• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/37

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

37 Cards in this Set

  • Front
  • Back

Under what 6 inspection concepts are AF aircraft inspected?

1. Periodic 2. Phased 3. Isochronal 4. Aerospace vehicle manufacturer 5. Programmed depot maintenance 6. Contingency decks

How long is a pre flight inspection valid for on a locally flying aircraft?

24, 48, or 72 hours (If 72 hours and aircraft hasn't flown in 48 consecutive hours another inspection is required)

Which inspection is accomplished just prior to takeoff?

End of runway

What type of inspection would you perform on an aircraft that lands for refueling and plans to continue its flight immediately?

Thru Flight

When is a BPO inspection completed?

After the last flight of a specified flying period

What type of inspection determines if the aircraft is suitable for another flight?

BPO

When is an HPO inspection performed?

After a specified number of flying hours have accumulated

Which inspection does the HPO augment

BPO which is usually done at the same time

A periodic inspection includes the recurring inspection items for what 2 inspections?

HPO or BPO

What's the main objective of the phase inspection?

To reduce out of commission time for any given aircraft.

How many inspections are included in the ISO inspection concept and what are they?

1. Major 2. Minor 3. Home station checks

When are major, minor, and home station checks due?

Major- based on the number of calendar dates from the start date of the last major inspection


Minor- at completion of mission during which a specified number of calendar days accrued


HSC- same as major and minor

What does the minor inspection consist of?

Checking certain components and systems to ensure that no condition exist that could result in failure before the next major inspection

Describe the HSC

Combo inspection of former HPO and BPO items

If an aircraft is idle for more than 30 days, what type of inspection must be performed?

Calendar inspection

When is an acceptance inspection performed?

When an aircraft is newly assigned

3 occasions when a special inspection is required

1. After a certain number of flying hours 2. After a specific calendar time. 3. After a specific or unusual condition occurs

What 2 conditions or occasions may require installation of the replacement items listed in -6 TO replacement schedule?

1. After a specific interval of time 2. Following the occurrence of a specific condition

List the 4 basic requirements for adequate inspection facilities

1. Adequate heat 2. Illumination 3. Ventilation 4. Communication

What items should each inspection team have to perform their inspection efficiently?

1. Applicable -6 inspection WCs, TOs, and work unit code manuals 2. Adequate hand tools and special tools. 3. Bench stock and petroleum products for servicing 4. A card bin for controlling inspection WCs.

What's the primary purpose for using maintenance symbols on aircraft forms?

To make important notations instantly apparent

Hie should a symbol be entered in the symbol block for maintenance documents?

In red from corner to corner

Under what circumstances would you enter a red X in the symbol block of maintenance documents?

When equipment is unsafe to use

Which red maintenance symbol should be used to indicate that the condition of the equipment is unknown?

Red dash

What type of maintenance document entries do not require the entry of a symbol in the symbol block?

Informational notes that don't affect flight safety or flying efficiency

What types of discrepancy do not require documentation on AFTO form 781 A?

Discrepancies resulting from battle damage

What symbols can be transferred to 781 K?

Diagonal and dash

What symbol can be transferred to the 781 K?

Diagonal and dash

What's the procedure for documenting a warning note in the discrepancy block of AFTO form 781 A?

The word NOTE in red followed by the remarks in red.

When the condition requiring a warning note in the DISCREPANCY block no longer applies, what action is taken to close it out?

Line through the note

In block 13 of AFTO form 781H, how do you document fuel that is removed from the aircraft?

In red with a - in front

On AFTO form 781H, who enters their name in block 14?

The person who performed or supervises

Prior to using an equipment item, on what part of the 244 do you document the inspection of an item?

Part 2 non scheduled inspection

What part of the 244 is used to document overdue special inspections?

Part 5 industrial/ support equipment record

As a minimum, what actions must be annotated on the 95?

Install/removal dates and component accumulated hours, reason for removal and maintenance performed

What block of the 95 do you annotate the manufacturer name?

Block 2

What documents stay with the aircraft to depot, contractor repair or when it's transferred?

427, 781A, and 781 K