• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/50

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

50 Cards in this Set

  • Front
  • Back

Describe HSTs Electrical Bus

4160 VAC Ring Bus, provides 60 Hz/3-Phase

SSTGs rating?

8000 kW/1388 Amps

SSTGs feed power to what?

S-Group (switchboards)

EDGs rating?

2000 kW/347 Amps

What are the EDGs 2 modes of operation?

Manual


Automatic

EDGs feed power to what?

Vital Loads when NORM & ALT power are lost

S-Group (switchboards) feed what?

NORM pwr to gen & funct L/C's


NORM & ALT pwr to E-Boards

S-Group (switchboards) receive power from where?

SSTGs (underway)


Shore Power (inport)


EDGs (emergency)

E-Boards primary function?

Feed ALT pwr to vital loads when NORM pwr is lost

E-Boards have how many power sources?

3 via a 3-way ABT

What equipment is fed directly from the E-Board?

L/C 68A & 68B


CHT System

How many transformers for E-Boards?

1 transformer each


Feeds 450VAC to assoc equip

When do EDGs operate in AUTO?

NORM and ALT pwr loss

What are 1E-4E E-Boards power sources.

Switchboard NORM ALT EMERG


1E 4S 1S 1EDG


2E 3S 2S 2EDG


3E 2S 3S 3EDG


4E 1S 4S 4EDG

How many Topside Load Centers? How many in the Reactor Plant?

25


8


(33 Total)

How many electrical zones? Identify each zone?

Zone 1 : Bow-FR 44


Zone 2 : FR 44-FR 64


Zone 3 : FR 64-FR 96


Zone 4 : FR 96-FR 128


Zone 5 : FR 128-FR 148


Zone 6 : FR 148-FR 180


Zone 7 : FR 180-FR 210


Zone 8 : FR 210-FR 235


Zone 9 : FR 235-Stern

S-Group and E-Board L/Cs?

1S - 12,21,22,31,32,34,45,46,53


2S - 11,33,51


3S - 52,66,67,71,72,73,81,83


4S - 65,82,91


2E - 68A


4E - 68B

Describe a General Load Center? How many per electrical zone?


How many sources of power?

Ventilation, lighting, & other loads. Ventilation control panel inside.


1 per zone


1 source of power


Describe a Functional Load Center? How many sources of power?

1 funct, i.e. Catapults, ACEs.


Loads fed are part of that sys.


2 sources of power.

What are the General Load Centers?

L/C Location


11 2-25-2-Q


22 2-49-2-Q


32 2-78-0-Q


46 2-96-4-Q


52 2-138-0-Q


65 2-175-2-Q


72 2-197-1-Q


83 2-222-2-Q


91 2-243-0-Q

What are the Functional Load Centers?

L/C Location L/C Location


12 2-25-2-Q 66 03-148-8-Q


21 6-44-0-E 67 03-180-11-Q


31 2-78-0-Q 68A 03-165-8-Q


33 03-79-9-Q 68B 03-165-8-Q


34 03-69-4-Q 71 7-180-0-E


45 3-96-5-Q 73 5-200-2-Q


51 3-133-1-Q 81 3-198-1-Q


53 03-138-5-Q 82 3-200-10-Q

General Load Center loads?

L/C Loads


11 Anchor, Cath Protect, WR1&2


22 1SSFCA&B, (F) Sklry, Weps Def


32 (F) Galy, (F) O2N2, (F) AFFF Pmp


46 (F) Div Drs, Med/Dent, Comm,


Port Boat Davit


52 (A) Sklry, Repl Winch, Vend Mac


65 (A) Galy, Capt Galy, Flag Galy


72 (A) O2N2, ADP, Arst Gear, WR3,


Stbd Boat Davit, (A) AFFF Pump


83 3SSFCA&B, FP 16-17-18-22


(A) Cath, CPO Galy, Crane, Incin


91 Lndry, Emer Str, CIWS 22&23

Functional Load Center loads 2nd deck and below?

L/C Loads


12 4ACMR, AC 9


21 AC 1&2, (F) Rfers, FP 1-3, (F) JP5


31 Weps El, FP 4-5-6


45 ACE #1


51 ACE #2, List Control, Padeyes


71 AC 3&4, (A) Rfers, FP 14-15,


(A) JP5


73 AC 8&10


81 ACE #3


82 ACE #4

Functional Load Center loads on the 03 Level?

L/C Loads


33 Cat #1


34 Cat #2


53 Cmbt Sys Electronics


66 Cat #3&4, (A) Div Dr


67 Island Power


68A LC 53 Backup


68B LC 67 Backup

What is different about Load Centers 12, 21, 71, and 73?

