Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
180 Cards in this Set
- Front
- Back
What are the 3 ITER categories? |
Initial, Update, Correction
|
|
Purpose of a pilot course
|
Validate curriculum and supporting materials |
|
FCR compared to HPRR
|
FCR is school house focused, validates HPRR process, ensures training requirements are executed
|
|
Four HPRR messages
|
Annual HPRR Schedule (30 days prior to OCT1) |
|
What are OCCSTDS?
|
Minimum skills required of enlisted personnel by resource and warfare sponsors
|
|
What are OCCSTDS used for?
|
manning, distribution, training, advancement
|
|
Where are E-4 and below OCCSTDS that are not taught in A-School taught?
|
OBT, OJT, Proficiency training
|
|
Explain ITER condition RED
|
Condition that cancels or stops training. OR degrades an NEC course to the point that the NEC can't be given |
|
Explain ITER condition YELLOW
|
Condition that may result in delayed or canceled training, failure to instruct critical LO, effect timeline or quality of instruction |
|
What is the plan phase of (TBC) Task Based Curriculum development?
|
Used as a blueprint for developing of a new course or for revising course. |
|
Explain the Cost Benefit of BCA
|
For each option it lists initial and ongoing costs as relative to financial and non-financial benefits. |
|
Explain BCA implementation strategy
|
Ensures approving authority understands the resources they must allocate
|
|
Where is PQS located?
|
NKO @ Navy PQS portal
|
|
Function of PQS
|
standardized process to demonstrate minimum knowledge and skill for a station
|
|
What happens when PQS is superseded?
|
All signatures transfer, only new line items learned/signed
|
|
Purpose of NTSP
|
Documents which communicate manpower, personnel, and training (MPT) gaps and needs ISO new acquisition and modernization programs
|
|
How many ACAT categories are there?
|
ACAT I - ACAT IV
|
|
Purpose of TTA (Training Transfer Agreement)
|
ensures successful transfer of training system products
|
|
5 threshold levels for NTSP submittal
|
6 YEARS prior to IOC if military construction required |
|
Outcome of the IMDP?
|
Detail and demonstrate the design intent for each module
How course will achieve intended training |
|
Describe A School
|
Initial basic training
|
|
Define C school
|
Advanced specialized training
|
|
Define F school
|
Functional skills / rating specific
|
|
Course Supervisor's role in testing
|
Monitors and validates admin, conducts test item analysis
|
|
Participating activity's role in testing
|
Provides comments, feedback, and suggests new test items
|
|
Describe formal testing
|
graded and used towards trainee's final grade
|
|
Describe informal testing
|
graded or ungraded, does not count toward trainee's final grade
|
|
Who drafts NETC's response to ITERs?
|
NETC TPC
|
|
What is NETC N1?
|
total force manpower
|
|
What is NETC N4?
|
facilities and logistics
|
|
What is NETC N6?
|
Chief information officer
|
|
What is NETC N7?
|
Learning and development
|
|
What is NETC N8?
|
resources, requirement, and assessments
|
|
Purpose of ITER
|
Process of reporting conditions that may reduce ability to train
|
|
Purpose of IMM
|
Present body of information, largely self supporting, used for self study or skill acquisition
|
|
Minimum sections of a lesson plan
|
Front matter and lesson topics
|
|
Minimum sections of a trainee guide
|
Front matter and instruction sheets
|
|
What are course critiques used for?
|
measure course effectiveness, instructor performance, and quality of life issues
|
|
Instructor qualifications will measure what?
|
The instructors SME knowledge and instructor technique
|
|
What is on the MTS Community of Practice (COP)?
|
MTS program manager, instructions, MTS PQS, cert requests, program description, feedback
|
|
Describe strategic alignment within BCA
|
Tells the reader how plan aligns with Navy goals and level of impact (High, Med, Low)
|
|
What does the use of alternatives state within BCA?
|
List of alternatives for a problem or opportunity. Details list of options including "do nothing"
|
|
Describe the risk assessment portion of BCA
|
Lists risks associated with each option including controls
|
|
Describe high risk training
|
A state where an elevated probability of a loss or an increased level of severity is present
|
|
What RAC are associated with high risk training?
|
RAC 1 or 2 or 3 w/ severity of 1 or 2
|
|
What are examples of high risk training?
|
Firefighting, small arms gunshot
|
|
State the test failure policy
|
Failed test, retrain, retest, if passed highest score = 80%
|
|
Describe the 3 levels of skill learning level criticality
|
High (3) - skill used in job performance
Med (2) - skill influences job performance Low (1) - skill has little influence on job performance |
|
What is the (DAPS) defense automated printing system's role within NRTCs?
