• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back

List processes in project schedule management

1. Plan scheduled management


2. Define activities


3. Sequence activities


4. Estimate activity duration


5. Develop schedule


6. Control schedule

Define decomposition

Technique to divide and sub divide the project scope and project deliverables into smaller more manageable parts

Define Rolling wave planning

Iterative planing technique in which work to be performed in the near term is planned in detail, while work in the future is planned at a higher level

Define lead

Amount of time a successor activity can be advanced with respect to a predecessor activity

Define lag

Amount of time a successor activity has to be delayed with respect to predecessors activity

Define analogous estimating

Estimating duration or cost of an activity based on historical data. Like previous similar projects.