Who fills out the record sheet and prepares the tags? |
Ship's force petty officer in charge (POIC) of the operation/work item. |
|
What supplemental form is used in conjunction with a work candidate/2K to illustrate a drawing? |
4790/2L |
|
What does the acronym TGL stand for? |
Tag Guide List |
|
How are man hours listed on the MRC card? |
Hours and tenths of hours (.1 = 6 minutes) |
|
What is the periodicity of MRC S-1R? |
Semiannually or during each upkeep period, whichever occurs first. |
|
What prohibits operation or removal of equipment that could jeopardize safety of personnel or endanger equipment, system or components? |
Danger Tag |
|
Which code is a part of a job control number (JCN)? |
Universal identification code |
|
In the "procedure" block, WCSs may line out non-applicable line items (alternate procedures) that do not pertain to current equipment/configuration when the step is followed with the words "if applicable" or a note identifying the steps to be omitted. These items must be reviewed and initialed by the: |
Divisional LCPO/LPO |
|
The maintenance index pages (MIP) are: |
Basic PMS reference documents |
|
What are prepared and issued for each installed system/equipment for which PMS support has been installed? |
Maintenance index pages (MIP) |
|
What are recurring maintenance actions accomplished during an inactive period to prevent equipment deterioration? |
Periodic Maintenance (PM) |
|
What symbol is used to indicate mandatory related maintenance associated with a scheduled maintenance requirement? |
Pound sign (#) |
|
Who is responsible for sustaining the shipboard 3-M program? |
3M Coordinator |
|
Who signs the accountability log for AP checks when outside activity is NOT available to sign for completion of maintenance? |
SMMO |
|
What is required when HAZMAT is transferred from the primary container to a secondary container? |
A label has to be attached. |
|
When is the 13 week accountability log signed by the maintenance person? |
Immediately upon completion of maintenance item |
|
What is another name for the list of effective pages (LOEP)? |
PMS-5 |
|
What is another name for the list of effective pages (LOEP)? |
PMS-5 |
|
Which category of IEM (Inactive Equipment Maintenance) is accomplished on a recurring basis during the inactive period to prevent equipment deterioration? |
Periodic Maintenance (PM) |
|
What is another name for the list of effective pages (LOEP)? |
PMS-5 |
|
Which category of IEM (Inactive Equipment Maintenance) is accomplished on a recurring basis during the inactive period to prevent equipment deterioration? |
Periodic Maintenance (PM) |
|
What does the acronym ACN stand for? |
Advance Change Notice |
|
What is another name for the list of effective pages (LOEP)? |
PMS-5 |
|
Which category of IEM (Inactive Equipment Maintenance) is accomplished on a recurring basis during the inactive period to prevent equipment deterioration? |
Periodic Maintenance (PM) |
|
What does the acronym ACN stand for? |
Advance Change Notice |
|
As a qualified maintenance person, what do you do upon completion of preventive maintenance? |
Sign the accountability log immediately upon completion of maintenance action |
|
What is another name for the list of effective pages (LOEP)? |
PMS-5 |
|
Which category of IEM (Inactive Equipment Maintenance) is accomplished on a recurring basis during the inactive period to prevent equipment deterioration? |
Periodic Maintenance (PM) |
|
What does the acronym ACN stand for? |
Advance Change Notice |
|
As a qualified maintenance person, what do you do upon completion of preventive maintenance? |
Sign the accountability log immediately upon completion of maintenance action |
|
What does the 13 week accountability log consist of? |
Date, tag out serial number, printed name, date signed, date accomplished, periodicity, MIP series. |
|
What is another name for the list of effective pages (LOEP)? |
PMS-5 |
|
Which category of IEM (Inactive Equipment Maintenance) is accomplished on a recurring basis during the inactive period to prevent equipment deterioration? |
Periodic Maintenance (PM) |
|
What does the acronym ACN stand for? |
Advance Change Notice |
|
As a qualified maintenance person, what do you do upon completion of preventive maintenance? |
