Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
281 Cards in this Set
- Front
- Back
What is term used when crew gets an order and walking to assignment area? |
In transit |
|
Term used a forward staging position located outside the immediate hazard zone. |
On deck |
|
Once arrived at on deck who do you notify? |
IC or sector officer |
|
When transferring from on deck to relief crew company officers should do a face to face transfer, the information transferred should include? |
Sector conditions Routing instructions to the work area Sector objectives Additional tools required Sector objectives |
|
What is the term when efficient means of air replacement and replenishment while maintaining their sector assignment? |
Recycling |
|
The list of tactical objectives in order of priority? |
Remove endangered occupants and treat Stabilize the incident and provide for life safety Conserve property Provide safety, accountability, and welfare of personnel. (ongoing through the whole incident) |
|
8 basic functions of command |
1. Assume command, position of command. 2. Situation evaluation “size up” 3. Initiate, maintain, and control the communication process. 4. Deployment management 5. Identify strategy / develop an incident action plan 6. Incident organization 7. Review, evaluation, and revision 8. Continuing, transferring, and terminating command |
|
Two “modes” or initial arriving on scene? |
Nothing showing (investigation mode) Fast action mode (needs action now) |
|
Command mode - stationary command position. What does captain do with his crew? 2 options |
- member “move up” will serve as company officer - May assignment his crew to work under the supervision of another company officer. |
|
The benefits of a upgraded command post? 5 of them |
- provides IC with a support officer - establishes an incident safety officer ISO - wider view of the fire ground - improves communication - lighted warm dry environment to operate in. |
|
What does the first on scene Shift commander do? |
Role of senior advisor and assist IC |
|
What does 2nd shift commander do upon arrival? |
Sets up command van |
|
When an incident is so large or of such a duration that State and Federal resources are called to assist, an ____ _____ ____ may be assigned to manage long term evacuations and other assistance. |
Incident Management Team IMT |
|
Transfer of command has to indicate at least the following. |
Incident conditions (fire location and extent, hazmat spill or release, number of patients) Incident management plan Completion of the tactical objectives Safety considerations |
|
Incident command system never sleeps. When no working incident who is IC? |
Alarm Room Battlion Chief and Supervisor |
|
The command team consists of who? 3 people |
Incident commander, safety officer and senior advisor |
|
Command Procedures What are the 3 different command levels? |
-Strategic level- overall direction of the incident. - tactical level- objectives assignments to sectors - task levels - task objectives to companies. |
|
Command normally has strategic and tactical levels and company officers have task level. |
— |
|
Fire ground objectives? 4 of them |
- rescue - fire control - property conservation - customer stabilization |
|
When there are ___ or more companies operating in a sector, the IC should assign a Battlion Chief and BSO to that sector. |
3 companies |
|
The span of control is usually ___ sectors and should never exceed ____ sectors |
5-7 |
|
_____ may be assigned by their geographic location (north sector) or function (ventilation sector) |
Sectors |
|
_____ may be assigned by their geographic location (north sector) or function (ventilation sector) |
Sectors |
|
______ are assigned by there geographic location. |
Divisions (north division) |
|
_____ may be assigned by their geographic location (north sector) or function (ventilation sector) |
Sectors |
|
______ are assigned by There geographic location. |
Divisions (north division) |
|
_____ are assigned by their function. (Ventilation group) |
Group |
|
If the number of sectors exceeds the span of control that the incident commander can effectively manage, the IC should divide to _____? |
Branches , Each branch is responsible for several sectors and assigned assigned its own radio channel. |
|
When establishing a sector, the IC will assign each sector officer 3 things? |
