• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/16

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

16 Cards in this Set

  • Front
  • Back
How many & what points are available for Water Efficiency?
5 Points: WEc1.1 Water Efficient Landscaping, reduce by 50%; WEc1.2 H2O Efficient Landscaping, no potable use or no irrigation; WEc2 Innovative Wastewater Technologies; WEc3.1 Water Use Reduction 20%; WEc3.2 Water Use Reduction 30%
What is the intent of WEc1.1 Water Efficient Landscaping, reduce by 50%?
Limit or reduce use of potable water for landscape irrigation.
What are the requirements of WEc1.1 Water Efficient Landscaping, reduce by 50%?
Use high-efficiency irrigation technology. Use captured or recycled site water to reduce H2O consumption for irrigation by 50% over conventional.
What are the submittals required for WEc1.1 Water Efficient Landscaping, reduce by 50%?
LEED Letter Template declaring potable water consumption reduced by 50%. Include brief narrative of equipment and plants.
What is the intent of WEc1.2 Water Efficient Landscaping, no potable water use or irrigation?
Limit or eliminate the use of potable water for landscape irrigation.
What are the requirements of WEc1.2 Water Efficient Landscaping, no potable water use or irrigation?
Use only captured rain or recycled site water to elimate all potable water use OR, do not install permanent landscape irrigation systems.
What are the submittals required for WEc1.2 Water Efficient Landscaping, no potable water use or irrigation?
Leed Letter Template declaring the the project site will not use potable water for irrigation including narrative describing systems OR, LLT declaring no permanent landscape irrigation system.
What is the intent of WEc2 Innovative Wastewater Technologies?
Reduce generation of wastewater and potable water demand, while increasing the local aquifer recharge.
What are the requirements WEc2 Innovative Wastewater Technologies?
Reduce the use of municipally provided potable water for building sewage conveyance by a min 50% OR, treat 100% of waste water on site to tertiary standardds.
What is the intent of WEc3.1 Water Use Reduction: 20% Reduction?
Maximize water efficiency within buildings to reduce burden on municipal water supply and wastewater systems.
What are the requirements of WEc3.1 Water Use Reduction: 20% Reduction?
Employ strategies that in aggregate use 20% less potable water use baseline calculated for the building after meeting fixture requirements.
What are the submittals required for WEc3.1 Water Use Reduction: 20% Reduction?
Provide LLT declaring reduction by 20% and provide spreadsheet calculation demonstrating reduction by 20% compared to baseline.
What is the intent of WEc3.2 Water Use Reduction: 30% Reduction?
Maximize water efficiency within buildings to reduce burden on municipal water supply and wastewater systems.
What are the requirements of WEc3.2 Water Use Reduction: 30% Reduction?
Employ strategies that in aggregate use 30% less potable water use baseline calculated for the building after meeting fixture requirements.
What are the submittals required for WEc3.2 Water Use Reduction: 30% Reduction?
Provide LLT declaring reduction by 30% and provide spreadsheet calculation demonstrating reduction by 30% compared to baseline.
WEc1 Water Efficient Landscaping has two credits available - what for?
Water Efficient Landscaping: WEc1.1 Reduce by 50%; WEc1.2 Not potable or no irrigation