Sign the accountability log immediately upon completion of maintenance action |
|
What does the 13 week accountability log consist of? |
Date, tag out serial number, printed name, date signed, date accomplished, periodicity, MIP series. |
|
Who reviews and initials LOEP, MIP and MRC line outs? |
Divisional LCPO |
|
What is another name for the list of effective pages (LOEP)? |
PMS-5 |
|
Which category of IEM (Inactive Equipment Maintenance) is accomplished on a recurring basis during the inactive period to prevent equipment deterioration? |
Periodic Maintenance (PM) |
|
What does the acronym ACN stand for? |
Advance Change Notice |
|
As a qualified maintenance person, what do you do upon completion of preventive maintenance? |
Sign the accountability log immediately upon completion of maintenance action |
|
What does the 13 week accountability log consist of? |
Date, tag out serial number, printed name, date signed, date accomplished, periodicity, MIP series. |
|
Who reviews and initials LOEP, MIP and MRC line outs? |
Divisional LCPO |
|
When does the maintenance person performing PMS (planned maintenance system) sign for accomplishment? |
After completion of the maintenance |
|
What is another name for the list of effective pages (LOEP)? |
PMS-5 |
|
Which category of IEM (Inactive Equipment Maintenance) is accomplished on a recurring basis during the inactive period to prevent equipment deterioration? |
Periodic Maintenance (PM) |
|
What does the acronym ACN stand for? |
Advance Change Notice |
|
As a qualified maintenance person, what do you do upon completion of preventive maintenance? |
Sign the accountability log immediately upon completion of maintenance action |
|
What does the 13 week accountability log consist of? |
Date, tag out serial number, printed name, date signed, date accomplished, periodicity, MIP series. |
|
Who reviews and initials LOEP, MIP and MRC line outs? |
Divisional LCPO |
|
When does the maintenance person performing PMS (planned maintenance system) sign for accomplishment? |
After completion of the maintenance |
|
What is the objective of the ship's 3M preventive maintenance system (PMS)? |
Maintain equipment within specifications through preventive maintenance. |
|
What is the focal point for receipt and distribution of maintenance and material data? |
3M system central database |
|
What is the focal point for receipt and distribution of maintenance and material data? |
3M system central database |
|
What are the different SPMIG categories? |
I. Test Equipment II. Materials III. Parts IV. Tools V. Miscellaneous |
|
What is the focal point for receipt and distribution of maintenance and material data? |
3M system central database |
|
What are the different SPMIG categories? |
I. Test Equipment II. Materials III. Parts IV. Tools V. Miscellaneous |
|
Who is the ship's 3M manager and is responsible to the CO for the overall management of ship's 3M system program? |
XO |
|
What are the categories of preliminary PMS Documentation? |
Preliminary MIPS with & without MRCs. |
|
What are the categories of preliminary PMS Documentation? |
Preliminary MIPS with & without MRCs. |
|
What contains all checks that are scheduled for completion in a particular week? |
13 week report |
|
What are the categories of preliminary PMS Documentation? |
Preliminary MIPS with & without MRCs. |
|
What contains all checks that are scheduled for completion in a particular week? |
13 week report |
|
Who reviews MRCs and promptly submits a PMS TFBR, whenever maintenance requirements are NOT fully understood and errors exist? |
Work Center Supervisor (WCS) |
|
What is the purpose of a Location Guide List (LGL)? |
Used with a controlling MRC when the MRC applies to a number of identical pieces of equipment. |
|
On the List Of Effective Pages (LOEP), what does a dash (-) represent? |
MIP changes included in the FR (force revision). |
|
On the List Of Effective Pages (LOEP), what does a dash (-) represent? |
MIP changes included in the FR (force revision). |
|
What instruction dictates the requirements for HAZMAT container labeling? |
OPNAVINST 5100.19 series |
|
On the List Of Effective Pages (LOEP), what does a dash (-) represent? |