|
Links NETPDTC and NLL to provide customer document ordered
|
|
Who receives points for NRTCs and why?
|
Primarily reservists for retirement and EVALs
|
|
Purpose of CTTL
|
Building block of a course
- used to develop LOs and course material |
|
Purpose of testing
|
Measure trainee's attainment of TO/EO, gauge course success
|
|
Describe FCR
|
Check technical accuracy and teachability of a course, identifies area of improvement
|
|
FCR Periodicity
|
Annually, Biannually, Triennially
not to exceed 3 years, chosen by CCA |
|
Who approves TPP per triggered event with zero sum gain?
|
NETC N7
|
|
Who approves TPP requiring offsets?
|
OPNAV
|
|
Describe SERENA
|
Web based app allowing learning centers to upload, maintain, and manage TPPs
|
|
types of TPPs in SERENA
|
New, revised, modified, and deactivated
|
|
How often are safety stand-downs required?
|
1 annually
|
|
What is used to designate voluntary schools in CeTARS?
|
"A" or "D" |
|
What does the CeTARSii menu allow?
|
Allows user to view form 51of course data entry
|
|
What does CeTARS monitor allow?
|
Course overview, student activity, quality assurance, and metrics
|
|
Define the 3 task sets
|
Coordinator - overall authority and responsibility
Director - direct supervisor (LCPO, DIVO, DH) Performer - one who does the hands on work |
|
When should job sheet development begin?
|
After the TPS (Training Path System) is complete
|
|
Purpose of CANTRAC
|
Generalized information on training activities and course descriptions
|
|
Purpose of CeTARS
|
Manage and support the Navy training effort by providing student and course information
|
|
Who is responsible for the accuracy of CeTARS?
|
CCA
|
|
What are the Learning center CO's roles within JDTA?
|
CCA, ensure compliance IAW NETC, signs and forwards JDTA data report
|
|
What are the DoT's roles within JDTA?
|
approves and releases messages, assigns coordinator
|
|
What are the LSO's roles within JDTA?
|
JDTA guidance/assistance, reviews messages and reports
|
|
What are the JDTA coordinator's roles within JDTA?
|
drafts announcement, agenda, and completion messages. Maintains documentation and COP
|
|
What are the stakeholder's roles within JDTA?
|
Provides technical documentation
|
|
What is the ultimate goal of instruction?
|
Keep the student motivated after the instruction has ended and to apply what they learned to their life and job
|
|
Which AIM tool is used for TBC (Task based curriculum) development?
|
AIM II
|
|
Which AIM tool is used for PPP curriculum development?
|
AIM I
|
|
How often is MTO data gathered ad how is it sent?
|
Weekly VIA Naval Message
|
|
Identify the 3 parts of a CIN (Course identification number)
|
1st Piece - what organization has control of course
2nd Piece - Skill defense group 3rd Piece - Sequence Identifier |
|
What is the CDPC (Course Data Processing Code) used for?
|
Uniquely identifies each course and its location
|
|
If PQS items are signed in school, what does the receiving command do?
|
Line items may be transferred
Interim qualification can be given requal of PQS |
|
What is the difference between PQS and JQR?
|
PQS is for multiple platforms and JQR is platform specific
|
|
Who approves JQRs and PQS?
|
TYCOM
|
|
Who reports MTOs?
|
TSC/TSD VIA Naval Message
|
|
5 examples of MTOs
|
Command quota is a no show with no replacement
Command cancels 4 or fewer day before school with no replacement Student doesn't meet pre-reqs Student absent in excess to graduate Student can't receive credit due to command recall |
|
3 types of training material provided by ILE?
|
Instructor led, Interactive multimedia, blended
|
|
Purpose of HPRR
|
Revalidate training requirements, identify new training requirements
|
|
HPPR Periodicity
|
36 months unless triggered
|
|
4 HPRR triggers
|
Sponsor request
Fleet feedback Course surveillance CCA Directed |
|
Purpose of TPP
|
describes all factors need to prepare and conduct a training program
|
|
Who initially approves the TPP?
|
CCA
|
|
Most essential link in training
|
The instructor
|
|
Process of piloting a test
|
Assess test reliability and make corrections
|
|
Two types of testing methods
|
Criterion referenced - is required level of skill and knowledge met
Norm referenced - skill or knowledge in relation to group norm |
|
What type of training is received through E-Learning?
|
Formal, Informal, GMT, NMT, and Pre-Req Training
|
|
Content processing phases in E-Learning development
|
Announced, Submitted, Received, NeL Review, Returned, Sponsor Review, Approved, On Hold, Hosted, Hosted A-School, Hosted Non-Standard, Retired |
|
What are the triggers for converting PPP curriculum to Task Based?
