• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back
1. Which of the following statements about Work Centers are correct?
(Choose all that apply)
a. A cost center can be assigned to a work center
b. People, Positions and Qualifications can be assigned to a work center on the Scheduling tab.
c. Formula keys are used to calculate cost, calculate execution time and calculate capacity requirements
d. Work Centers are used to maintain resource related data.
Answers: A,C,D
2. Which of the following are elements of a Production Order?
(Choose all that apply)
a. A production order must have at least two operations
b. Material components, PRTs and trigger points can be assigned to a Production Order
c. Documents from the Document Management System can be linked to Production Orders
d. Only Actual costs can be tracked on a Production Order
e. The Production Order Status controls the allowed activities
Answers: B,C,E
3. Which functions of a production order can be automated?
(Choose all that apply)
a. Order Release
b. Material Staging
c. Material Withdrawal Posting
d. Goods Receipt.
e. Order Settlement
Answers: A,C,D
4. Which documents are created as a result of Goods Issue Posting?
(Choose all that apply)
a. Pick List
b. Material Document
c. Accounting Document
d. Controlling Document
e. Production Order Document
Answers: B,C,D
5. What status must a Production Order be at in order to complete Material Withdrawals?
(Choose the correct answer)
a. Created
b. Material Availability Check
c. Settlement Rule Created
d. Released
e. Printed
Answer: D
6. A plant is a:
(Choose all that apply)
a. Manufacturing facility
b. Distribution Center
c. Plant Maintenance Plant
d. Inventory
Answers: A,B,C
7. The Material Master can be created in two ways – what are they:
Answers: Special and general ;
8. What kind of documents are created during goods issue for a production order?
(Choose all that apply)
a. Purchase Requisition
b. Material Reservation
c. Controlling document (Yes – posting to cost center)
d. Material Document (Yes – Inventory movement document)
e. Financial Accounting Document (Yes – Financial accounting document) :
Answers: C,D,E
9. What is the structure of a production order?
Answers: header, operations, items ;
10. How would you describe the integration of the Vendor Master:
(Choose all that apply)
a. Be directly used in production
b. Groups of views for SD
c. Groups of views for FI
d. Be used to post directly in supplier or vendor accounting :
Answers: B,C,D