12 - NORM pwr is 1S, ALT pwr is 4S


(Tagged out and DFS in)


21 - Has 2 buses (1 vital, 1 non-vital)


ALT pwr NORM underway


71 - Has 3 buses (2 vital, 1 non-vital)


No interlock for MBT on Vital B


Possible both sources to be on


ALT pwr NORM underway


73 - ALT pwr is 2S


Pwr from S-Group to MBT first,


then trnsfrm then to swtchbrd


Both pwr source not avail same,


if MBT fails 4160V is paralleled


out of phase and explosion

What are the 400Hz load centers and their locations? What are the 400Hz switchboards and their locations?

1SF1&2 - (03-44-1-Q)


2SF1&2 - (03-138-5-Q) LC 53


3SF1&2 - (03-204-2-Q) CPO Head



1SF - (Fwd Diesel)


2SFA&B - (2 SwitchGear)


3SF - (Aft Diesel)

Describe motor driven generator? Describe solid state freq converters? How many frequency converters?

300kW/450V/3 Phase - MG



144kW/450V/3 Phase - 6 FCs


1SSFC A&B


2SSFC A&B


3SSFC A&B

What are the pwr sources for the 400Hz machines (MGs & FCs)? What are their locations?

1SSFC A&B - LC 22


2SFMG A&B - LC 64 (MBT - LC 44)


3SFMG B - LC 83



1SSFC A&B - (4-34-0-E) Fwd EDG


2SFMG A&B - (4-165-0-E) MMR #2


3SFMG B - (7-225-0-E) Aft EDG

Can SSFCs and SFMGs be put in parallel?

No

Transformers purpose? Location? E-Boards transformer purpose? What prevents condensation build-up?

Change 4160V to 450VAC


In LC space for most topside LCs


Provide pwr to funct LCs via MBT


Heaters prevent condensation


What are feeder breakers?

Feed pwr to transformers, load centers, and MBTs on the 4160 ring bus directly from S-Groups

What are bus ties?

Breakers used to connect a bus or group of buses together.


Provided between switchboards to allow for load transfers.

Describe ABTs (Auto Bus Transfer)?

Associated with vital equipment


Have 2 sources of power:


NORM / Preferred


ALT / EMERG


Auto shft to ALT when NORM lost


Elect interlocks prev 2 src cntct


Contact CHENG to test ABT

How many knobs do A-2 ABTs have? What do they do?

3 knobs


Preferred/EMERG or NORM/ALT


Auto/Manual


Test

How many knobs do A-3 ABT have? What do they do?

4


Preferred or NORM


EMERG or ALT


Auto/Manual


Test

How to shift A-3 ABT?

Obtain Permission


Place in Manual


Turn NORM or EMERG OFF


Turn EMERG or NORM ON


Leave in Manual if on EMERG

Describe MBTs (Manual Bus Trans)? How many power sources? How is power transferred?

Associated with vital electronic equip and some non-vital electronic equip


Have 2 sources of power


Power transfer is done manually

How to shift MBTs?

Establish COMMS with IEW/CAO


Obtain authorization from IEW/CAO


Ensure power source is available


Loosen mechanical interlock


Open breaker on present source


Slide interlock over open breaker


Close brk on incoming pwr source


Check for ground


Report shift to IEW/CAO and Log it

Describe the ground detector?

3 lights to mn bus checks 3 phs


Connected thru transf to mn bus


A, B, and C lights


If light shunted, ground present

Describe CKT 12-TM purpose? Location? Alarm settings?

Transformer temp monitor


Monitors 4160VAC transf temp


12-TM panel located in Central


Alarm Settings:


-General Pwr (255°F)


-Function Pwr (265°F)

Pneumatic Breakers purpose?

Turn on/off equipment such as:


A/C Plant compressors


Motor Generator sets

How to close Pneumatic Breakers?

Unlock handle


Pull handle until locks in position


Pump it approx 4-7 times


Breaker is charged, ready to close


Push down tab in lwr right crn


Listen to brk close


Observe blue indicating light on


Unlock handle, restore position


Conduct ground check, log it


Normal lineup for negative ventilation?

Supply: low speed


Exhaust: high speed

XOs ventilation controller location?

7-190-0-L (Outside Pmp Rm #3)

Load Center sound powered phone circuit?

5JV2

What load centers don't have a J-Dial?

3SF1&2

When an ABT fails to switch (A-3)?

Obtain permission to shift


Place in Manual


Turn NORM switch to OFF


Turn EMERG switch to ON


Leave in Manual


Notify w/c to trblsht the ABT

What if transformer high temp alarm goes off?

Check space ventilation


Investigate for a fire


Investigate other casualties


If meter pegs out, poss bad module

Loss of power to load center indications?

Ground detector lights out


No lights on ventilation panels


Transformer not humming


Transformer heater light on

Loss of power?

1S - LC 53 (2SF1&2)


2S - Nearest affected LC


3S - LC 67


4S - Nearest affected LC


(F) 400Hz - LC 22


Check 1SFGA&B feeder brks


(A) 400Hz - LC 83


Check 3SFGA&B feeder brks