Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/75

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

75 Cards in this Set

  • Front
  • Back

All of the finish grade references on the drawings are keyed to a

Benchmark

The different elevations on a site are shown as __________ on the site plan.

Contour Lines

Local building codes may include a(n) __________ requirement in which the property owner cannot build.

Easement

The __________ shows the structure from either the front or the side.

Elevation View

A __________ may influence the position of a structure on the depth of the site.

Front Setback

Official survey points may be marked using __________.

Monuments

Lumber is commonly sold by its __________ rather than its actual dimensions.

Nominal Size

The __________ shows the structure from above.

Plan View

The legal boundaries of a site are known as __________.

Property Lines

A __________ depicts the connections of a piping system.

Riser Diagram

A detailed drawing of a region that depicts the natural and man-made features is a __________.

Topographical Survey

The types of lines used on a construction drawing to show parts that are obstructed by another surface or part that is closer to the viewer are __________.



A. Object Lines


B. Leader Lines


C. Center Lines


D. Hidden Lines

D. Hidden Lines

Additional information about doors and windows can be located __________.



A. In a separate door & window schedule


B. In the legend


C. In the title block


D. On the cover sheet of the drawings


A. In a separate door and window schedule.

The type of welding to be performed is indicated using a _________.



A. Welding Symbol


B. Schematic


C. Weld Symbol


D. Plumbing Symbol

C. Weld Symbol

The same abbreviations are used by all architects and engineers.



True


False

False

If a line on a drawing actually measures 4" long and the drawing scale is 1/2" = 1'-0", the line represents an item that is __________.



A. 4' Long


B. 8' Long


C. 12' Long


D. 16' Long

B. 8' Long

The construction drawing that commonly includes the direction and length of property boundaries, location of utilities, and existing grade contours is the ___________.



A. Foundation Plan


B. Floor Plan


C. Mechanical Plan


D. Site Plan

D. Site Plan

The numbering system for "MasterFormat 2012" contains ___________.



A. Four Digits


B. Six Digits


C. Ten Digits


D. Sixteen Digits

B. Six Digits

The International Building Code was first introduced in ______________.



A. 1986


B. 1986


C. 2000


D. 2012

C. 2000

When using the 3-4-5 method to create a 90° angle and the first two sides measure 21' & 28', the length of the hypotenuse is ______________.



A. 14'


B. 24'


C. 35'


D. 42'

C. 35'

A drawing that shows the horizontal view of a building, the length and width of the building, and the floor layout of the rooms is called ______________.



A. Elevation Drawing


B. Foundation Plan


C. Plot Plan


D. Floor Plan

D. Floor Plan

The distance required by building code from the street to the front of a structure is called _____________.



A. Street Easement


B. Front Setback


C. Porch Line


D. Parkway

B. Front Setback

Roof plans provide a side view of the structure.



True


False

TRUE

Which three organizations worked together to develop the International Building Code?



A. ICBO, BOCA, NFPA


B. SBCCI, NFPA, ICBO


C. NFPA, BOCA, SBCCI


D. BOCA, ICBO, SBCCI

D. BOCA - ICBO - SBCCI

The 3-4-5 rule, used when squaring a building, is based on the _____________.



A. Isosceles Triangle


B. Right Triangle


C. Equilateral Triangle


D. Acute Triangle


B. Right Triangle

Which of the following triangles does NOT follow the 3-4-5 rule?



A. 10.5 - 14 - 17.5


B. 21 - 28 - 35


C. 18 - 24 - 36


D. 15 - 20 - 25

C. 18 - 24 - 36

The edges and joints of the building wrap should be sealed using _____________.



A. Contact Cement


B. Water Proof Adhesive


C. Metal Furring Channels


D. Special Contractor's Tape

D. Special Contractors Tape

When applying building wrap, all wall openings, such as doors and windows, should be covered.



True


False

TRUE

Windows that swing open like a door are ____________.



A. Fixed Windows


B. Awning Windows


C. Hopper Windows


D. Casement Windows

D. Casement Windows

Which of the following windows cannot be opened?



A. Awning Windows


B. Casement Windows


C. Skylights


D. Roof Windows

Skylights

The typical height for an exterior door is _____________.



A. 64"


B. 70"


C. 76"


D. 80"

D. 80"

A window is plumbed and leveled using _____________.



A. Shims


B. A Crowbar


C. An Extension Jamb


D. The Hinge Jamb

A. Shims

Secure a window unit to framing members using ____________.



A. Duplex Nails


B. Casing Nails


C. Brads


D. Finishing Nails

B. Casing Nails

When replacing windows in older buildings, it may be necessary to build out the jamb using ____________.



