5 Cards in this Set

  • Front
  • Back

What is One Stop Center, OCS?

- Received Application


- Distribute Application


- Monitor Issuance


- Receive & Coordinate


- Process the application


- Coordinate the OSC Commeittee Meeting


- Preparation & issuance of decision letter for OSC Technical Committee (JKTPS), (JKTPS 1), (JKTPS2)


- Receive & coordinate application for permit to transport the constryntion material (Eng. Depmt.)


- R&Ca for the Telecom. Structure (JPEPP)


- Joint Secretariat with MPC for KL Gocus Group dealing with Construction Permit chaired by KL Mayor


- Coordinate pre-consultation between PSP/SP, External Technical Department


- Become a member of the Focus Group to improve MYS ranking under Dealing w/ Construction Permit indicator

How many type of submission can be done through OSC 3.0+ (DBKL)?

There are 36 type of application can be made through OSC DBKL



Kebenaran Perancangan (KM)


Pelan Bangunan (PB)


Pelan Kejuruteraan (PJ)


Pecah Sempadan & Ubat Syarat (PU)


Penyederaan Balik & Pembarimilika Semula (PP)

What is this all about? What have changed? (OCS3+)

One size fits ALL 69 PERKARA:


- KM Kecil (20 perkara)


- KM Sederhana (27)


- KM Besar (29)



Tempoh Kelulusan KM:


- KM Kecil (30-42 hari)


- KM Sederhana (57-99)


- KM Besar A (300) [MPFN]


- KM Besar B (115)

Process of KM submission

Data Gathering > Consideration of the Development aproposal Plans > Notification to Start Work > Interim Inspection > Final Inspection 1&2 > Deposit to CCC (Form F&G)



*applicant (deposit form ccc& G1-G21) within 14 days from the date of CCC issued > OCS > distribute 2 copies for (Building Department & BAM/BEM)

Form G (G1-G21)

G1: Earthwork


G2: Setting Out


G3: Foundatiins


G4: Structural


G5: Internal Wall Plumbing


G6: Internal Sanitary Plumbing


G7: Internal Electrical


G8: Fire-fighting (Passive)


G9: Fire-fighting (Active)


G10: Mechanical Ventilation


G11: Lift/Escalator Installation


G12: Building


G13: External wall supy sys.


G14: Sewerage Reticulation


G15: Sewerage Treatment Plant


G16: External Electrical Supply sys.


G17: Road & Drain


G18: Street Lighting


G19: Street Lighting external Main Drain


G20: Telecommunication


G21: Landscape