- Front
- Back
What is used to report completion ( or partial completion ) of alterations, Maintenance actions that resulted in configuration Change and to correct discrepancies and errors in the configuration files? |
OPNAV 4790/CK |
|
Equipment is placed in IEM status? |
The equipment will not be operated for 7 days or more but fully operational |
|
Which form is used for documenting installation of new equipment? |
OPNAV Form 4790/CK |
|
The following operational PMS appears on your Work Center's Quarterly Schedule: A-1 (#Q-1). The Maintenance person was able to complete A-1 MRC, but Q-1 must be rescheduled due to corrective maintenance. The A-1 may be X'd off ab complete but the Q-1 must be rescheduled. True or False? |
False |
|
The acronym PAR stands for what? |
Periodic Accomplishment Rate |
|
When entering a work candidate, formerly a 2-kilo In OMMS - NG what Minimum information is required? |
Item blocks with a red check by them on each Tab of a work candidate |
|
To check the status of parts ordered for your work center, you should: |
Open your work candidate and check the status on the parts tab |
|
The ship's 3-M system is designed to provide for managing maintenance and maintenance support to achieve_____________equipment operational readiness. |
Maximum |
|
PMS Schedules are produced using what computer program? |
SKED 3.2 |
|
Who is required to review and sign the 13 Week Report (Accantability log)? |
Workcenter Supervisor and Division officer |
|
From the list below, the only modifications which shipboard personnel may NOT make to MRC are the following |
WCS may line out any items in the procedure block |
|
What Information goes in the Work Candidate Summary Block in OMMS - NG? |
A brief discription of the problem |
|
A Work Center Supervisor can lend OMMS-NG permissions to someone else without giving them their LAN password. True or False? |
True |
|
The ship's 3-M system is designed to provide for managing maintenance and maintenance support to achieve_____________equipment operational readiness. |
Maximum |
|
PMS Schedules are produced using what computer program? |
SKED 3.2 |
|
Who is required to review and sign the 13 Week Report (Accantability log)? |
Workcenter Supervisor and Division officer |
|
What Infromation goes in the Work Candidate Summary Block in OMMS - NG? |
A brief discription of the problem |
|
What are the 5 Steps to ORM? |
Identify Hazards Access Hazards Make Risk Decisions Implement Controls Supervise |
|
What does the acronym TORS Stand for ? |
Tag out record sheet |
|
During the tag-out procedure, proper component Identification (ie Valve label) is required? |
True |
|
What are the responsibilities of the person attaching the Tag? |
1.Verify the breaker/valve is in the proper Tag Out position 2. Verify Danger/ Caution Tag matches equipment. 3.Properly Hang Tag |
|
Who maintains the 13 Week Report(Accountability log )? |
WCS |
|
Who advises the DIVO/ LCPO on the status of the safety program within the Division? |
Safety Petty Officer |
|
Where would a WCS look to find maintenance checks required prior to entering PORT/ DPIA / CNO availability? |
Situational / R - Check Report |
|
Amplifying information for additional PPE requirements not listed on the MRC can be found in What reference? |
NSTM 670 (HMUG) |
|
The Division LCPO will provide the Division officer with a weekly status of what? |
3-M Self assessment program PMS accomplishment and non-accomplishment |
|
The Division LCPO reviews and initials which live outs? |
LOEP and MIP |
|
SKED 3.2 allows supervisors to manually reschedule checks outside of periodicity for purposes of maintaining accountability and documentation |
False |
|
A persistent event that can be tracked over duration of time (in days) is called what |
State |
|
A metered Event is based on |
The current value of a measurement in relation to the value at the time of last accomplishment |
|
What is the Division officer's Role? |
Shares the same view in SKED 3:2 as the LCPO.Conducts Spot Checks Signs FBRs |
|
What does the MY Tasks view serve as? |
Your personal dashboard for the maintenance tasks awaiting actions within a given time frame by default it includes maintenance tasks due within the next two weeks |
|
Which would you submit a Feedback Report from? |
FBR Tab and Work center View |
|
What must be clearly defined and organised before organizing Maintenance Groups in SKED 3:2 ? |
Maintenance Items |
|
How many Maintenance Groups should be created at one time In SKED 3:2? |
One |
|
Do Maintenance Groups affect your schedule? If so why? |
No |
|
How is the Icon legend accessed In SKED 3.2? |
F12 |
|
A State event is a toggle that is either on or off that corresponds to what? |
Current State of the ship, equipment or Status |
|
What are ORM control options? |
Options that either avoid the hazard or reduce its risk to an acceptable level |
|
What is the term for a task the is to be accomplished only when a specified knows event or set of circumstances occur? |
Situational Requirement |
|
What are ORM control options? |
Options that either avoid the hazard or reduce its risk to an acceptable level |
|
Where do yo determine your user role and permissions in SKED3:2 |
On the view tab bar,click MYTASKS. Your role Is located in the blue welcome pane |
|
What actions must be taken when when it is determined that there is a need for PMS equipment coverage covered by PMS? |
Notify NAVSEALOGEN Det Norfolk/San Diego by PMS TFBR |
|
If a ship or TYCOM considers there is a need for PMS equipment coverage and NAVSEALOGCEN Det Norfolk /San Diego has been notified by PMS TFBR of the need for PMS coverage which is not guidance used with locally developed MIP and MRC procedures? |
MRC procedures may be based off of Ships force Subject matter expert experience |
|
Before adding Maintenance Items you will need to organize them Into like items In SKED 3.2. Where can you look to identify the Maintenance items related to a MIP? |
OMMS Ship's equipment configuration list |
|
Which part of the ORM process should be alloted the larger portion of available time due to its multiplier effect? |
Identify the Hazard |
|
What is the purpose of the command NAVOSH program? |
To achive a safe and healthful working environment |
|
What is a hazard? |
Any condition that may have a negative impact on mission accomplished, causes properly damage, injury or death |
|
What is the foundation of the entire Risk Management process? |
Identify Hazards |