Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
25 Cards in this Set
- Front
- Back
NAME ALL ENGINES ROOM WATCHES
|
EOOW MOOW
MMOW EPCP THROTTLE MAN UPPER AND LOWER EVAP WATCH |
|
NAME THREE MAJOR PIECES OF EQUIPMENT IN THE ENGINE ROOM LOWER LEVEL?
|
#3 FIRE PUME
1, 3, AND 4 LPAC SCOOP EJECTOR |
|
NAME THREE MAJOR PIECES OF EQUIPMENT IN THE ENGINE ROOM UPPER LEVEL?
|
A/B DISTILLING PLANT
#2 LPAC B&C SSTG 43A & 43B LOAD CENTER HP/LP TURBINE |
|
NAME ALL OF THE COILS AND WHAT COILS NOT COMMONLY VESSELS ABOARD VSS BLR?
|
A COIL
M COIL FP-QP FL-Q1 COIL COMMONLY USED FOR MINEWSWEEPERS ONLY |
|
WAHT ARE THE PARAMETER FOR THE SSDG?
|
450 VOLTS
60 HZ 1875 KW 3200 A |
|
WHAT ARE THE PARAMETERS FOR THE SSTG?
|
450 VOLTS AC
60 HZ 2,000 KW 32, 000 KA 1200 RPM |
|
WHAT IS THE RANGE OF PSI FOR HPAC & LPAC?
|
HP AIR- 1,000-3000 PSI
LP AIR- O-125 PSI |
|
WHAT ARE THE PARAMETER FOR THE EDG?
|
450 V
60 HZ 750 KW 1200 A |
|
NAME FOUR TESTS DONE ON BOILER FEED WATER?
|
CONDUCTIVITY
ALKALINITY PHOSPHATES CHLORIDE |
|
WHAT IS THE PURPOSE OF DEGAUSSING?
|
A METHOD USED TO REDUCE A SHIPS MAGNETIC SIGNATURE
|
|
FIRE ROOM WATCHES?
|
BTOW ( BOILER TECH OW)
FIRE ROOM LOWER LEVEL FIRE ROOM UPPER BURNER MAIN |
|
WHAT ARE THE TYPES OF FUEL ONBOARD AND THEIR USES?
|
F-76/ DFM- BOILERS
JPS- BOILER EDGE EMERGENCY DIESEL GENERATION P-100- SMALL BOATS, HELOS |
|
WHAT IS A DFT AND PURPOSE?
|
DE- AERATION FUEL TAIND
DE- AERATE, STORE, AND PRHEAT FEED WATER |
|
WHAT TYPE OF BOILERS ARE ONBOARD?
|
TYPE D FOSTER WHEELER
|
|
WHAT USES 400 HZ?
|
ELECTRONICS
RADARS GYROS HELOS CIWS COMBAT SYSTEM EQUIP. |
|
HOW MUCH WATER CAN ONE DISTILLING PLANT (EVAPS) PRODUCE IN ONE DAY?
|
50,000 GALLONS EACH DAY
|
|
NAME ALL OF THE LUBE OIL SERVICE PUMPS?
|
ALOP ( ATTACH LUBE OIL PUMP)
SLOP ( STEAM LUBE OIL PUMP) ELOP( EMERGENCY LUBE OIL PUMP) |
|
NAME FOUR TEST DONE ON LUBE OIL?
|
CLEAR AND BRIGHT
HOT BATH TRANSPARENCY BS&W |
|
NAME THREE MAJOR PIECES OF EQUIPMENT IN THE FIRE ROOM UPPER LEVEL?
|
DFT
A,B AND C MAIN FEED PUMP 1A SSTG- SHIPS SERVICE TURBINE GENERATOR LOAD CENTER 32A AND LOAD CENTER 32B |
|
NAME THREE MAJOR PIECES OF EQUIPMENT IN THE FIRE ROOM LOWER LEVEL?
|
# 2 FIRE PUMP
BTOW CONSOLE #1 A AND 1B BOILERS #1 AND 2 FUEL SERVICE PUMPS 2, 3, AND 4 FUEL TRANSFER PUMP |
|
NAME FOUR TEST DONE ON FUEL OIL?
|
FLASH POINT
API SPECIFIC BB & W CLEAR AND BRIGHT |
|
NAME THE PHASES OF THE BASIC STEAM CYCLE AND THE MAJOR PIECES OF EQUIP IN THOSE PHASES?
|
FEED WATER- LOWER HALF DFT- MAIN FEED PUMP
BOOSTER PUMP AND ECONOMIZER GENERATION- BOILER, ECPANSION HP/LP TURBINE CONDENSATION- MAIN CONDENSER, MAIN CONDENSTE PUMP AIR EJECTOR UPPER HALF DFT |
|
WHAT TYPE OF DISTILLING PLANTS ONBOARD?
|
5 STAGE FLASH-TYPE LOW PRESSURE
|
|
WHAT IS THE SHIPS MAXIMUM STORAGE CAPACITY FOR POTABLE WATER?
|
123, 152 GALLONS
|
|
WHAT ARE THE FOUR METHODS OF STEERING THE SHIP?
|
HELM
PORT/STDB TRICK WHEEL HAND PUMP LOCKING NUTS |