|
Revision or outdated system where training only needs to be knowledge / task based |
|
What are NETC's roles within HPRR?
|
Provides policy and guidance
|
|
What are NETC N7's roles within HPRR?
|
Oversight of policy and guidance
|
|
What are the Learning Center CO's roles within HPRR?
|
CCA, Chairs the executive steering committee
|
|
What are the learning center DOT's roles within HPRR?
|
HPRR Oversight, member of ESC, releases messages
|
|
What are the Learning center LSO's roles within HPRR?
|
Manages HPPR, drafts schedule and messages
|
|
What is NETC's role within testing?
|
Testing policy and guidance
|
|
What is NETC N7's role within testing?
|
Oversight of testing policy and guidance
|
|
What are the roles of the Learning center CO within testing?
|
CCA, incorporates TYCOM test banks, manages sites
|
|
What happens during GCAT?
|
SME's test course prior to it becoming active in NeL
|
|
What is the CCMM's role within training?
|
Develop, revise, maintain courses of instruction
|
|
What is the participating activity's roles within training?
|
Assist the CCMM
|
|
Purpose of FEA
|
Method to determine the best training and delivery method for a new course OR identify gaps in existing course
|
|
When is FEA conducted?
|
After JDTA, Before BCA
|
|
Who determines what curriculum development method will be used for modifications?
|
CCA
|
|
How does motivation effect learning?
|
Increases scholastic performance, often determines student success
|
|
What is the LSO's role within testing?
|
guidance to test developers, monitors test item analysis
|
|
What are the CCMM's roles within testing?
|
Approves test design, maintains master test bank
|
|
What are the curriculum developer's roles within testing?
|
Develops test plan, admin guides, and tests
|
|
What is the Learning Site CO's role within testing?
|
Implements test plan, assigns Testing Officer
|
|
What are the Learning Site Testing Officer's roles within testing?
|
Test Admin, grading, secures test and test banks
|
|
What is the purpose of the content planning module?
|
Document and map JDTA data
Supports the design of ILE learning content |
|
Four areas within CPM
|
Home, JDTA, Projects, Reports
|
|
Primary input into the CPM
|
JDTA
|
|
What items are developed during the development phase of content development?
|
Lesson plan, trainee guide, test items, IMM
|
|
What is the ToS?
|
skill and knowledge to be learned
|
|
What are (TLA) training level assignments?
|
Lists line items to be taught
training where each will be taught and level of training. |
|
When can an ARB be convened?
|
When academic counseling, remediation, and setback have failed
|
|
Who maintains the MRAT?
|
CCMM
|
|
What is contained in the MRAT?
|
Maintained for the life of the course
-Summary of Major Events -Approval Letters |
|
What is the purpose of JDTA?
|
To establish a repeatable and defendable process to revise and develop training for fleet requirements
|
|
2 Methods of testing
|
Knowledge and performance
|
|
Primary sources of test items
|
JDTA
OCCSTDS CTTL/PPP COI |
|
How does ENTRS work?
|
Provides a means for fleet activities to view and request seats in designated Navy school
|
|
What part of CeTARS initially inputs and updates course that auto-updates CANTRAC?
|
DISCOVERER
|
|
What functional area of CeTARS contains the CIN, Student info, CDP, and more...
|
CeTARS Menu
|
|
What materials are used in presenting instruction?
|
Lesson plan, instruction sheets, IMM
|
|
Purpose of BCA
|
Structured methodology to facilitate decision making process.
Intro of alternative / solution to implementation |
|
Explain the executive summary portion of BCA
|
Summary of highlights within BCA
What it is, how it will be put into effect, and how it helps the government |
|
Instructor responsibility IAW NAVEDTRA 134 when dealing with students
|
Help them resolve conflict
set a good example teach effectively |
|
Instructor responsibility IAW NAVEDTRA 134 when dealing with safety
|
Safety is paramount
Demonstrate proper safety ensure a safe training environment |
|
Instructor responsibility IAW NAVEDTRA 134 when dealing with security
|
know all security handling requirements
don't downplay security ensure security is followed |
|
Instructor responsibility IAW NAVEDTRA 134 when dealing with curriculum
|
Don't down material / state you don't like / or its boring
Know the difference between a change and a revision in curriculum Change = pen & ink Revision = Requires TPP and CCA Approval |
|
What are NETPDTC's role with NRTCs?