MIP changes included in the FR (force revision). |
|
What instruction dictates the requirements for HAZMAT container labeling? |
OPNAVINST 5100.19 series |
|
What block details the sequence of steps to be followed in performing the maintenance action? |
Procedure |
|
If multiple persons are assigned to a single maintenance action, who must sign the 13 week accountability log? |
The petty officer in charge or the most senior person assigned. |
|
If multiple persons are assigned to a single maintenance action, who must sign the 13 week accountability log? |
The petty officer in charge or the most senior person assigned. |
|
The standard PMS Identification Guide (SPMIG) consists of how many categories? |
5 (test equipment, materials, parts, tools, & miscellaneous). |
|
If multiple persons are assigned to a single maintenance action, who must sign the 13 week accountability log? |
The petty officer in charge or the most senior person assigned. |
|
The standard PMS Identification Guide (SPMIG) consists of how many categories? |
5 (test equipment, materials, parts, tools, & miscellaneous). |
|
A quarterly schedule covers what time period? |
Three months |
|
If multiple persons are assigned to a single maintenance action, who must sign the 13 week accountability log? |
The petty officer in charge or the most senior person assigned. |
|
The standard PMS Identification Guide (SPMIG) consists of how many categories? |
5 (test equipment, materials, parts, tools, & miscellaneous). |
|
A quarterly schedule covers what time period? |
Three months |
|
What form is used by maintenance personnel to provide amplifying information related to a maintenance action? |
OPNAV 4790/2L |
|
If multiple persons are assigned to a single maintenance action, who must sign the 13 week accountability log? |
The petty officer in charge or the most senior person assigned. |
|
The standard PMS Identification Guide (SPMIG) consists of how many categories? |
5 (test equipment, materials, parts, tools, & miscellaneous). |
|
A quarterly schedule covers what time period? |
Three months |
|
What form is used by maintenance personnel to provide amplifying information related to a maintenance action? |
OPNAV 4790/2L |
|
What is the definition of preventive maintenance? |
Actions intended to PREVENT or discover functional failures. |
|
If multiple persons are assigned to a single maintenance action, who must sign the 13 week accountability log? |
The petty officer in charge or the most senior person assigned. |
|
The standard PMS Identification Guide (SPMIG) consists of how many categories? |
5 (test equipment, materials, parts, tools, & miscellaneous). |
|
A quarterly schedule covers what time period? |
Three months |
|
What form is used by maintenance personnel to provide amplifying information related to a maintenance action? |
OPNAV 4790/2L |
|
What is the definition of preventive maintenance? |
Actions intended to PREVENT or discover functional failures. |
|
ET division, in Operation Department, owns and performs maintenance on various electrical tools. What division or work center can receive portable electrical tools from the ETs? |
No division or work center |
|
If multiple persons are assigned to a single maintenance action, who must sign the 13 week accountability log? |
The petty officer in charge or the most senior person assigned. |
|
The standard PMS Identification Guide (SPMIG) consists of how many categories? |
5 (test equipment, materials, parts, tools, & miscellaneous). |
|
A quarterly schedule covers what time period? |
Three months |
|
What form is used by maintenance personnel to provide amplifying information related to a maintenance action? |
OPNAV 4790/2L |
|
What is the definition of preventive maintenance? |
Actions intended to PREVENT or discover functional failures. |
|
ET division, in Operation Department, owns and performs maintenance on various electrical tools. What division or work center can receive portable electrical tools from the ETs? |
No division or work center |
|
The PMS feedback report is used by fleet personnel to notify who of matters relating to PMS? |
NAVSEALOGCEN DET Norfolk/NAVSEALOGCEN San Diego |
|
How many types of feedback reports exist? |
3 (technical, non-technical, urgent) |
|
