• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/19

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

19 Cards in this Set

  • Front
  • Back

Assumption log

An assumption is something that is believed to be true or false, but it has not yet been proven to be true or false. Assumptions that prove wrong can become risks for the project. All identified project assumptions are recorded in the assumption log for testing and analysis, and the outcomes are recorded.


Benefit/cost ratio (BCR) models

This is an example of a benefits comparison model. It examines the benefit-to-cost ratio.

Change control board (CCB)

A committee that evaluates the worthiness of a proposed change and either approves or rejects the proposed change.

Change control system (CCS)

This communicates the process for controlling changes to the project deliverables. This system works with the configuration management system and seeks to control and document proposals to change the project's product.

Change log

All changes that enter into a project are recorded in this. The characteristics of the change, such as the time, cost, risk, and scope details, are also recorded.

Change management plan

This plan details the project procedures for entertaining change requests: how change requests are managed, documented, approved, or declined.


Closure processes

This final process group of the project mgmt life cycle is responsible for closing the project phase or project. This is where project documentation is archived and project contracts are also closed.

Communications mgmt plan

This plan defines who will get what info, how they will receive it, and in what modality the communication will take place.

Configuration identification

This includes the labeling of the components, how changes are made to the product, and the accountability of the changes.

Configuration mgmt plan

This plan is an input to the control scope process. It defines how changes to the features and functions of the project deliverable, the product scope, may enter the project.

Configuration mgmt system

This system defines how stakeholders are allowed to submit change requests, the conditions for approving a change request, and how approved change requests are validated in the project scope. Configuration mgmt also documents the characteristics and functions of the project's products and any changes to a product's characteristics.

Configuration status accounting

The organization of the product materials, details, and prior product documentation.

Configuration verification and auditing

The scope verification and completeness auditing of project or phase deliverables to ensure that they are in alignment with the project plan.

Contract closure

The formal verification of the contract completeness by the vendor and the performing organization.

Cost baseline

This is the aggregated costs of all of the work packages within the work breakdown structure (WBS)


Cost mgmt plan

This plan details how the project costs will be planned for, estimated, budgeted, and then monitored and controlled.

Enterprise environmental factors

The culture, structure, standards, regulations, organizational logistics, and other organizational characteristics that influence how a project operates.

Future value

A benefit comparison model to determine a future value of money. The formula to calculate future value is FV=PV (1+I)^n, where PV is present value, I is the given interest rate, and n is the number of periods.

Human resource plan

This plan defines how project team members will be brought onto the project team, managed, and released from the project team. It also defines team training, safety issues, roles and responsibilities, and how the project's reward and recognition system will operate. Ch. 9 defines this in detail.