|
Maintain, Grade, and enter into sailor's ESR
|
|
Purpose of NRTCs
|
Self study package to help acquire Navy Professionalism and Military Knowledge for advancement exams
|
|
Contracting Office Representative's role with NRTCs
|
Liaison between learning center and contractor to ensure the delivery of product
|
|
What is the statement of work (SOW) in relation to NRTCs
|
Outline requirements for learning center and contactor to develop the NRTC
|
|
What is the role of the NLL (Navy Logistic Library) in relation to NRTCs
|
Centralized point where all NRTCs are assigned stock numbers
|
|
Purpose of the resource sponsor commitment
|
NETC requires commitment that training requirements are valid and will be funded by resource sponsor
|
|
Acceptable means for resource sponsors to identify commitment of resources
|
Naval message, Digitally signed email, Command letterhead
|
|
What are the roles of OPNAV within OCCSTDS?
|
Reviews and approves OCCSTDS
|
|
What are the roles of Resource Sponsors within OCCSTDS?
|
Reviews and Approves TTA
|
|
What are the roles of Fleet/Type Commanders within OCCSTDS?
|
Review OCCSTDS for validity and pay grade responsibility
|
|
What is the roles of NAVMAC within OCCSTDS?
|
Ensure OCCSTDS are issued within a timely manner
|
|
What is NETC's role within OCCSTDS?
|
Implement OCCSTDS into training
|
|
What is involved in an instructor screening?
|
Service Record Screen
Physical Requirements Medical Officer Interview (Record Review & Questionnaire) CO's Interview |
|
Purpose of Navy training
|
A systematic approach on what to train and how to best accomplish the training
|
|
What annexes are in the TCCD?
|
Resource requirements, time allocations, other items
|
|
What does the RRL list?
|
ALL materials, facilities, manpower, and funding needed for a course
|
|
What does the Naval Training system's requirements, acquisition, and management provide?
|
Policy for planning, determining, and documenting manpower, personnel, and training requirements for new and modernized systems
|
|
Purpose of the NTSP?
|
Document prepared for traceability ISO of new or modernized Naval capabilities
|
|
CeTARS date can be export in what formats?
|
Excel, Word, PDF
|
|
What forms of training does ILE support?
|
Instructor led, facilitated, computer based
|
|
What does Navy E-Learning provide?
|
Training anytime / anywhere
|
|
What is the roles of the HPRR coordinator's roles within HPRR?
|
Plans HPRR, collects and posts technical documents, CCMM
|
|
What is the role of the HPRR ESC within HPRR?
|
Required
Reviews, Validates, and prioritizes Action Chits |
|
What is the role of the stakeholders within HPRR?
|
Person responsible for training requirements under HPRR review
|
|
What are external triggers for JDTA?
|
NTSP Revision
ORM Fleet Performance Assessment fleet Input HPRR |
|
What are internal triggers of JDTA?
|
Revision to OCCSTDS
rate Merger Establishment or Revision to NEC |
|
What is targeted JDTA?
|
Performed on specific portions of a course because
-Insufficient course data for HPRR -Mishap occurs -as directed by higher authority |
|
What is unique about voluntary courses?
|
They can be (DOR) Dropped on Request
|
|
What two times are EAP's exercised?
|
Quarterly procedural walkthroughs
Fully exercised annually |
|
What impact do NRTCs have on advancement exam?
|
Used by the AEDC to obtain questions
|
|
Where are NRTCs located?
|
The NRTC website
|
|
What is DISCOVERER Plus?
|
Decision support tool that enables performance of ADHOC queries
-Format results and prepare them for presentation |
|
What is the purpose of AIM?
|
Computer based materials authoring tool
|
|
Approach AIM uses to maintain training materials
|
Integrated, performance based design, develop, and maintain both ILT and self paced learning content
|
|
How AIM ensures materials are developed and revised IAW specs and guidelines
|
Using Automated Conformance to Standards
|
|
What items are developed during the Analyze Phase of content development?
|
Analyze all available documents and data to determine what is needed to do a job
-The duties, tasks, skills organized on CTTL |
|
What items are developed during the design phase of content development?
|
Contains the TCCD
|
|
What does the TCCD include and express?
|
Expresses the content, structure, and essential management information for a course
Contains front matter, curriculum outline, and annexes |
|
What is OPNAV's role within training?
|
Provides policy supporting DON strategic goals
|
|
What is NETC's role within training?
|
Provides policy supporting NETC strategic goals
|
|
What are the Learning Centers' roles within training?
|
Monitor curriculum, instruction, and evaluation.
Ensure all classes have LSOs |
|
What is the LSOs responsibility within training?
|
Ensure quality training
|
|
What are the TEN sections of the testing plan?
|
Course Date |