Tactical objectives A radio designation (roof sector) The identity of resources assigned to the sector |
|
In a offensive fire attack what is the reasonable number of companies for span of control for a sector? |
5 companies |
|
In a defensive fire attack what is the reasonable number of companies for span of control for a sector? |
7 companies |
|
When would Branch officers be utilized? |
When the span of control is getting to maximized Example Very large scale incident that involve two or more major components. |
|
During the initial phases of a large incident the initial IC and staff normally carry out these 4 sections? |
Logistic section Planning section Operation section Administrative section |
|
Logistics section is the support mechanism for the organization. |
- |
|
Planning section is responsible for gathering, assimilating, analyzing, and processing information needed for the effective decision making. |
- |
|
Operation section is responsible for the tactical priorities, accountability, safety and welfare of the personnel working in the operations section. |
- |
|
In a large event who communicates with branch’s or sectors from IC? |
Operation sector |
|
The administrative section evaluates and manages the risk and financial requirements for the fire department |
- |
|
During a large scale event who communicates with city officials? |
Administrative section |
|
Power lines down or pole fire or transformer fire effect what outage? Local or feeder |
Local outages |
|
Issues or fire at electrical substation or major distribution lines effect local or feeder outages? |
Feeder outages |
|
Local outage for SRP effect approximately how many residents? |
10 |
|
Local outage for APS effect approximately how many residents? |
35 or up to 800 homes |
|
Feeder power line outage for SRP could effect approximately how many customers? |
200 residents or commercial |
|
Feeder power line outage for APS could effect approximately how many customers? |
2,000 of their customers |
|
The emergency power outage plan can be implemented when temps get over ____ and below _____. |
105 and 34 |
|
Who can implement the emergency power outage plan? |
Duty chief or any senior staff or command staff |
|
Who opens the EOC? |
On duty Emergency Manger |
|
Minimum crew size? |
2-3 |
|
How big are the passport cards? |
2x4 inched |
|
Where are passports kept on truck? |
Company officers position or drivers door |
|
Statues par boards are how big? And where are they kept? |
8x11 inches Engineers door |
|
Who is one to make sure all par boards and helmets ID are correct? |
Company officer |
|
If accountability sector is set up, which sector does it fall under? |
Safety sector |
|
How far away from initial engine do you park and bring the PAR board to the engineer? |
50 feet or more |
|
Ladder companies on first alarm may leave there PASSPORT where if they are parked at a position not close to initial engine? |
There dash |
|
On a high rise fire, where do PASSPORTS go? |
Lobby sector |
|
On high rise fire who has PASSPORTS? |
Resource sector officer |
|
At what point is PASSPORT accountability done? |
“Fire under control” |
|
The term “mayday” is only used in 2 instances? |
Report lost firefighter Or trapped firefighter |
|
When should RIC shall be implemented? |
All interior working structure fire beyond the incipient stage or any other hazardous condition we may encounter. |
|
What does IRIC stand for? |
Initial rapid intervention crew |
|
When RIC units are needed to respond to a sudden emergency, in which a sector officer is incapacitated (physically or emotionally) who takes over that sector? |
RIC company officer will assume sector responsibilities for that area. |
|
In high rise fires where does RIC stand by position? |
Resource sector and secondary location in lobby. |
|
In multiple alarms incident or TRT, HAZ MAT incidents what should be set up by command? |
Safety sector |
|
Incident command system will be implemented at all working incidents involving who many units or more? |
3 or more units |
|
During normal business hours Safety sector at any incident should be whom? If possible |
Safety 202 because of their on-duty status and safety officer training. |
|
Safety sector interventions at scene operations involves 3 approaches? |
Life threatening situations, Non life threatening situations, On-going incident planning process. |