What is used to assign and monitor the accomplishments of required PMS tasks by work center personnel? |
Weekly PMS schedule |
|
What is used to assign and monitor the accomplishments of required PMS tasks by work center personnel? |
Weekly PMS schedule |
|
Who is responsible for the proper performance of the 3M system functions within their respective WORK CENTER? |
Work Center Supervisor (WCS) |
|
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance? |
Safety Precautions |
|
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance? |
Safety Precautions |
|
Which safety precaution applies death or injury? |
Warning(s) |
|
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance? |
Safety Precautions |
|
Which safety precaution applies death or injury? |
Warning(s) |
|
What do the last two numbers on the SYSCOM MIP control number represent? |
Month and year MIP was prepared |
|
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance? |
Safety Precautions |
|
Which safety precaution applies death or injury? |
Warning(s) |
|
What do the last two numbers on the SYSCOM MIP control number represent? |
Month and year MIP was prepared |
|
What are the categories of IEM (Inactive Equipment Maintenance)? |
Lay-Up Maintenance (LU) Periodic Maintenance (PM) Operational Test (OT) Start-Up maintenance (SU) |
|
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance? |
Safety Precautions |
|
Which safety precaution applies death or injury? |
Warning(s) |
|
What do the last two numbers on the SYSCOM MIP control number represent? |
Month and year MIP was prepared |
|
What are the categories of IEM (Inactive Equipment Maintenance)? |
Lay-Up Maintenance (LU) Periodic Maintenance (PM) Operational Test (OT) Start-Up maintenance (SU) |
|
What does the acronym NMR mean? |
No Maintenance Required |
|
Who has overall responsibility for ensuring ship maintenance is accomplished following 3M system and quality maintenance procedures? |
CO (Commissioned Officer) |
|
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance? |
Safety Precautions |
|
Which safety precaution applies death or injury? |
Warning(s) |
|
What do the last two numbers on the SYSCOM MIP control number represent? |
Month and year MIP was prepared |
|
What are the categories of IEM (Inactive Equipment Maintenance)? |
Lay-Up Maintenance (LU) Periodic Maintenance (PM) Operational Test (OT) Start-Up maintenance (SU) |
|
What does the acronym NMR mean? |
No Maintenance Required |
|
Who has overall responsibility for ensuring ship maintenance is accomplished following 3M system and quality maintenance procedures? |
CO (Commissioned Officer) |
|
When preparing a quarterly PMS schedule, how are prospective underway dates identified? |
The dates are shaded across the top through the tick marks on the date bar. |
|
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance? |
Safety Precautions |
|
Which safety precaution applies death or injury? |
Warning(s) |
|
What do the last two numbers on the SYSCOM MIP control number represent? |
Month and year MIP was prepared |
|
What are the categories of IEM (Inactive Equipment Maintenance)? |
Lay-Up Maintenance (LU) Periodic Maintenance (PM) Operational Test (OT) Start-Up maintenance (SU) |
|
What does the acronym NMR mean? |
No Maintenance Required |
|
Who has overall responsibility for ensuring ship maintenance is accomplished following 3M system and quality maintenance procedures? |
CO (Commissioned Officer) |
|
When preparing a quarterly PMS schedule, how are prospective underway dates identified? |
The dates are shaded across the top through the tick marks on the date bar. |
|
Which safety precaution apply to damage to equipment, if not correctly followed? |
Caution |
|
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance? |
Safety Precautions |
|
Which safety precaution applies death or injury? |
Warning(s) |
|
What do the last two numbers on the SYSCOM MIP control number represent? |
Month and year MIP was prepared |
|
What are the categories of IEM (Inactive Equipment Maintenance)? |
Lay-Up Maintenance (LU) Periodic Maintenance (PM) Operational Test (OT) Start-Up maintenance (SU) |
|
What does the acronym NMR mean? |
No Maintenance Required |
|
