• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back
What is it called when outside air is led directly into the watch stations
Total replenishment ventilation
Cutters having equipment outfitted with zinc shall report the following in the unit zinc log
Machinery and zinc location, types types and amount of zinc in use
What goes in section of the cutter engineering report
Remarks
What is followed on shore stations for tagout procedures
Oh SH a standards
Who is responsible for engineering procedures
Eo
How many decimals for single hearing protection, how many for level
85 single, 105 double
Which is not part of a hos log
Outboard hoses
What are four types of casualty reports
Initial, update, correct, cancel
Just for use, subject temporary hoses to the shop hydrostatic test pressure of at least
110%
When is amp n information mandatory
Reporting delay in correcting casualty due to parts unavailability, number of hours expended correcting casualty, number of operating hours since the last failure
Drawings under swbs number 101 pertains to what
Structural drawings
What are two levels of maintenance used in the Coast Guard
Organizational, depot
One strip line on a CAS reps provides what
milstrip info for parts
What does Swbs 300 represent
Electrical plant general
What does Swbs 100 represent
hull ll structures