|
Support sector works under which section officer? |
Logistics section officer |
|
Support Sector does what In your words on major events? |
Fuel, medical medical supplies, |
|
Only area a crew should enter or exit from a controlled area? |
Lobby Sector |
|
Who collects PAR tags for a high rise fire? |
Lobby sector |
|
First arriving crew in a high rise fire should leave 1 person and they should be initial what? |
Lobby sector |
|
3 levels of evacuation? |
Site evacuation- small number of people Intermediate level evacuation - fewer than a 100 people (2-4 hours) Large-scale evacuation- 1,000s people |
|
Typically how long is a site evacuation ? |
Less than 1 hour |
|
In a large scale evacuation who manages shelters? |
City of Mesa parks and recreation |
|
If someone refuses to evacuate in a evacuation who needs to be notified? |
Evaluation Branch |
|
When door to door evacuation needs to be rapid and cannot be done, how many times do you do siren on “yelp”? |
3 (5) second blasts of the siren on “yelp” |
|
On scenes with the PIO what color light should be used for media to get information from PIO? |
Green light |
|
What sector is established when a member or multiple members are seriously injured or killed in the line of duty? |
Welfare sector |
|
After a LODD how long should flag remain at half staff? |
Until the day following the funeral. |
|
After a LODD how many days are badge shrouded will be worn? |
30 days |
|
When 25 or less are injured what is it called? |
Multi-patient incident |
|
What is it called when you have 26-100 patients that are injured? |
Mass casualty incident |
|
What is it called when you had over 100 people injured? |
Disaster |
|
General tactical objectives for a 2n1 or greater. |
1. Remove endangered people 2. Stabilize incident 3. Set up triage, extrication, treatment and transportation. 4. Provide safety and accountability for all members and victims 5. conserve property |
|
EMS tactical objectives 2 of them? |
Completion of “triage report” Declaration of “all immediate transported” |
|
Triage bags should be used when? (2) |
3 or more immediate patients or more than 10 patients. |
|
Transportation sector remove patient tracking slips on from the triage back prior to transport on large EMS incidents. |
. |
|
Transportation should tell command when all _____ are off the scene. |
Immediate |
|
Medical supply sector is established after what alarm? |
3rd alarm medical or greater |
|
How long should triage last or take? |
4-6 minutes |
|
Incidents of less then 10 patients who should do triage? |
1st arriving company officer |
|
Incidents with more than 10 patients who should do triage? |
1st unit established command and second unit does triage |
|
Transportation sector should notify command when ? |
All immediate pt have left the scene |
|
What is leap frogging? |
When minor patients go passed closer hospitals so more injuries can go to close ones. |
|
Where large scale medical events where are all the tracking sheets kept for patients? |
Transportation sector |
|
Phoenix fire has 4 and mesa has 1 buoy wall tank and they hold how many gallons of water? |
3,000 - 4,000 gallons water |
|
How many gallons of water does a Bambi bucket hold? |
67-96 gallons |
|
How far does apparatus need to be during buoy tank pick up? |
150’ away |
|
How big is a landing zone? |
100x100 for each helicopter |
|
How far should all people and vehicles be kept back at a Lz? |
200” feet |
|
How big is the touch down on a LZ? |
60x60 |
|
Who ever is communication with pilot should be in which corner? |
Front right as seen by the pilot. |
|
The LZ should be how many yards away from any part of the scene? |
100 yards |
|
If you need to wet down a LZ how big should be wet down? |
200x200 |
|
When helicopter is on the ground how far away from tail guard should you be? |
50-100 feet |
|
How long should Lz be left open after helicopter leaves LZ? |
2-3 minutes |
|
The order of surfaces for LZ? |
Concrete Asphalt Grass Compacted dirt Dry loose dirt or sand |
|
3 things command needs to make a strategic decision making? |
Visual factors Reconnaissance factors Preplanning and familiarity factors |
|
The 3 tactical priorities and benchmarks? |
#1Rescue (primary search)(all clear) #2Fire control (under control) #3Loss control (property conservation - loss stopped) |
|
