• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back

What is a monitoring plan?

An over view describing all areas of compliance to state & federal requirements (check list of day to day in regards to guidelines).

Why is it stressed to know calculations that pertain to weir overflow rate, hydraulic loading, surface loading rates and organic loading rates?

To balance the operations with influent & effluent flows.

The "C" factor of a pipe is?

The smoothness of the inside of a pipe. The smoother the pipe, the more flow and higher efficencies.