Who has overall responsibility for ensuring ship maintenance is accomplished following 3M system and quality maintenance procedures? |
CO (Commissioned Officer) |
|
When preparing a quarterly PMS schedule, how are prospective underway dates identified? |
The dates are shaded across the top through the tick marks on the date bar. |
|
Which safety precaution apply to damage to equipment, if not correctly followed? |
Caution |
|
What is NAVSEAINST 4790.8C? |
Ship's 3M manual |
|
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance? |
Safety Precautions |
|
Which safety precaution applies death or injury? |
Warning(s) |
|
What do the last two numbers on the SYSCOM MIP control number represent? |
Month and year MIP was prepared |
|
What are the categories of IEM (Inactive Equipment Maintenance)? |
Lay-Up Maintenance (LU) Periodic Maintenance (PM) Operational Test (OT) Start-Up maintenance (SU) |
|
What does the acronym NMR mean? |
No Maintenance Required |
|
Who has overall responsibility for ensuring ship maintenance is accomplished following 3M system and quality maintenance procedures? |
CO (Commissioned Officer) |
|
When preparing a quarterly PMS schedule, how are prospective underway dates identified? |
The dates are shaded across the top through the tick marks on the date bar. |
|
Which safety precaution apply to damage to equipment, if not correctly followed? |
Caution |
|
What is NAVSEAINST 4790.8C? |
Ship's 3M manual |
|
What does the acronym SPIN stand for? |
Standard PMS Item Name |
|
Which block of the MRC, detailing a listing of those precautions and references, directs attention to hazards to personnel while doing maintenance? |
Safety Precautions |
|
What must hazmat labels contain? |
Manufacturer Name & Address Stock Number HCC Target Organ Effected Material Name |
|
What are the different periodicities? |
D: Daily 2D: Every 2 days W: Weekly 2W: Every 2 Weeks M: Monthly (3-5 weeks) 2M: Every 2 months Q: Quarterly (2-4 months) S: Semi-Annually (4-8 months) A: Annual (+/- 90 days from scheduled date) |
|
What are the non-calendar periodicity codes? |
R (Situational Requirements) U (Unscheduled Maintenance) AP (Assessment Procedure) |
|
Who is the functional manager of the 3M system at each command? |
3M Coordinator |
|
Which safety precaution applies death or injury? |
Warning(s) |
|
What do the last two numbers on the SYSCOM MIP control number represent? |
Month and year MIP was prepared |
|
What are the categories of IEM (Inactive Equipment Maintenance)? |
Lay-Up Maintenance (LU) Periodic Maintenance (PM) Operational Test (OT) Start-Up maintenance (SU) |
|
What does the acronym NMR mean? |
No Maintenance Required |
|
Who has overall responsibility for ensuring ship maintenance is accomplished following 3M system and quality maintenance procedures? |
CO (Commissioned Officer) |
|
When preparing a quarterly PMS schedule, how are prospective underway dates identified? |
The dates are shaded across the top through the tick marks on the date bar. |
|
Which safety precaution apply to damage to equipment, if not correctly followed? |
Caution |
|
What is NAVSEAINST 4790.8C? |
Ship's 3M manual |
|
What does the acronym SPIN stand for? |
Standard PMS Item Name |
|
Who is responsible for the administration of their cognizant (known) tag-out log? |
Authorizing Officer |
|
What contains the information necessary for equipment tag out associated with PMS accomplishment? |
Tag Guide List (TGL) |
|
What contains the information necessary for equipment tag out associated with PMS accomplishment? |
Tag Guide List (TGL) |
|
What is the 4-digit number assigned by the work center to the maintenance action, or assigned by the outside activity performing the work? |
Job Sequence Number (JSN) |
|
What contains the information necessary for equipment tag out associated with PMS accomplishment? |
Tag Guide List (TGL) |
|
What is the 4-digit number assigned by the work center to the maintenance action, or assigned by the outside activity performing the work? |
Job Sequence Number (JSN) |
|
What makes up a Job Control Number (JCN)? |
Unit Identification Code (UIC) (Ex: 21412) Work Center (Ex: CS63) Job Sequence Number (JSN) (Ex: 1234) |
|
What contains the information necessary for equipment tag out associated with PMS accomplishment? |
