• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/14

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

14 Cards in this Set

  • Front
  • Back

List hazards and op considerations in high rise procedure.

Metabolic heat stress.


Delays.


Fixed installations unavailable.


Comms difficulties.


Anti social behaviour.


Fire growth and smoke travel.


Layout of buildings.


Wind effects.


Falling objects.


Evacuation of occupants.

Describe phased evacuation.

Building evacuated in stages. Starting with fire floor and one floor above.

Building over 18m in height must provide provisions for firefighting operations. Dry riser etc. True or false.

True.

Buildings in excess of 60m require a wet system. 50 m as of 2006. True or false.

True.

Describe what pre planning must ne done in HR procedure.

Check ORD and EPIP on route to the incident.

Describe command function.

IC remain at ground level and gather information and use any control room resources. Implement FIB and high rise incident record template.

Securing water supply.

Set into dry riser on order of the IC. Charged to 10 bar. Twinned 70mm.

How man lpm DRM have to deliver?

1500 lpm

Where is the stop valve located in high rise building with sprinkler systems? When should it be turned off?

Ground floor, depending on building layout. Should only be activated under instruction from the IC.

The bridgehead should be located 2 floors below the incident. Fire sector commamder will take a minum of how many firefighters to the bridgehead?

3 firefighters. Two BA wearers and an ECO.

What equipment should be taoen to the bridgehead?

2 lengths of 45mm


IEC pack


Long line


Breaking in gear


ECB


TIC


FIRE Bag


FIB


Floor plans

Wgen can highrise procedure implemented message be sent?

Bridgehead location risk assesed.


Access and agress from bridgehead secured.


Bridgehead established woth two charged jets deployed.

BA teaks charged branch should be set in how many floors below the fire?

1 floor below or nearest available below. Controlled divibg breech used.

What floor does the safety team plug their jet in?

On the fire floor to protect the egress of the firefighting team. A third jet, if required can go into the controlled breech 1 floor below fore floor.