Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
6 Cards in this Set
- Front
- Back
- 3rd side (hint)
Plan Scope Management |
Looks at the other 5 scope processes and plans the overall approach as to how they will be carried out. |
Part of a loop. |
|
Collect Requirements |
Understanding what is needed to satisfy the stakeholders and then documenting that understanding. |
Documenting the common understanding of the project. |
|
Define Scope |
The process where the project’s requirements are more thoroughly understood and documented. |
Clear understanding of the requirements to be executed. |
|
Create WBS |
Creates the Work Breakdown Structure & the Scope Baseline |
|
|
Validate Scope |
The process of ensuring that the product, service, or result of the project matches the documented scope. |
Concerned w/the acceptance of the product by the project Mgr, sponsee or customer |
|
Control Scope |
Maintaining control of the project by preventing scope change requests from overwhelming the project. |
Ensures scope baseline is always kept current. |