What is the last step of resource exploration? |
To drill |
|
What are the 2 main purposes of an exploration well |
-Confirm the presence of hydrocarbons in that area -measure the properties of the reservoir and the hydrocarbons within |
|
What steps are taken in Site Preparation before drilling? |
-Clean surface of land and level the land -Building access roads to the site -Dig a “reserve pit” |
|
What is a Reserve Pit |
“Garbage can” for the drill site. Shallow hole for the unneeded materials such as Mud, Stone, Fluids |
|
After doing the site preparation what is the next step? |
Set up the drilling rig |
|
What 3 things are needed for the Drilling Rig |
-Surface hole -Surface casing Installation -Blow-Out Preventer (BOP) |
|
Surface Hole |
60-400m deep hole, depending on conditions of the area. Drilling rig is set up on top |
|
Surface Casing Installation And what it does |
Steel pipe inserted and fixed in place with cement. -controls the return flow of mud and drilling fluids -is lores the wellbore from surroundings -prevents ground water contamination |
|
Blow out Preventer (BOP) |
Special type of valve that seals the well and controls crude oil and natural gas flow |
|
How does size of a drill relate to its depth ability ? |
Larger the rig the deeper it can drill |