Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
25 Cards in this Set
- Front
- Back
WHAT'S THE ANOTHER NAME FOR THE 3M MANUAL?
|
4790.4D
|
|
WHAT DOES CDM STAND FOR?
|
CONFIGURATION DATA MANAGER
|
|
WHO'S RESPONSIBILITY IS TO DEVELOP AND IMPLEMENT THE OVERALL POLICY GOVERNING MANAGEMENT OF THE SHIPS 3-M SYSTEM, ITS DEVELOPMENT, COORDINATION AND MAINTENANCE?
|
CNO (CHIEF OF NAVAL OPERATIONS)
|
|
WHO ENSURES THE QUALITY, COMPLETENESS, AND TIMELY SUBMISSION NECESSARY SKILLS TO ADMINISTER THE PROGRAM?
|
FLEET COMMANDERS
|
|
WHO IMPLEMENT, MANAGE, COORDINATE AND MAINTAIN THE SHIPS 3-M SYSTEM PROGRAM FOR ALL SHIPS AND COMMANDS UNDER ITS COGNIZANCE?
|
COMMANDER FLEET FORCES COMMAND (CFFC)
|
|
WHO CONDUCTS APPROPRIATE REVIEW OF CASUALTY REPORTS, SAFETY ADVISORY AND MISHAP REPORTS, AND MATERIAL INSPECTION?
|
TYPE COMMANDERS (TYCOM)
|
|
WHO MANAGE AND DIRECT THE DEVELOPMENT, IMPLEMENTATION, OPERATIONAL MAINTENANCE AND IMPROVEMENTS OF ALL ASPECTS FO THE SHIPS 3-M SYSTEM THROUGHOUT THE NAVY, BOTH PMS AND MDS?
|
NAVAL SEA SYSTEMS COMMAND (NAVSEASYSCOM)
|
|
WHO PROVIDE GUIDANCE TO PMS DEVELOPERS TO ENSURE COMPLIANCE WITH THE 3-M MANUAL?
|
REGIONAL MAINTENANCE CENTERS (RMC)
|
|
WHO ENSURE APPROPRIATE PMS PACKAGES ARE DELIVERED SIMULTANEOUSLY WITH EQUIPMENT, ENSURE PACKAGES ARE DELIVERED TO THE RMC's FOR INCLUSION IN THE MASTER DATA FILE?
|
SYSCOM/BUMED
|
|
WHO ACTS AS A FINAL REVIEW OFFICERS FOR MAINTENANCE RESPONSIBILITY SHIFTS BETWEEN DEPARTMENTS?
|
EXECUTIVE OFFICER
|
|
WHO DETERMINES INACTIVE EQUIPMENT EQUIPMENT MAINTENANCE (IEM) STATUS?
|
DEPARTMENT HEAD
|
|
WHO REVIEW AND APPROVE QUARTERLY SCHEDULES AND ENSURE THE DIVISIONAL QUARTERLY SCHEDULES UPDATED WEEKLY?
|
DIVISION OFFICER
|
|
WHO SCHEDULES WEEKLY WORK CENTER MAINTENANCE AND SUPERVISE ITS PROPER ACCOMPLISHMENT?
|
WORK CENTER SUPERVISOR
|
|
THE DATE ON THE LOEP IS WRITTEN ON THE CHANGE PAGE UNDER WHAT COLUMN?
|
DATE OF CHANGE
|
|
WHAT IDENTIFIES THE RECOMMENDED SKILL LEVEL OF THE PERSON CONSIDERED CAPABLE OF PERFOMING THE MAINTENANCE REQUIREMENTS QUALIFIED PERSONNLE OTHER THAN THE RATE SPECIFIED MAY BE ASSIGNED?
|
RATE (SKILL LEVEL)
|
|
THE AVERAGE TIME, PER EQUIPMENT, PER PERSON, NEEDED TO PERFORM THE MAINTENANCE REQUIREMENTS?
|
MAN HOURS
|
|
MAINTENANCE REQUIREMENTS THAT MUST BE ACCOMPLISHED CONCURRENTLY WITH ANOTHER MAINTENANCE REQUIREMENTS. (# SYMBOL) i.e. M-3#
|
MANDATORY RELATED MAINTENANCE
|
|
WHAT CODES THAT ARE USED WHEN CONFIGURATIONS OR UTILITY DIFFERENCES OF A PERMANENT NATURE EXIST BETWEEN INSTALLATIONS OF THE SAME SYSTEM OR EQUIPMENT?
|
DUAL PERIODICITY CODE
A DUAL PERIODICITY MAY BE ASSIGNED IF NO OTHER ASPECT OF THE MRC REQUIRES MODIFICATION TO FIT BOTH PERIODICITIES. A NOTE ON THE MIP AND MRC WILL SPECIFY WHICH PERIODICITY CODE TO SCHEDULE. |
|
WHAT CONTAINS THE NUMBER OF TAGS REQUIRED, LOCATION OF TAGS, POSITION OF THE TAGGED ITEM AND PERMISSION OR NOTIFICATION REQUIREMENT?
|
TAG GUIDE LIST
|
|
WHO MAY SUBSTITUTE TOOLS ONLY WITHOUT CHANGING THE MRC?
|
WORK CENTER SUPERVISOR
|
|
IN THE "______" BLOCK, WCS MAY LINE OUT "IF APPLICABLE" OR A NOTE IDENTIFYING STEPS TO BE OMITTED WITHOUT SUBMISSION OF A FBR.
|
PROCEDURE
|
|
IT WAS DESIGNED TO MANAGE PMS SCHEDULE.
|
SKED PROGRAM
|
|
WHAT LOG CONSIST OF THE LAST 13 COMPLETED WEEKS OF MAINTENANCE AND THE CONSURRENT WEEK?
|
13 WEEK ACCOUNTABILITY LOG
|
|
WHAT SIGN INDICATES HIGHER LEVEL TEST REQUIRED?
|
THE CENT SIGN
|
|
WHAT DETERMINES CERTAIN MAINTENANCE REQUIREMENTS ARE NOT APPLICABLE TO EQUIPMENT/SYSTEMS.
|
SCHEDULING AID
|