With in benchmarks are on-going responsibilities that is not completed with benchmarks. What is that term called? |
Umbrella of service |
|
What are 3 on going considerations with umbrella of service? |
1 fighter safety 2 customer service 3 loss control |
|
What is the strategic mode based on? |
-rescue profile (savable lives) -building ( type of construction) -structure integrity -fire load -fire and smoke conditions |
|
What is it called when offensive in one area and defense in another? |
Strategic separation |
|
After “fire under control” command should do what? 2 things. |
Notify alarm Get a PAR on for ground |
|
Secondary search means searching after what 2 thing? |
Primary search And initial fire control |
|
Order of rescue on a fire? |
-most severely threatened - the largest number (group) - remainder of fire area - exposures |
|
2 times reserves to call a MAYDAY? |
Missing or trapped firefighter |
|
Evaluation of all members of the operation division that use a SCBA shall be conducted? How often |
Annually |
|
When laddering a roof extending a ladder minimum of how many feet above the roof line? |
4-6 feet |
|
What is considered a hot zone? |
Requires SCBA Charged hoseline Turnouts Any place FF are risk of becoming lost, trapped or injured. |
|
What is minimum number of personal working in hot zone? |
2 personnel with accountability in place |
|
What is the warm zone? |
Just outside the hot zone where FF start their operation. Not at risk for becoming lost or trapped or injuried. |
|
Cold zone is what? And who is in it? |
Outside warm zone. Command Staging I and II Support Media |
|
Leading cause of death and injury to firefighters per SOP? |
Structural collapse |
|
A 100’ length of unprotected steel will expand _____ “ when heated to _____ f. |
9” 1100 degrees F |
|
After how many minutes of aggressive interior fire fight should command initiate a careful evaluation of structural conditions and resort to defensive position. |
10-15 minutes |
|
In high rise fire use elevator except when you check and see what? |
Smoke and fire up elevator shaft |
|
Before using elevator the nearest what should be identified? Incase you come up and find heavy heat or fire. |
Nearest stairwell |
|
How many floor below involved floor do you take elevator to? |
2 below suspected fire floor. |
|
Can elevators without emergency operation be used in fire event? |
No. No safety measure to close door immediately |
|
On high rise fire what is the approximate distance to stay away from building for falling glass and debris? |
200’ feet |
|
True or false No firefighter shall operate on a bow string roof if there is any evidence that the fire has penetrated the attic or involves the truss area? |
True |
|
Initial roof sector officer must report to command the following conditions? 6 of them |
Roof design (flat, peaked, etc) Structural conditions Fire conditions on roof Locations of fire walls Location of heavy objects on roof Ventilation plan |
|
What is percentage of a adequate size ventilation hole must be cut and opened if ventilation is to be successful? |
10% of roof surface of the involved area. |
|
On high rise fire, where is normally resource sector established? |
2 floors below the fire floor or other safe environment below the fire. |
|
What is in resource sector on a high rise fire? |
Tools or equipment needed on fire fight. Spare bottles, hose, nozzles, etc. |
|
On a high rise fire where should crews go after staging? |
Resource sector |
|
A minimum of how many companies should be in resource sector for companies working on the fire floor? |
1 for 1 |
|
What are the dates for heat stress management on crew members? |
May 15- September 15 or when temperature or heat index are over 105 |
|
During heat stress management months, how long should captain manage out door workout activities? |
30 minutes |
|
How many ounces of water is recommended during middle summer months? |
64 ounces during 24 hours |
|
How long should companies remain in rehab during heat stress months? |
Minimum 20 minutes |
|
How many feet is minimum for setting up a Hot Zone from any hazardous emergency scene? |
50 ft |
|
Two kinds of decontamination process? |
Preliminary decontamination And gross decontamination |
|
Preliminary Decon is done how and how many feet from hazard area? |
With soft brush or hoseline And minimum of 50 feet away |
|
How far should guys take off there gear away from rehab? |
