• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/49

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

49 Cards in this Set

  • Front
  • Back

What is used to report completion ( or partial completion ) of alterations, Maintenance actions that resulted in configuration Change and to correct discrepancies and errors in the configuration files?

OPNAV 4790/CK

Equipment is placed in IEM status?

The equipment will not be operated for 7 days or more but fully operational

Which form is used for documenting installation of new equipment?

OPNAV Form 4790/CK

The following operational PMS appears on your Work Center's Quarterly Schedule: A-1 (#Q-1). The Maintenance person was able to complete A-1 MRC, but Q-1 must be rescheduled due to corrective maintenance. The A-1 may be X'd off ab complete but the Q-1 must be rescheduled. True or False?

False

The acronym PAR stands for what?

Periodic Accomplishment Rate

When entering a work candidate, formerly a 2-kilo In OMMS - NG what Minimum information is required?

Item blocks with a red check by them on each Tab of a work candidate

To check the status of parts ordered for your work center, you should:

Open your work candidate and check the status on the parts tab

The ship's 3-M system is designed to provide for managing maintenance and maintenance support to achieve_____________equipment operational readiness.

Maximum

PMS Schedules are produced using what computer program?

SKED 3.2

Who is required to review and sign the 13 Week Report (Accantability log)?

Workcenter Supervisor and Division officer

From the list below, the only modifications which shipboard personnel may NOT make to MRC are the following

WCS may line out any items in the procedure block

What Information goes in the Work Candidate Summary Block in OMMS - NG?

A brief discription of the problem

A Work Center Supervisor can lend OMMS-NG permissions to someone else without giving them their LAN password. True or False?

True

The ship's 3-M system is designed to provide for managing maintenance and maintenance support to achieve_____________equipment operational readiness.

Maximum

PMS Schedules are produced using what computer program?

SKED 3.2

Who is required to review and sign the 13 Week Report (Accantability log)?

Workcenter Supervisor and Division officer

What Infromation goes in the Work Candidate Summary Block in OMMS - NG?

A brief discription of the problem

What are the 5 Steps to ORM?

Identify Hazards


Access Hazards


Make Risk Decisions


Implement Controls


Supervise

What does the acronym TORS Stand for ?

Tag out record sheet

During the tag-out procedure, proper component Identification (ie Valve label) is required?

True

What are the responsibilities of the person attaching the Tag?

1.Verify the breaker/valve is in the proper Tag Out position


2. Verify Danger/ Caution Tag matches equipment.


3.Properly Hang Tag

Who maintains the 13 Week Report(Accountability log )?

WCS

Who advises the DIVO/ LCPO on the status of the safety program within the Division?

Safety Petty Officer

Where would a WCS look to find maintenance checks required prior to entering PORT/ DPIA / CNO availability?

Situational / R - Check Report

Amplifying information for additional PPE requirements not listed on the MRC can be found in What reference?

NSTM 670 (HMUG)

The Division LCPO will provide the Division officer with a weekly status of what?

3-M Self assessment program PMS accomplishment and non-accomplishment

The Division LCPO reviews and initials which live outs?

LOEP and MIP

SKED 3.2 allows supervisors to manually reschedule checks outside of periodicity for purposes of maintaining accountability and documentation

False

A persistent event that can be tracked over duration of time (in days) is called what

State

A metered Event is based on

The current value of a measurement in relation to the value at the time of last accomplishment

What is the Division officer's Role?

Shares the same view in SKED 3:2 as the LCPO.Conducts Spot Checks Signs FBRs

What does the MY Tasks view serve as?

Your personal dashboard for the maintenance tasks awaiting actions within a given time frame by default it includes maintenance tasks due within the next two weeks

Which would you submit a Feedback Report from?

FBR Tab and Work center View

What must be clearly defined and organised before organizing Maintenance Groups in SKED 3:2 ?

Maintenance Items

How many Maintenance Groups should be created at one time In SKED 3:2?

One

Do Maintenance Groups affect your schedule? If so why?

No

How is the Icon legend accessed In SKED 3.2?

F12

A State event is a toggle that is either on or off that corresponds to what?

Current State of the ship, equipment or Status

What are ORM control options?

Options that either avoid the hazard or reduce its risk to an acceptable level

What is the term for a task the is to be accomplished only when a specified knows event or set of circumstances occur?

Situational Requirement

What are ORM control options?

Options that either avoid the hazard or reduce its risk to an acceptable level

Where do yo determine your user role and permissions in SKED3:2

On the view tab bar,click MYTASKS. Your role Is located in the blue welcome pane

What actions must be taken when when it is determined that there is a need for PMS equipment coverage covered by PMS?

Notify NAVSEALOGEN Det Norfolk/San Diego by PMS TFBR

If a ship or TYCOM considers there is a need for PMS equipment coverage and NAVSEALOGCEN Det Norfolk /San Diego has been notified by PMS TFBR of the need for PMS coverage which is not guidance used with locally developed MIP and MRC procedures?

MRC procedures may be based off of Ships force Subject matter expert experience

Before adding Maintenance Items you will need to organize them Into like items In SKED 3.2. Where can you look to identify the Maintenance items related to a MIP?

OMMS Ship's equipment configuration list

Which part of the ORM process should be alloted the larger portion of available time due to its multiplier effect?

Identify the Hazard

What is the purpose of the command NAVOSH program?

To achive a safe and healthful working environment

What is a hazard?

Any condition that may have a negative impact on mission accomplished, causes properly damage, injury or death

What is the foundation of the entire Risk Management process?

Identify Hazards