• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/9

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

9 Cards in this Set

  • Front
  • Back

Criteria for an HMR?

- Hazardous Material Report


- generally cover material deficiencies could cause death or injury to personal or damage to or loss of A/C


- TFOA

Criteria for CAT 1 & 2 PQDR?

- Product Quality Deficiency Report / cover product deficiencies attributable to the supplier, contractor, or rework facility


- Cat 1 Q/deficiency which may cause death, injury, or result in production line stoppage


- submitted within 24 hours


- Cat 2 non-safety related reporting


- submitted within 5 days

Criteria for EI?

- Engineering Investigations


- apply to all A/C and weapon system, equipment, components, related SE, special tools, software, fluids, and materials used in equipment operations


- lighting strike

Criteria for CAT 1 & 2 TPDR?

- Technical Publication Deficiency Report


- submit to address safety hazards and routine deficiencies to JDRS


- CAT 1 cause injury, death, or affects mission capability


- CAT 2 hold back mission and maint over 8 hours

Criteria for an ADR?

- Acceptance Deficiency Report


- identify defects in newly manufactured, modified, or reworked A/C to ensure better quality maintenance and rework procedures

QA audits and monitors?

Work center - semi annually


Program - annually


Special - QAO deems necessary

TD?

- technical detectives, verify no TD cut against that item, quality components, proper paper work, correct components


- usually one time inspection of a component or equipment


- found in 500c


- repairable parts with RFI TAG


-

CTPL?

- central technical publication library


- all updated manuals and pubs

MESM?

- mission essential subsystem matrix


- list of equipment system or subsystem that must be on and in working condition before AC considered mission ready


- eoc codes Z down, code will tell you in ooma how mission capability is affected