Beam Crane Case Study

Great Essays
This chapter provides associate degree introduction the beam crane project, which has the summary, main objectives, scopes and an outline of the project.
At the current time engineering problems are getting more complicated and conventional methods have become unable to give the satisfying results that the scientists and engineers desire in solving problems or designs there for a new approach is needed hence, Computational mechanics has become fundamentally important part of computational science and engineering, concerned with the use of computational approaches to characterize, predict and simulate physical events and engineering systems governed by the laws of mechanics as it uses computers and digital systems software to help engineers
…show more content…
The numerous characteristic of bridge crane is all the motions are performed at the same time at relative high speed.

1.2 Problem statement

Recent years had shown a pressing need to improve the design of Overhead Traveling Cranes Girders due to its large usage in the manufacturing field. Crane girders are subject to types of loading carry high factor of safety. Design improvement will give competitive edge. Another factor is cost; cost is to be reduced by any means thus inefficient or improper design which will lead to high costs is avoided.

1.3 Objectives To perform failure analysis of traveling crane girder configuration for multiple load cases To optimize girder models for improve strength and reduce cost
1.4 Scope of study
This study going to focus on improving the strength of the girder by applying stiffeners or ribs to the girder which is more economical than increase the cross-section area.
The ribs will be applied to smaller cross-section than the original one. Thus. The material will be calculated by the volume of the
…show more content…
Modern cranes sometimes use combustion engines or electrical motors and hydraulic systems to supply a far larger lifting capability than was antecedently doable, though manual cranes are still utilized wherever the supply of power would be uneconomical. Cranes exist in a massive kind of forms every tailored to a selected use. Sizes vary from the littlest jib cranes, used within workshops, to the tallest tower cranes, used for constructing high buildings, and therefore the largest floating cranes, accustomed build oil rigs and salvage sunken ships. (Nethercot, D. A.,et al , 1989

Related Documents

  • Improved Essays

    The best way to make a bridge is to use the triangle shaped method because it is the strongest…

    • 452 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    Case Study: Outlaw ATV

    • 388 Words
    • 2 Pages

    Who are the best producers of Outlaw ATV tires? In my opinion, the best producer of Outlaw ATV tires is High Lifter company Who is High Lifter Company? The Company has been producing and marketing unique, aftermarket accessories for utility, ATVs, UTVs and RUVs for 4 wheel drive since 1996.…

    • 388 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    Narrow Bridge Case Study

    • 1063 Words
    • 5 Pages

    A good number of trials had been carried to test the chains of the suspension bridge while noting down all the yield and possible failure loads by Thomas Telford. Too much time was taken on testing of the chains that little attention was paid to how the light and flexible roadway might react during strong and fats winds. A large number of remedial measures were to be applied which included tying down cables that snapped soon after installation, bumpers and inclined stay cables that all seemed to bare no fruits. The oscillations it received in relatively light winds was attributed as one of the major causes of its collapse. The oscillations were due to the wind vortex shedding in the bridge deck.…

    • 1063 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    Catapult Physics

    • 766 Words
    • 4 Pages

    Problem: The problem at hand is a plane has crashed over the Pacific Ocean. Everyone on the plane survives, but now half of the passengers are stranded on an island. There is more than enough food and supplies to last on the island while help is awaited, which can take weeks to months. However, the other half of the passengers are stuck on an online across shark infested waters. The passengers on that island have no access to any food or supplies.…

    • 766 Words
    • 4 Pages
    Improved Essays
  • Decent Essays

    Grant Alexander Pd#6 11 November 2016 Trebuchet Engineering A trebuchet is a machine used in medieval siege warfare for hurling large stones or other missiles. How this machine works is not to complex but is also fascinating.…

    • 542 Words
    • 3 Pages
    Decent Essays
  • Improved Essays

    The 900 tons of stainless steel have foundations that extend 60 feet. The Gateway Arch can withstand earthquakes and is designed to sway 18 inches in 150 mile per hour winds, which, according to the National Hurricane Center, is a level four hurricane. To get the pieces of the arch up a normal crane couldn’t be used. As a result, the Creeper Derrick was created. The Creeper Derrick was a tiltable…

    • 873 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Design also minimized the use of steel. The design concept allows only five to eight inches of sway in a 60mph wind. It has been tested to withstand winds of 132 miles per hour. The building is shaped like a wedge, creating the illusion that it is even taller. This was drafted to balance the need for extra parking…

    • 410 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    After making calculations, LeMessurier found that strain on the building’s joints were increased by 40% and then 160% after a strain multiplier was accounted…

    • 722 Words
    • 3 Pages
    Improved Essays
  • Great Essays

    500-lb Bench… And You Still Punch Like a Girl? By Mark Ginther Big Bench Press = Heavy Hands?…

    • 2234 Words
    • 9 Pages
    Great Essays
  • Improved Essays

    Mobile Crane Case Study

    • 816 Words
    • 4 Pages

    The training of the mobile crane operator is not enough. In Hong Kong, there are many training centres such as Construction Industry Council (CIC) and Construction Machinery Technical Training Centre. The duration of training courses provided for different mobile crane is varied. For Crawler-mounted Mobile Crane and Wheeled Telescopic Mobile Crane, the training period of non-experience operator is much longer than Truck-mounted Crane. When the operator has one year experience, the duration of the retraining time is only 3 days same among three types of mobile crane.…

    • 816 Words
    • 4 Pages
    Improved Essays
  • Superior Essays

    Golden Gate Bridge

    • 1862 Words
    • 8 Pages

    Designing a suspension bridge is simple. It takes advantage of several techniques to distribute the weight of the bridge evenly. This type of bridge can also span great distances over the ground and water. But with that great length comes greater engineering struggles because of many external and internal forces [3].…

    • 1862 Words
    • 8 Pages
    Superior Essays
  • Improved Essays

    Robotic System Case Study

    • 1885 Words
    • 8 Pages

    Open-Source Educational Robotic System Problem Statement: Robotic systems are recently being used broadly in educational college courses due to the rapid increase of computer jobs throughout the world. Many students with a Robotic background wish to take up courses that involve more hands-on experience. This project not only helps the students learn about programming and Science, Technology, Engineering and Mathematics (STEM) related concepts but it also gives faculty the opportunity to emphasize the importance of teamwork in the framework of solving problems. Providing adequate power to the robot, and mounting components such as a computing board, USB hub, and battery on the system requires extensive engineering and design.…

    • 1885 Words
    • 8 Pages
    Improved Essays
  • Great Essays

    Factors causing the occurrence of damage to the surface or parts of the bridge. ii. Maintenance works which are often carried out in maintenance management. iii. Case studies in Jambatan Kedua Sdn.…

    • 1086 Words
    • 5 Pages
    Great Essays
  • Superior Essays

    ABSTRACT Many researchers have recommended different strategies for sustainable structures to exploit natural resources more efficiently and moderate the environmental impact of on-site construction. This research presents a creative, sustainable construction approach through an assembly system for eco-friendly materials. Wood is a natural material that is vastly available and easily reproduced in temperate climate zones. Wooden structures offer the opportunity to provide sustainable building through their eco-friendly features and life cycle recycling. Wood has a very positive carbon footprint, and heavy timber structures postpone releasing stored carbon within wood for decades or longer.…

    • 1064 Words
    • 4 Pages
    Superior Essays
  • Improved Essays

    And Under pure shear stress condition, Volumetric S.E/vol. = 0 From equation (8) T.S.E/vol. =…

    • 1300 Words
    • 6 Pages
    Improved Essays