Tag Guide List (TGL) |
|
What is the 4-digit number assigned by the work center to the maintenance action, or assigned by the outside activity performing the work? |
Job Sequence Number (JSN) |
|
What makes up a Job Control Number (JCN)? |
Unit Identification Code (UIC) (Ex: 21412) Work Center (Ex: CS63) Job Sequence Number (JSN) (Ex: 1234) |
|
The PMS cycle will be determined at the discretion of the Type Commander, but will not exceed how many quarters? |
24 |
|
What contains the information necessary for equipment tag out associated with PMS accomplishment? |
Tag Guide List (TGL) |
|
What is the 4-digit number assigned by the work center to the maintenance action, or assigned by the outside activity performing the work? |
Job Sequence Number (JSN) |
|
What makes up a Job Control Number (JCN)? |
Unit Identification Code (UIC) (Ex: 21412) Work Center (Ex: CS63) Job Sequence Number (JSN) (Ex: 1234) |
|
The PMS cycle will be determined at the discretion of the Type Commander, but will not exceed how many quarters? |
24 |
|
What is the purpose of a Maintenance Requirement Card (MRC)? |
Provide detailed procedures for performing maintenance requirements. |
|
What contains the information necessary for equipment tag out associated with PMS accomplishment? |
Tag Guide List (TGL) |
|
What is the 4-digit number assigned by the work center to the maintenance action, or assigned by the outside activity performing the work? |
Job Sequence Number (JSN) |
|
What makes up a Job Control Number (JCN)? |
Unit Identification Code (UIC) (Ex: 21412) Work Center (Ex: CS63) Job Sequence Number (JSN) (Ex: 1234) |
|
The PMS cycle will be determined at the discretion of the Type Commander, but will not exceed how many quarters? |
24 |
|
What is the purpose of a Maintenance Requirement Card (MRC)? |
Provide detailed procedures for performing maintenance requirements. |
|
What does COMNAVSURFPAC/COMNAVSURFLANTIST 4790.I pertain to? |
Surface force maintenance and material (3M) assessment and certification program. |
|
True/False: IEM Status 1 equipment applies to equipment inactive for more than 30 days and is scheduled for removal. |
False |
|
True/False: IEM periodicity code "SU" stands for stand up maintenance. |
False (start up maintenance) |
|
What is the PMS "cycle" board used for? |
Used to prepare quarterly schedule. |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who prepares the "weekly" schedule? |
Work Center Supervisor (WCS) |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who prepares the "weekly" schedule? |
Work Center Supervisor (WCS) |
|
What is "gun decking"? |
Intentional falsification of records. |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who prepares the "weekly" schedule? |
Work Center Supervisor (WCS) |
|
What is "gun decking"? |
Intentional falsification of records. |
|
What is SKED? |
A computer based program used to schedule and plan. |
|
Who assigns serial numbers to PMS FBRs? |
3M system coordinator |
|
What should you do if you discover inaccurate data on an MRC? |
Inform your WCS (work center supervisor) of the discrepancy. |
|
Who is responsible for signing the quarterly schedule? |
Department Head |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who prepares the "weekly" schedule? |
Work Center Supervisor (WCS) |
|
What is "gun decking"? |
Intentional falsification of records. |
|
What is SKED? |
A computer based program used to schedule and plan. |
|
Who assigns serial numbers to PMS FBRs? |
3M system coordinator |
|
What should you do if you discover inaccurate data on an MRC? |
Inform your WCS (work center supervisor) of the discrepancy. |
|
Who is responsible for signing the quarterly schedule? |
Department Head |
|
What best describes the Equipment Guide List (EGL)? |
Lists a number of pieces of identical equipment, which can be worked on & completed in a single workday. |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
What are the 2 types of maintenance actions? |
Preventive and Corrective |
|
What color is an MRC that's classified? |
Pink |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who prepares the "weekly" schedule? |
Work Center Supervisor (WCS) |
|
What is "gun decking"? |
Intentional falsification of records. |
|
