• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back

What is the last step of resource exploration?

To drill

What are the 2 main purposes of an exploration well

-Confirm the presence of hydrocarbons in that area


-measure the properties of the reservoir and the hydrocarbons within

What steps are taken in Site Preparation before drilling?

-Clean surface of land and level the land


-Building access roads to the site


-Dig a “reserve pit”

What is a Reserve Pit

“Garbage can” for the drill site. Shallow hole for the unneeded materials such as Mud, Stone, Fluids

After doing the site preparation what is the next step?

Set up the drilling rig

What 3 things are needed for the Drilling Rig

-Surface hole


-Surface casing Installation


-Blow-Out Preventer (BOP)

Surface Hole

60-400m deep hole, depending on conditions of the area. Drilling rig is set up on top

Surface Casing Installation


And what it does

Steel pipe inserted and fixed in place with cement.


-controls the return flow of mud and drilling fluids


-is lores the wellbore from surroundings


-prevents ground water contamination

Blow out Preventer (BOP)

Special type of valve that seals the well and controls crude oil and natural gas flow

How does size of a drill relate to its depth ability ?

Larger the rig the deeper it can drill