50 feet and down wind |
|
After a fire what areas should you whip down on your body? |
Head, neck, arms and hands |
|
What color tape should be used for rehab sector? |
Blue |
|
There are 4 sections of rehab sector? And what are they? |
Section A. Entry point & member triage Section B. Hydration and replenishment Section C. Medical treatment and transport Section D. Reassignment |
|
What is heart rate when entry rehab when they would need to head to medical treatment side of rehab. |
120 heart rate or higher, or a medical complaint. |
|
True or false When a member of the crew needs to head to rehab and move to medical treatment area does the rest of his crew go with them? |
True |
|
What 3 vital signs do we check while in rehab? |
Pulse Blood pressure Body temperature |
|
What are the 3 vital signs we check prior to leaving rehab and what are there requirements? After 20 minutes cool down |
Heart rate under 100 Body temp under 101 Diastolic BP less than 100 |
|
Ventilate a building for 3 reasons? |
To gain access To remove heated gases and smoke Make interior spaces more tenable and reduce property loss |
|
What is it called when a fire burns through the roof? |
Defensive ventilation |
|
How big is a standard attack team? |
2 engines 1 ladder |
|
A high rise building is defined by how many feet or floor? |
6 floors of 75 feet or greater |
|
High rise fire. 2 kind of stair wells. What are they? |
Evacuation stairwell Fire attack stairwell |
|
On high rise fire, 1 and 2 alarm report where? |
Lobby |
|
During high rise and using stairs, captain must check crews air supply how often? |
Every 5 floors |
|
The IC shall schedule “post fire inspections” at what hourly intervals post incident termination? |
2,4,8 hours
And have RP permission |
|
How long should a RAT “remote activation terminal” be used after a fire? |
Minimum of 12 hours |
|
How many feet should fans be placed from a door? |
7 ft |
|
A non pumped 500 feet 4” supply line can flow how many gallons? |
800 gpm |
|
On initial attack first fire stream is placed at a transitional attack and second line goes where? |
Between fire and people in damager. |
|
On initial attack first fire stream is placed at a transitional attack and second line goes where in reports of resident report all clear? |
Between the fire and most severe exposure or unburied area. |
|
On initial attack first fire stream is placed at a transitional attack and third line goes where in reports of resident report all clear? |
Should protect the secondary means of egress |
|
When doing a transitional attack how long and where should stream be aimed? |
15-20 seconds straight stream and aimed at ceiling |
|
How many acres need to burn to declare it a “wild land fire”? |
50 acres |
|
On wild fire during air water drops how far do FF need to stay away? |
200 feet |
|
How often is the wild land mutual aid agreement with the state renewed? |
Bi annually discretion if fire chief |
|
How many hours does wild land team have before being deployed once the calls have been made? |
2 hours |
|
Bumper have been known to fly how many feet on a car fire ? |
25 |
|
Average tire has how much oil? |
2.5 gallons |
|
During active shooter event, what is THREAT acronym stand for? |
T threat suppression H hemorrhage control R rapid Extrication to safety T transport |
|
Which alarm is “medical supply” added on medical alarm call? |
2nd alarm |
|
If called to a active shooter and unknown how many people are injured which level alarm should be started until triage can be completed? |
1st alarm medical |
|
Infection control plan follow OSHA and NFPA? |
1919.1030 osha 1581 nfpa |
|
Training records got Infection control should be maintained for how many years? |
3 years |
|
Infections cleaning for disinfectant surfaces area. How long do you leave disinfectant left wet for HIV and HBV? |
HIV left wet for 30 seconds HBV left wet for 10 minutes |
|
After washing clothes or items that have bio hazard on it, what is the temp of the next load to make sure washer is clean? |
160 degrees and add bleach |
|
The primary objective is to ______, _______ and ______ any injures or exposed people. |
Evacuate Decon Treat |
|
Second objective after evacuate and treat is to do what on haz mat scene ? |
Identify the type of material involved |
|
Hazard material incident has 2 initial zones with the scene, they are? |
