• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/4

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

4 Cards in this Set

  • Front
  • Back
Aggregate Planning
Medium-Range Capacity Planning, Covering 2-18 Months
Aggregate Planning:
Long-Rage
Long-Term Capacity, Location, Layout, Product Design, and Work System Design
Aggregate Planning:
Intermediate Plans
Levels of: Employment, Output, Finished-Goods Inventories, Subcontracting, and Backordering.
Aggregate Planning:
Short-Range Plans
Detailed Plans: Machine Loading, Job Assignments, Job Sequencing, Production Lot Size, Order Quantities, and Work Schedules.