.
a. lower/two/four
b. lower/four/five
c. upper/five/four
d. upper/two/five

d. upper/two/five

52. An exfiltration test by air requires that pipe less than ________ inch diameter be pressurized
to ________ psi greater than the pressure exerted by ground water above the pipe.
a. 36/3.5
b. 35/3.6
c. 24/3.5
d. 24/5.3

a. 36/3.5

53. ________ psi loss within the time limit fails an exfiltration test by air.
a. four
b. three
c. two
d. one

d. one

54. Deflection tests must be performed on ________ pipe.
a. all
b. concrete
c. plastic
d. clay

c. plastic

55. Pipe less than 27 inches in diameter must be tested with a ________ mandrel.
a. flexible
b. plastic
c. metal
d. rigid

d. rigid


A mandrel's outside diameter must be equal to 95% of the indside diameter of the test pipe.


Its made of Metal or Plastic


It can withstand 200psi crush strength

56. Deflection testing is conducted only after the final backfill is in place ________ days.
a. three
b. 30
c. 20
d. 15

b. 30

57. The mandrel cannot be pulled by a mechanical device and cannot exceed a ________
percent deflection.
a. three
b. four
c. five
d. six

c. five

58. The mandrel must have an outside diameter equal to ________ percent of the inside
diameter of the test pipe.
a. 95
b. 75
c. 25
d. 15

a. 95

59. The mandrel barrel must have a length at least ________ percent of the test pipe diameter.
a. 95
b. 75
c. 25
d. 15

b. 75

60. Pressure systems are useful in circumstances such as________.
a. high water table and hilly terrain
b. low population density
c. infiltration reduction
d. all listed

d. all listed

61. Pressure systems use submersible ________ pumps.
a. centrifugal
b. piston
c. diaphragm
d. screw

a. centrifugal

62. Multiple pump units are required for flow greater than ________ gallons per day.
a. 15
b. 150
c. 1,500
d. 15,000

c. 1,500

63. A visual and audio alarm is required for pressure system ________.
a. force mains
b. wet wells
c. check valves
d. control panels

b. wet wells

64. Like a pressure system, a ________ system collects wastewater in a sump often located on
private property.
a. vacuum
b. gravity
c. septic
d. private

a. vacuum

65. When the sump is full a switch ________ a valve to a ________under vacuum and the
wastewater is suctioned to a _______ point.
a. closes/pump/discharge
b. closes/pump/collection
c. opens/pipe/discharge
d. opens/pipe/collection

d. opens/pipe/collection

66. Vacuum pumps at collection points must empty the vacuum piping in ________ minute(s).
a. one
b. two
c. three
d. four

c. three

67. Duplicate vacuum pumps, each capable of ________% of specified airflow, are required.
a. 70
b. 80
c. 90
d. 100

d. 100

68. Alarms for ________ liquid level in the collection sump and ________ system vacuum are
required.
a. low/high
b. high/low
c. low/low
d. high/high

b. high/low