• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/115

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

115 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)

What is the best location for leveling a crane?

Upperworkswhen

When determining the gross load the best method is?

Get an accurate load weight and add the rigging your

By order of hitch strength ( strongest to weakest)

Basket, vertical, choker

Only approved attachments or extra counterweights made by the manufacturer should be placed on the rear of the crane because: yeah

They could cause a backward stability problem with maximum boom angle

What is the first thing an operator should do before going under a low pipe rack?

Post a signal person to check clearance

What is the first thing an operator should do before going under a low pipe rack?

Post a signal person to check clearance

When working on out riggers, the only time they should be less than fully extended is when?

There is a load chart for this operation

What is the first thing an operator should do before going under a low pipe rack?

Post a signal person to check clearance

When working on out riggers, the only time they should be less than fully extended is when?

There is a load chart for this operation

When lifting loads from the water, the operator should be aware that?

The load will increase when you pick the load from the water

What is the first thing an operator should do before going under a low pipe rack?

Post a signal person to check clearance

When working on out riggers, the only time they should be less than fully extended is when?

There is a load chart for this operation

When lifting loads from the water, the operator should be aware that?

The load will increase when you pick the load from the water

What is required to be on a hydraulic crane in order for it to lift a man basket?

Boom length indicator

What is the first thing an operator should do before going under a low pipe rack?

Post a signal person to check clearance

When working on out riggers, the only time they should be less than fully extended is when?

There is a load chart for this operation

When lifting loads from the water, the operator should be aware that?

The load will increase when you pick the load from the water

What is required to be on a hydraulic crane in order for it to lift a man basket?

Boom length indicator

When working on rubber, cranes are rated at what percentage of tipping?

75%

What is the maximum Number of broken wires acceptable before replacement on a standing wire rope?

Two

Does not go through sheeve

What is the maximum Number of broken wires acceptable before replacement on a standing wire rope?

Two

Does not go through sheeve

What are most Jibs capacities based on?

Structural

What is the maximum Number of broken wires acceptable before replacement on a standing wire rope?

Two

Does not go through sheeve

What are most Jibs capacities based on?

Structural

On the majority of conventional cranes the power is transferred to the torque converter by a A:

Master clutch

What is the maximum Number of broken wires acceptable before replacement on a standing wire rope?

Two

Does not go through sheeve

What are most Jibs capacities based on?

Structural

On the majority of conventional cranes the power is transferred to the torque converter by a A:

Master clutch

During disassembly of a long boom, the hog lines are connected at the maximum can cantilever Point and the boom is slightly lifted ask the ground. Which pins Are to be removed next?

The bottom pins ahead of the cantilever Point

When using load / capacity charts, what does the term Jib angle to ground refer to?

Main boom angle minus the jibs offset

A truck crane, with outriggers properly set, is rated at what percentage of it’s tipping capacity?

85 %

On a truck crane with the outriggers extended and set, and tires touching the ground, the operator should refer to what load chart?

On rubber chart

When working over water with a man basket Are the people inside required to wear a belt or harness?

No harness or belt required

What is the maximum advisable Wind speed for crane operation?

30 Miles per hour

When working near powerlines, where should caution stickers be installed?

At Operator station and on the outside of the crane

At least three


One in cab and two on the outside

Jib backlash, how much is allowed?

Five degrees

Cranes must be leveled to within___________% Grade

1%

Reduce capacity to 50%

A frequent inspection is?

Daily to monthly

A periodic inspection is?

Monthly to Annually

Test loads shall not exceed_________ of manufactures load ratings?

110%

Test loads shall not exceed_________ of manufactures load ratings?

110%

Cranes idle for more than six months must have________ inspections performed.

Frequent and periodic

Test loads shall not exceed_________ of manufactures load ratings?

110%

Cranes idle for more than six months must have________ inspections performed.

Frequent and periodic

Cranes lifting personnel platforms must have an inspection performed every:

Day

Crane hooks must not be twisted in excess of:

10°

A crane hooks throat opening must not exceed:

15% of it's original size

10% wear

What is the jib offset?

Jim angle to the boom

After the crane has been checked out and before crane lift operations begin the crew should:

Have a pre-left meeting

After the crane has been checked out and before crane lift operations begin the crew should:

Have a pre-left meeting

According to ASME B30.5 personnel platform lifts should not be made with wind in excess of:

20 mph

After the crane has been checked out and before crane lift operations begin the crew should:

Have a pre-left meeting

According to ASME B30.5 personnel platform lifts should not be made with wind in excess of:

20 mph

When is it safe to work closer than the allowable distance from powerlines?

When utility company says lines are de-energized

During set up how do you determine machine clearances (counterweight, boom, outrigger)?

Measure for correct distances

When operating a crawler crane what is the most unstable allowable quadrant of operation?

Side

When operating a crawler crane what is the most unstable allowable quadrant of operation?