What is SKED? |
A computer based program used to schedule and plan. |
|
Who assigns serial numbers to PMS FBRs? |
3M system coordinator |
|
What should you do if you discover inaccurate data on an MRC? |
Inform your WCS (work center supervisor) of the discrepancy. |
|
Who is responsible for signing the quarterly schedule? |
Department Head |
|
What best describes the Equipment Guide List (EGL)? |
Lists a number of pieces of identical equipment, which can be worked on & completed in a single workday. |
|
Where would you verify your MIP? |
LOEP (List Of Effective Pages) |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
What are the 2 types of maintenance actions? |
Preventive and Corrective |
|
What color is an MRC that's classified? |
Pink |
|
What does FR stand for? |
Force Revision |
|
What does an "X" on the quarterly schedule mean? |
Action fully accomplished |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who prepares the "weekly" schedule? |
Work Center Supervisor (WCS) |
|
What is "gun decking"? |
Intentional falsification of records. |
|
What is SKED? |
A computer based program used to schedule and plan. |
|
Who assigns serial numbers to PMS FBRs? |
3M system coordinator |
|
What should you do if you discover inaccurate data on an MRC? |
Inform your WCS (work center supervisor) of the discrepancy. |
|
Who is responsible for signing the quarterly schedule? |
Department Head |
|
What best describes the Equipment Guide List (EGL)? |
Lists a number of pieces of identical equipment, which can be worked on & completed in a single workday. |
|
Where would you verify your MIP? |
LOEP (List Of Effective Pages) |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
What are the 2 types of maintenance actions? |
Preventive and Corrective |
|
What color is an MRC that's classified? |
Pink |
|
What does FR stand for? |
Force Revision |
|
What does an "X" on the quarterly schedule mean? |
Action fully accomplished |
|
Who can initiate an FBR (feedback report)? |
Anyone in the Chain of Command |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who prepares the "weekly" schedule? |
Work Center Supervisor (WCS) |
|
What is "gun decking"? |
Intentional falsification of records. |
|
What is SKED? |
A computer based program used to schedule and plan. |
|
Who assigns serial numbers to PMS FBRs? |
3M system coordinator |
|
What should you do if you discover inaccurate data on an MRC? |
Inform your WCS (work center supervisor) of the discrepancy. |
|
Who is responsible for signing the quarterly schedule? |
Department Head |
|
What best describes the Equipment Guide List (EGL)? |
Lists a number of pieces of identical equipment, which can be worked on & completed in a single workday. |
|
Where would you verify your MIP? |
LOEP (List Of Effective Pages) |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
What are the 2 types of maintenance actions? |
Preventive and Corrective |
|
What color is an MRC that's classified? |
Pink |
|
What does FR stand for? |
Force Revision |
|
What does an "X" on the quarterly schedule mean? |
Action fully accomplished |
|
Who can initiate an FBR (feedback report)? |
Anyone in the Chain of Command |
|
Urgent FBRs (Feedback Reports) submitted for safety of personnel, ship, or potential for damage to equipment must be forwarded by: |
Naval message |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who prepares the "weekly" schedule? |
Work Center Supervisor (WCS) |
|
What is "gun decking"? |
Intentional falsification of records. |
|
What is SKED? |
A computer based program used to schedule and plan. |
|
Who assigns serial numbers to PMS FBRs? |
3M system coordinator |
|
What should you do if you discover inaccurate data on an MRC? |
Inform your WCS (work center supervisor) of the discrepancy. |
|
Who is responsible for signing the quarterly schedule? |
Department Head |
|
What best describes the Equipment Guide List (EGL)? |
Lists a number of pieces of identical equipment, which can be worked on & completed in a single workday. |
|
Where would you verify your MIP? |
LOEP (List Of Effective Pages) |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
What are the 2 types of maintenance actions? |
Preventive and Corrective |
|
What color is an MRC that's classified? |