A. 2x4's


B. Additional Framing Members


C. Jamb Extensions


D. Gypsum Board

C. Jamb Extensions

The difference in size between the nominal and actual sizes of glass block is _____________.



A. ⅛"


B. ¼"


C. ⅜"


D. ¾"

D. ¾"

The direction of door swing is determined when ______________.



A. Facing the door from the inside of the building


B. The architect develops the plans


C. Facing the door from the outside of the building


D. The door is installed in the rough opening


C. Facing the door from the outside of the building

Commercial exterior doors are often installed by teams that have been specially trained by the door manufacturer.



TRUE


FALSE

True

For locksets, the typical center-to-floor distance is ___________.



A. 24"


B. 32"


C. 36"


D. 42"

C. 36"

The framework around the glass in a window is the ______________.



A. Schenker


B. Sash


C. Casing


D. Header

B. Sash

A double-hung window contains __________.



A. A single, fixed sash


B. Two fixed sashes


C. One fixed sash & one movable sash


D. Two movable sashes

D. Two Movable Sashes

Of the following types of glazing, the one with the greatest insulating value is



A. DS


B. Low-E


C. Double-Pane


D. Argon Filled


B. Low-E

The top horizontal member of a window frame is the ___________.



A. Header


B. Stile


C. Trimmer


D. Head Jamb

D. Head Jamb

The most common thickness of an exterior residential door is ____________.



A. 1¼"


B. 1½"


C. 1¾"


D. 2"

C. 1¾"

When using casing nails to install a window, what tool should be used to drive the head of the nail below the surface without denting the frame?



A. Plumb Bob


B. Casing Tool


C. Nail Set


D. Jab Saw

C. Nail Set

To determine the size opening needed for a glass block window add an allowance for expansion strips at the header and at the jamb of



A. 3/8"


B. 1/2"


C. 5/8"


D. 3/4"


A. 3/8"

Once a window is installed, trim should be fastened in place using ___________.



A. Casing Nails


B. Panel Adhesive


C. Staples


D. Finish Nails


D. Finish Nails

The horizontal member at the bottom of a door opening is __________.



A. Threshold


B. Stile


C. Footer


D. Rail


A. Threshold

When installing an exterior door, the top inner screw on each hinge should be replaced with a _____________.



A. Lag Bolt


B. 2-1/2" or 3" Wood Screw


C. 1-1/2" Drive Screw


D. 16D Nail


B. 2-1/2" or 3" Wood Screw

Shims can be moist easily cut to size by __________.



A. Scoring with a knife & snapping


B. Using tin snips


C. Sawing


D. Using a chisel and mallet


A. Scoring with a knife & snapping

Which of the following types of locksets is most secure?



A. Cylindrical


B. Mortise


C. Deadbolt


D. Tubular


B. Mortise

Building wrap is made from __________.



A. Polyethylene Fiber


B. Fiberglass


C. Polyurethane Strands


D. Recycled Paper


A. Polyethylene Fiber

The exterior walls, doors, windows, and roof are all part of the __________.

Building Envelope

Wood windows commonly use __________ or aluminum for cladding.

Polyvinyl Chloride (PVC)

A door with a light uses __________ to secure the panes of glass.

Muntins

The glass inserts in a door are called __________.

Lights

Locks on traditional double-hung windows would most likely be attached to the top __________ of the window.

Rail

The lock on a traditional panel door would most likely be attached to the the __________ opposite the hinges.

Jamb

A skylight that forms a peak is called a __________ skylight.

Hipped

A __________ is part of a window that holds the glass.

Sash

A layer of __________ is installed over the wall sheathing to minimize air infiltration.

Building Wrap

A skylight is often mounted on a raised frame known as a __________.

Curb

When you walk through a door you step over the __________.

Threshold

The trim around a window or door is known as the __________.


Casing

The material used as glass in doors or windows is referred to as __________.


Glazing

The efficiency of insulation is known as its __________.

R-value

The living room, bedrooms, kitchen, and other rooms to which heated or chilled air is delivered are the ___________.

Conditioned Space

A __________ allows passage of light and may be used for ventilation.

Window

__________ is an acrylic/portland cement exterior finish often used on commercial buildings.

Exterior Insulation & Finishing System (EIFS)

The lockset is installed in the __________ of a panel door.

Stile

_________ allow materials to change dimension as a result of heating or cooling.

Expansion Strips

__________ is installed around a wall or roof opening to seal it against leakage.

Flashing

Use __________ to level or plumb a window or door in the rough opening.

Shims

A __________ must be installed to provide security to a building's inhabitants.

Lockset

The side of a door frame opposite to the side where the strike plate is installed is the __________.

Hinge Jamb

The window stiles butt into the __________ on the lower end.

Sill