• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/33

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

33 Cards in this Set

  • Front
  • Back

In your own words, What are your responsibilities as a team leader?

In charge of evolution, reads checklist to team members and insures each step is properly completed before moving onto the next step

Before loading a hellfire, Place the launcher holdback release handle to what position?

Unlatched

Once R&C Checks are complete and weapons are loaded how long can they remain loaded without doing another check?

72 hours

How soon prior to shooting live audience to Release and control checks need to be performed?

Within 24 hours

Can you perform released control checks with launchers installed or ordinance

Release and controls may be performed with m299 loaded if all bru 65 Cartridges are removed

What instruction governs the ordnance qualification program?

8023.24C

How long is your Ordinance certification valid for?

It’s valid until the last day of the 12 month after being certified or until decertified or revoked by proper authority

What are some factors taken into consideration when suspending or revoking certification

Explosive mishaps, reckless operation of support equipment, disregard/negligence of safety, substance abuse

What is the number one priority of every single ordnance evolution?

Safety

What four things should be accomplished prior to beginning an ordnance evolution?

Aircraft grounded,aircraft chocked,power removed and air craft prep

How many sections in the agm 114 and what are they

Seeker


Warhead


Guidance


Propulsion


Control

It’s hard refueling authorize with ordnance loaded?

It’s only permitted with commanding officer approval

What are some of the different characteristics between the mk-25 and Mk-58

Mk25 yellow flame 13.5-18.5 minutes


Mk-58 yellow flame 40-60min

How many sections are there to the LWS000. And what are they

Introduction, description, configuration data, release and control system checks, and common procedures

What are the danger areas associated with the aircraft

Engine intake, engine exhaust, flight controls, main rotor blades, tell rotor blades, chaff/flare dispensers, fwd/aft of loaded ordnance

What is the purpose of the jettison system?

To jettison either all stores or selected stores and expendable countermeasures in the event of an emergency

What size suspension does the bru 65 use and with is the safe working load ?

-14 inches m/ 1000 lbs

What is the approximate weight length and diameter of a AGM114 missile what

98.5 lbs


64/7 inches

What test set is used to perform jettison checks ?

AWM102



What test set is used to perform release and control checks ? Why

AWM103


Verifies the aircraft weapon release and control systems are properly functionable

What test set is used to perform ALE47 dispenser checks ?

ALM290

What cads and how many are used in the bru65 ?

CCU107


We use two in a bru

What do you torque the BRU65 store chocking control to after loading stores ?

200 in. lbs

If it flare tube exhibits any sign of visible damage or has been dropped, what should you do?

Do not handle or load. Notify EOD for disposal immediately

What part of the chaff/flare bucket allows you to set the configuration of what is loaded?

MAG ID switches S1 and S2

What is the arm/de-arm publications

LWS 680

What is the standard loading procedures publication?

LWS 000

What is the hellfire load procedure publication

LWS 620

What is the gau 17 gun system check publication?

LWS 230

What does WARNING mean?

A procedure a practice that if not followed could result in personal injury or loss of life

What does NOTE mean?

An operating procedure Or condition which is essential to highlight

What does CAUTION mean?

An operating procedure or practice which if not strictly observed could result to damage or destruction of equipment

What is the lws-720

Ale-47