Limited access zone Evacuation zone |
|
Area surrounding LAZ limited access zone ? |
Evacuation zone |
|
3 types of evacuation for haz mat? |
Site evacuation Intermediate level evaluation Large scale evacuation |
|
Site evacuation are small and short, how long is general less than? |
2 hours |
|
Intermediate level evacuation is approximately how many people? And how long? |
Fewer than 100 2-4 hours |
|
On a large scale evaluation who runs the shelters? |
Parks and recreation |
|
How many hours does Park and Recreation need to set up shelters on major evacuation? |
3 hours |
|
When doing evacuation and need to us PA how long and how many siren blasts do you do? |
(3) 5 seconds on YELP |
|
When more then how many people needed to be evacuated they need to notify key city officials? |
10 people evacuated The duty chief Deputy chief tells city manager |
|
Which zone should Decontamination area be set up? Hot, warm or cool |
Hot, near entrance and exit of hot zone or Lobby sector |
|
Up to what weight do Hazardous Materials do not need a D.O.T. Placard? |
1,000 lbs |
|
What popular chemical should not be spayed when in tanks? |
Chlorine |
|
On a radiological hazard where do you put the Hazard red tape to define how many MR/hr? |
2 MR/hr |
|
If nuclear weapon involves fire, evacuate the area how many feet back? |
2,000 feet. |
|
Natural gas is lighter then air and flammable range is between what percentages? |
4% to 15% |
|
Carbon monoxide calls above what PPM of CO should crews where full SCBA? |
35PPM |
|
On Carbon Monoxide call what is considered an above normal reading? |
5PPM |
|
On scene of a confined space command must wait until how many trained personnel are on scene? |
8 |
|
In the definition of a trench is how deep? |
4+ feet |
|
At a trench rescue, how far does first truck back away ? And how far is staging park away?
|
50 feet 150 feet |
|
On trench rescue how far to keep back in feet for non sense traffic and close major streets? |
300’ nonsense 500’ major roads |
|
Trench rescue crowd control, how far to you keep back civilians and also how far keep back non essential personnel? |
300’ civilians 50’ non essential personnel |
|
On trench rescue, how far do you shut down non essential equipment? |
300’ |
|
Trench rescue, how far do you keep ground ladders apart maximum? |
25 feet |
|
High angle rescue, what is considered non-technical rescue which non TRT call out? |
Less than 40 degrees inclination |
|
Rescue ropes, how much % of strength of the rope come from the core? |
75-85% |
|
How to clean rescue rope? |
Wash with mild non chlorine soap and water, let dry in air but not sun light |
|
Water rescue, the order Of try and rescue? 6 low to high risk. |
Talk Reach Throw Row Go Helo |
|
On a tree rescue, how far should the rescue radius be made? Keeps all non essential civilians and non essential rescue personnel out. |
50’ |
|
How long after dispatch do you have to acknowledge call? |
1 min |
|
After how many minutes and attempts will dispatch send a cover unit? |
1 min not acknowledged and 3 attempts to make contact |
|
When will alarm prompt command on getting PAR checks if they haven’t already? |
25 minute timer |
|
What button on MCT is the emergency button? |
F11 |
|
What is code for urgent PD help? |
906 |
|
Level 1 staging, how far back should the units stage back besides fist engine, ladder and BC? |
1 block |
|
When you’re staging sector what if any light do you leave on? |
Red lights on truck and sector vest |
|
During major scenes, staging works under what officer or branch of command? |
Logistics officer |
|
How far should apparatus away from burning building? |
30 ft |
|
Placing cones on freeway, how far should the last cone be from apparatus? |
150 feet |
|
How tall are our cones ? |
28 inches or taller |
|
How far from tall board should last cone be? |
30 feet (buffer zone) |
|
How many paces between each cone? |
10 |
|
While driving, driving code 3 how much faster than posted speed limit is allowed in good road conditions? |
10 mph |
|
Driving through intersection with the right away, how fast are you allowed to go? |
Posted speed limit |
|
If you need to go into on coming traffic driving code 3, how fast can you go? |
10 mph under posted speed limit |
|
When driving and going on coming traffic towards intersection, what is rule for mph and how many feet back? |
