• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)

Plan Scope Management

Looks at the other 5 scope processes and plans the overall approach as to how they will be carried out.

Part of a loop.

Collect Requirements

Understanding what is needed to satisfy the stakeholders and then documenting that understanding.

Documenting the common understanding of the project.

Define Scope

The process where the project’s requirements are more thoroughly understood and documented.

Clear understanding of the requirements to be executed.

Create WBS

Creates the Work Breakdown Structure & the Scope Baseline

Validate Scope

The process of ensuring that the product, service, or result of the project matches the documented scope.

Concerned w/the acceptance of the product by the project Mgr, sponsee or customer

Control Scope

Maintaining control of the project by preventing scope change requests from overwhelming the project.

Ensures scope baseline is always kept current.