Pink |
|
What does FR stand for? |
Force Revision |
|
What does an "X" on the quarterly schedule mean? |
Action fully accomplished |
|
Who can initiate an FBR (feedback report)? |
Anyone in the Chain of Command |
|
Urgent FBRs (Feedback Reports) submitted for safety of personnel, ship, or potential for damage to equipment must be forwarded by: |
Naval message |
|
What is the "W" in R-IW? |
Periodicity code |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who prepares the "weekly" schedule? |
Work Center Supervisor (WCS) |
|
What is "gun decking"? |
Intentional falsification of records. |
|
What is SKED? |
A computer based program used to schedule and plan. |
|
Who assigns serial numbers to PMS FBRs? |
3M system coordinator |
|
What should you do if you discover inaccurate data on an MRC? |
Inform your WCS (work center supervisor) of the discrepancy. |
|
Who is responsible for signing the quarterly schedule? |
Department Head |
|
What best describes the Equipment Guide List (EGL)? |
Lists a number of pieces of identical equipment, which can be worked on & completed in a single workday. |
|
Where would you verify your MIP? |
LOEP (List Of Effective Pages) |
|
Who signs the "weekly" PMS schedule? |
Division Officer |
|
What are the 2 types of maintenance actions? |
Preventive and Corrective |
|
What color is an MRC that's classified? |
Pink |
|
What does FR stand for? |
Force Revision |
|
What does an "X" on the quarterly schedule mean? |
Action fully accomplished |
|
Who can initiate an FBR (feedback report)? |
Anyone in the Chain of Command |
|
Urgent FBRs (Feedback Reports) submitted for safety of personnel, ship, or potential for damage to equipment must be forwarded by: |
Naval message |
|
What is the "W" in R-IW? |
Periodicity code |
|
What does it mean when equipment is in "Lay-Up" status? |
The equipment is in an IEM (inactive equipment maintenance) status. |
|
Who signs the "cycle" PMS schedule? |
Department Head |
|
Who prepares the "weekly" schedule? |
Work Center Supervisor (WCS) |
|
What is "gun decking"? |
Intentional falsification of records. |
|
What is SKED? |
A computer based program used to schedule and plan. |
|
Who assigns serial numbers to PMS FBRs? |
3M system coordinator |
|
What should you do if you discover inaccurate data on an MRC? |
Inform your WCS (work center supervisor) of the discrepancy. |
|
Who is responsible for signing the quarterly schedule? |
Department Head |
|
What best describes the Equipment Guide List (EGL)? |
Lists a number of pieces of identical equipment, which can be worked on & completed in a single workday. |
|
Where would you verify your MIP? |
LOEP (List Of Effective Pages) |
|
What is the purpose of the MRC? |
To provide step by step procedures to effectively perform PMS. |
|
Who is primarily responsible for conducting maintenance on a piece of equipment? |
Maintenance person |
|
Who is primarily responsible for conducting maintenance on a piece of equipment? |
Maintenance person |
|
The WCS (work center supervisor) can make pen and ink changes to which block on the MRC? |
Safety Precautions |
|
Who is primarily responsible for conducting maintenance on a piece of equipment? |
Maintenance person |
|
The WCS (work center supervisor) can make pen and ink changes to which block on the MRC? |
Safety Precautions |
|
What does MIP mean? |
Maintenance Index Page |
|
Who is primarily responsible for conducting maintenance on a piece of equipment? |
Maintenance person |
|
The WCS (work center supervisor) can make pen and ink changes to which block on the MRC? |
Safety Precautions |
|
What does MIP mean? |
Maintenance Index Page |
|
"U" is an example of what? |
A non-calendar periodicity |
|
What response best describes the work center PMS manual? |
Reflects the portion of the PMS master file that's applicable to a particular work center. |
|
Calendar periodicity code "2W" means what? |
Every 2nd week |
|
How much time can elapse between monthly checks? |
3-6 weeks |
|
How much time can elapse between quarterly checks? |
2-4 months |
|
How much time can elapse between annual checks? |
3-5 quarters |
|
How much time can elapse between annual checks? |
3-5 quarters |
|
What does the "R" stand for in M-IR? |
Situation code |