• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back
WHAT IS THE WEIGHT AND BALANCE
FORM F NUMBER?
DD FORM 365-4
When will you complete the weight and balance form F?
DURING ALL AIRCRAFT CONFIGURATION CHANGES
AND, WILL BE COMPLETED PRIOR TO FLIGHT.
What is the diffention of a Functional check?
A functional check is a check to determine if a system or component
is correctly performing its intended function
WHAT IS THE PRECEDENCE OF DIRECTIVES.
1. Asset Computerized Maintenance System (ACMS)
2. Coast Guard TOs
3. Air Force TOs
4. Navy TOs
5. Army TOs
6. Commercial Publications
Coast Guard electronic technical manuals are available on ?
Naval Air Technical Data and Engineering Service Command (NATEC) website through
TMAPS
When conflict of information exists, ___________shall
take precedence over CGTOs, which take precedence
over other DoD publications
ACMS MPCs
TMAPS STANDS FOR?
TECHNICALMANUAL APPLICATION SYSTEM
A TCTO master file is maintained and is accessible through
TMAPS
The following restrictions apply to performing maintenance actions early:____/_____% maximum for scheduled component changes.
Thirty days/10% maximum
Are extensions authorized for Low Cycle Fatigue
(LCF) or other fatigue life limits on aircraft components?
No extensions are authorized
For the HH65: Weekly 7 days ACMS May be extended ____ day to meet workload, scheduling, or operational requirements
1 day
Maintenance errors contribute to approximately ___% of DoD and commercial aviation mishaps
20%
Refresher MRM training is required how often?
biennially (every 2 years
SUPPORT EQUIPMENT (SE). Lead time for planning, budgeting, and procurement of major items of SE is
3 Years
The ALSE Prime Unit is where?
ATC Mobile.