Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
5 Cards in this Set
- Front
- Back
Software lifecycle
|
the period of time that begins when a software product is conceived and ends when the software is not longer available
|
|
System of systems
|
multiple heterogeneous, distributed systems that are embedded in network at multiple levels and in multiple domains and are interconnected, addressing large scale interdisciplinary common problems & purposes.
|
|
Name SW Lifecycle steps
|
1. Concept phase
2. Requirements phase 3. Design phase 4. Implementation phase 5. Test phase 6. Installation & check out phase 7. Operation & maintenance phase 8. Reirement phase (optional) NB: Phases can overlap or be performed iteratively |
|
Name typical Test levels
|
1. Unit or component
2. Integration 3. System 4. Acceptance |
|
When does test analysis start?
|
Test analysis starts immediately after or even concurrently with test planning
|