Max 20 mph within 100 feet of intersection |
|
Can a tender drive code 3? |
No |
|
While backing apparatus how far should back be behind vehicle? |
10 feet and off to the side |
|
When do you need to have your DOC completed? |
2 years after hire date |
|
When are doc testing done? |
Approximately 30 days after completing there probationary period |
|
How soon before your DOC expires are you notified? |
At least 90 days prior |
|
How often do you need to recertification you DOC? |
Every 3 years |
|
DOC follow certification of what NFPA number? |
NFPA 1002 |
|
For DOC how many hours of driver training do they need? |
24 hours. |
|
For DOC how many hours of driver training do they need? |
24 hours. |
|
During doc process how many minutes Is a code 2 call count towards there total? |
15 minutes |
|
Can you retake DOC test? |
Yes 2 times retake and must what 60 days after original test |
|
When staging in quarters how far away is ok? |
2 blocks |
|
Power lines fall at ground contact how many volts possible? |
7160 volts |
|
When should captain check his and his crews turnouts and how often? |
First Saturday is there Saturday sets, so every 6 weeks |
|
How long do Battlion aids hold onto turnout cleaning records? |
3 years |
|
How long can a helmet be used before it’s replaced? |
10 years |
|
Which BSO is in charge of turn out cleaning and pick up? |
BSO 202 |
|
Never dry turnout in the sun ? True false. |
True |
|
Contaminated turnout should go in what bag? |
Blue bag and clear bag around that |
|
Voucher for structure boots is how much? |
$300 |
|
KNOX keys get checked which days ? |
Accountability day |
|
KNOX keys get checked which days ? |
Accountability day |
|
When you submit you KNOX key form who gets it? |
Bc 203 aide |
|
Bees that are not aggressive and no one is stung if injuryed go to whom? |
Fire prevention |
|
How far back should you park engine from an aggressive swarm of bees? |
150 ft |
|
Bee attacking, what level of class A foam? |
3% |
|
How tall are the wires on light rail ? |
18 feet |
|
In light rail cars, where are most of the electrical and AC units? |
On the roof |
|
On light rail how many feet from power source of light rail? |
10 feet |
|
What is considered a high rise? |
6 elevator stops or 75 feet |
|
How many feet away from high rise is the high hazard zoom for fallen items? |
200’ |
|
If your hot is parked more than how many feet away do you bring your PAR board with you? |
50’ |
|
What does RAT stand for? |
Remote Activation Terminal |
|
After fire when is command supposed to put up fire inspections? Times |
2 4 and 8 hours |
|
Accountability day is when? |
First Saturday of your 3 |
|
Accountability day is when? |
First Saturday of your 3 |
|
How keeps records of your turnouts and also how long do they keep them? |
Battlion Aides and 3 years |
|
Where does ladder company bring passports if assigned to a sector? |
Sector officer or accountability officer |
|
What does ETT for TIC mean? |
Electronic thermal throttle |
|
On thermal what does RHI stand for? |
Relative heat indicator |
|
On thermal what temperature is yellow? |
500 degrees |
|
If you cannot use RAT after fire, what can you do? |
MPD drive by for the first 2 hours |
|
What does logistics do on major events? In your own words |
Support mechanism -rehab -staging -supplies - food fuel |
|
What does planning do on major events? In your own words |
Gathering, analyzing, to help with decision making -evaluate current strategy -organization span of control -future resource |
|
Operation sections did what on major events? In your own words |
Tactical priorities, accountability, safety, build organizational with branch sector. -personnel accountability |
|
If it’s a large scale event, operation officer is in Command post what is his call sign??
If he is in a forward position what is his call sign? |
In command post “command” If forward position “operation” |
|
I’m big event what is administration section do? In your own words |
Risk and financial requirements -documents finance cost of incident - cost recovery - liaison forces city officials - e.o.c. Representative |
|
What does EPOP stand for? Power |
Emergency Power Outage Plan |
|
How much does the LRV light rail vehicle weight? How long? How many people ? |
103,000 lbs 90 feet by 12 feet by 8.5 feet wide 200 people |
|
How fast is light rail? |
35mph but test at 55 mph |