• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/20

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

20 Cards in this Set

  • Front
  • Back

Develop Project Management Plan has 4 inputs

  1. Project Charter
  2. Outputs from other processes
  3. Enterprise environmental factors
  4. Organizational process assets

PMIS

Part of Enterprise environmental factors. Automated or manual system used to document the project management plan and subsidiary plans. Incorporates the configuration management system and change contort system.

The project management plan describes:

the processes you'll use to perform the project and describes how the project will be executed, monitored, controlled and how the work of the project will be executed to meet the objectives.

Project Charter contains:


  • project objectives
  • project description
  • high level requirements
  • summary milestones schedule
  • summary budget

The scope management plan describes:

Input into the Project Management Plan


how project scope will be defined and verified, how the scope statement will be developed, how the WBS will be created and defined and how project scope will be managed and controlled. Project scope is measured against the project management plan, but project scope is measured against the product requirements.

Plan Scope Management has 2 tools:

Expert Judgment


Meetings

The Requirements Management Plan

Input into the Project Management Plan


Describes how the requirements will be analyzed, documented, traced, reported, and managed through out the project.

Requirements describe

the characteristics of the deliverable. Also can describe the functionality and a deliverable must have or specific conditions a deliverable must meet to satisfy the objectives of the project.

Tools and Techniques to help identify requirements

Interviews


Focus Groups


Facilitated Workshops


Group Creativity Techniques



Defining project scope is critical to the success of the project because it spells out exactly what the product or service of the project looks like

Why is defining project scope so critical

First do requirements gathering

Then scope definition

Product analysis

a method for converting the product description and project objectives into deliverable and requirements. Most helpful when the project's end result is a product.

Tools to help do product analysis


  • perform value analysis
  • product breakdown
  • systems engineering techniques
  • system analysis
  • value engineering techniques

Alternatives generation

A technique used for discovering different methods or ways of accomplishing the work of the project.




Ex. brainstorming to figure out a different way of going about doing the work of the project

Project scope statement

documents the project objectives, deliverables, and the work required to produce the deliverables so that it can be used to direct the project team's work and is a basis for future project decisions.

Difference between Project Charter and Scope Statement

Project charter is a high level description for the project


Project scope statement is a detailed description of the project and product scope and describes how the final product or result of the project twill be accepted.

Assumptions

Things you believe to be true, have to be documented.

Decomposition

Subdividing deliverable into smaller components - the purpose of the WBS process.

100% Rule

Collectively, all the levels of the WBS roll up to the top so that all the work of the project is captured (and no additional work is added).

Scope baseline

approved version of the detailed project scope statement, the WBS and the WBS dictionary.