Side

When operating a truck crane what is the most unstable allowable quadrant of operation?

Side

What is not a good location for crane set up?

Above utilities

When should they tagline be used?

When rotation of load would be dangerous

When an operator arrives at the job site and the crane is already erected, how would the operator check the main and Auxiliary hoist brakes?

Lift the load off the ground and apply the brakes

When an operator arrives at the job site and the crane is already erected, how would the operator check the main and Auxiliary hoist brakes?

Lift the load off the ground and apply the brakes

What is the difference between and anti-two-block warning device and an anti-two-block prevention System?

Warning device only warns, but prevention system Will stop the operation

When an operator arrives at the job site and the crane is already erected, how would the operator check the main and Auxiliary hoist brakes?

Lift the load off the ground and apply the brakes

What is the difference between and anti-two-block warning device and an anti-two-block prevention System?

Warning device only warns, but prevention system Will stop the operation

Who gives the operator hand signals?

The person assigned prior to the lift

Why use mats or cribbing?

To reduce ground pressure

Why use mats or cribbing?

To reduce ground pressure

Tipping capacities of crawler cranes are based on what percentage of tipping?

75%

Why use mats or cribbing?

To reduce ground pressure

Tipping capacities of crawler cranes are based on what percentage of tipping?

75%

Should the load be applied when determining the proper boom angle?

Yes

When should the operator use the” run by the seat of the pants” technique?

Never

Load radius is the distance from the center of gravity of the suspended load tarp the?

Center of rotation

Load radius is the distance from the center of gravity of the suspended load tarp the?

Center of rotation

What is the primary reason for using a boom extension?

Increase height

Load radius is the distance from the center of gravity of the suspended load tarp the?

Center of rotation

What is the primary reason for using a boom extension?

Increase height

What is the minimum design factor required for a right regular lay main, boom or auxiliary hoist rope?

3.5

Load radius is the distance from the center of gravity of the suspended load tarp the?

Center of rotation

What is the primary reason for using a boom extension?

Increase height

What is the minimum design factor required for a right regular lay main, boom or auxiliary hoist rope?

3.5

When telescoping the boom section of an RT, which section should be telescope first?

All sections should be telescoped equally

Load radius is the distance from the center of gravity of the suspended load tarp the?

Center of rotation

What is the primary reason for using a boom extension?

Increase height

What is the minimum design factor required for a right regular lay main, boom or auxiliary hoist rope?

3.5

When telescoping the boom section of an RT, which section should be telescope first?

All sections should be telescoped equally

How does the operator determine if correct load chart is being used?

Matching serial number

Load radius is the distance from the center of gravity of the suspended load tarp the?

Center of rotation

What is the primary reason for using a boom extension?

Increase height

What is the minimum design factor required for a right regular lay main, boom or auxiliary hoist rope?

3.5

When telescoping the boom section of an RT, which section should be telescope first?

All sections should be telescoped equally

How does the operator determine if correct load chart is being used?

Matching serial number

Net capacity is equal to:

Gross capacity minus capacity deductions

If the SWL(safe working load) have a crane's wire rope is 10,000 lbs using one part, what is the SWL when using four parts?

40,000 lbs

One first arriving on the job site with a mobile crane, the Operator should first determine the condition of the:

Access roads

How does the operator verify the LMI’s boom length or load radius reading?

Actual measurements

If the Raiders capacity of the crane is above the solid line or was in the shaded areas or has an asterisk next to it, this means the capacity is based on:

Structural competence

All hazards and potential problems should be discovered during the:

Pre-lift site inspection

How many broken wires are required in one strand of one lay before a running wire rope must be taken out of service?

Three

In a range diagram, boom length and angle can be used to determine:

Load radius

When using cable or nylon spreaders it is important to remember:

The lower the spreader angle the greater the tension

Backwards stability of a crane is tested with:

Basic boom at maximum angle with no load

Backwards stability of a crane is tested with:

Basic boom at maximum angle with no load

If not listed in the load/ capacity charts for a hydraulic crane and you Are in between boom lengths , you should:

Use the next longer length

When I spinning load presents danger, the Operator should:

Use a tagline

When I spinning load presents danger, the Operator should:

Use a tagline

The Jib capacity is 8 tons and the ball weighs 900 pounds. What is the heaviest load that can be lifted safely?

15,900

Parts of line means:

The number of lines running through the load Block

If a jib is erected but not being used, it is treated as a deduction from the crane:

Gross capacity

When testing a man basket how long must the test pick be maintained?

Five minutes

Seatbelts shall be provided for which cranes?ANSI

Cherry pickers ( ANSI) 5-1.8(e)

Power is transferred to the swing through a:

Pinion gear

LMI’s shall be installed on cranes with a lifting capacities of :

3 ton and above

When lifting personnel the cranes hook must be the type that:

Can be closed and locked