• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/8

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

8 Cards in this Set

  • Front
  • Back
The internal heirachy on a commercial construction job site is project manager, superintendent(s), ____________, skilled laborers (tradesmen) and unskilled laborers.
foremen
The project delivery method that requires the most coordination and responsibility on behalf of the owner is:
Design-bid-build Design-negotiate-build
CM as adviser CM at risk
Design-build
CM as adviser
Which of the following delivery methods often starts with a guaranteed maximum price (GMP) and later switches to lump sum?
Design-bid-build Design-negotiate-build
CM as adviser CM at risk
Design-build
CM at risk
According to the Penn State and UK study (The Forum), the approximate delivery time savings enjoyed by design-build over design-bid-build is:
10%, 20%, 30%, 40%, 50%
30%
A "_____ developer" is a real estate developer who produces a turnkey project and receives a fixed payment.
Fee
Which of the following construction contract types requires that the type of work involved is extremely well understood and is non-variable?
Cost reimbursable Fixed price
Unit rate Stipulated
Lump sum Guaranteed maximum price
Cost plus fee
Unit rate
The value of bid bonds are commonly equal to the full contract amount.
TRUE OR FALSE
FALSE
Builder's risk (or contract works) insurance covers...
Damage to nearby properties (real or personal)
Theft of contractor's materials or tools
Costs related to physical injuries to construction workers
Damage to the building under construction
Damage to the building under construction