- Front
- Back
Who reviews and approves all departmental PMS schedules? |
Department Head |
|
What is the requirement for repair parts to be listed on an APL? |
List all repair parts |
|
What is the focal point for receipt and distribution of maintenance and material data? |
3M System Central Database |
|
What system is used to effectively manage and control the accomplishment of corrective maintenance? |
MDS System |
|
Who assigns equipment validations to the applicable work center for that week? |
3MC |
|
Who maintains 13 weeks of equipment validations? |
Work Center Supervisor |
|
What is used to uniquely identify each MRC card? |
Library Control Number |
|
How often is up-line reporting required via RADWEB? |
Twice per calendar week |
|
What volume and chapters of the COMUSFLTFORCOMINST 4790.9 (JFMM) pertain to PMS and MDS? |
Volume VI, Chapters 5 and 19 |
|
Who is the ship's 3M Functional Manager |
3MC |
|
What SKED 3.2 display lists the maintenance tasks for a select work center? |
Schedule Display |
|
Who should be listed as a second point of contact on work candidates? |
LCPO |
|
Ins SKED 3.2, what view will be used to print MIPs and MRCs? |
PMS Documents view |
|
What is the ship's 3M manual? |
NAVSEAINST 4790.8(series) |
|
Multi-month checks GREATER than annual will be accomplished within the interval of number of months X 30 days plus or minus ..... days. |
+/- 90 |
|
Who remediates the ship if it fails the Executive Effectiveness Review (EER)? |
ISIC |
|
What will cent sign entries begin with on a Check Note Report? |
Accomplished By |
|
What type of triggers may be added in SKED 3.2 Situational display? |
Local |
|
The PMS cycle will be determined at the discretion of the Type Commander but will not exceed ..... Quarters. |
24 |
|
What quarters are displayed in the schedules display view? |
Current quarter and two future quarters |
|
what does the acronym SPIN stand for? |
Standard PMS Item Name |
|
When requesting a MIP be split between two work centers to ease accomplishment of maintenance requirements, what type of PMS feedback report is submitted? |
Category B |
|
What does the Work Center Supervisor use the CSMP reports for? |
to request out-side assistance |
|
Who is responsible for ensuring 3M documents generated within the division are complete, accurate, promptly prepared, and submitted? |
Division Officer |
|
What is the definition of Status I inactive Equipment Maintenance (IEM) |
Equipment that will be inactive for seven days or longer and is not scheduled for corrective maintenance or overhaul |