Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/34

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

34 Cards in this Set

  • Front
  • Back

A floor drain is permitted to be connected to a storm water waste system, provided that it’s located where it can only receive ______________

Clear water water waste or storm water

Minimum length of horizontal offset in a soil or waste stack that receives more that 30FU or discharge from 2 or more stories?

1.5m

Where a vent pipe is connected into the suds pressure zone , no other vent pipe shall be connected to said vent pipe within _____

The height of the suds pressure zone.

No other fixture may connect to a lead bend or stub that serves a ______

Water closet.

An overflow from a rainwater tank shall not be directly connected to a ______

Drainage system

Equipment discharging waste with organic solids shall not be located _________ of a__________.

Upstream


Grease interceptor

What floor drains or fixtures are not permitted to be connected to the drainage system?

Oil transformer vaults


High voltage rooms


Where flammable,dangers or toxic chemicals are stored

To what temperature must waste be cooled to before it is discharged into the drainage system?

170•F, 75•C

Fixtures that discharge fats, oils and grease in a public kitchen must discharge through a ___________

Grease interceptor

An interceptor with an effective water seal of not less than ______ is permitted to serve as a trap.

38mm

When storm water is connected to a combined sewer, a _______ shall be installed between any opening in the system, unless the opening is the upper end of a leader that terminates _____________ and ___________.

Trap


At a roof only used for weather protection


Not less than 1m above or 3.5m away from any air inlet, openable window or door.

Where freezing could cause storm drainage to freeze a _______ with a _______ shall be installed in a heated location .

Trap


Clean out

Sewage sump tanks that don’t operate automatically must have the capacity to sufficiently hold for_______ of accumulation of liquid.

24 hrs

Maximum _______ change in direction on a horizontal drain between _______

135•


Clean outs

the discharge from a sewage sump pump shall be equipped with a _________, _________ and a ___________ installed in that sequence in the direction of discharge .

Union


Check valve


Shut off

Nominally Horizontal piping that is inside a building shall be braced to prevent __________ and _______ and to control the effects of _______

Swaying and buckling


Thrust

ABS or PVC plastic piping shall be supported every ____m or ___feet and at the end of _______ or _____ and at changes in direction or elevation.

1.2m


4 feet


Branches or fixture drains

Cast Iron Pipe shall be supported every _____ m or _____” and at or adjacent to each ____ or _____.

3m


10feet


hub or Joint

Where a fixture or device is ____________, the connections shall be made by terminating the fixture drain above the ________________ of a directly connected fixture to form an __________

Indirectly connected


Flood level rim


Air Break

Size of an air break?

1 pipe diameter but not less than 1” or 25mm

Nominally Horizontal piping underground shall be supported in a base that is ______ and ______ u see the whole pipe.

Firm and continuous

Under ground pipes shall be back filled and tamped to a height of __________over the top of the pipe.

300mm or 12”

What

Risk of damage to the building


Condensation

Except for acid traps , every trap shall have a seal depth of not less than _____mm or ________.

38mm


11/2”

What are the two provisions that must be met to allow one trap to serve a group of floor or shower drains , a group of washing machines or a group of laboratory sinks?

1. Same room


2. Cannot receive food or organic waste.

ABS or PVC plastic piping shall be supported every ____m or ___feet and at the end of _______ or _____ and at changes in direction or elevation.

1.5m


4 feet


Branches or fixture drains

Keep

Going

Steel pipe 6 inches in diameter or greater shall be supported every ____

3.75 m

All steel pipe with a diameter 5” or less shall be supported every ______feet or _____m

2.5 m


8ft

Nominally Horizontal piping underground shall be supported in a base that is ______ and ______ throughout the whole pipe.

Firm and continuous

Rods supporting hangers for pipe over 4” in size must be ______ in diameter

13mm or 1/2”

piping used as an internal leader which may be subject to condensation shall be installed in a manner that limits the _____________ due to ________.

Risk of damage to the building


Condensation

Vertical piping must be supported at its ______ and at the floor level of _______ by rests ( riser clamps ) each which can bear the weight of the ______ that is between bit and the rest above it.

Base


Alternate stories


Pipe

The maximum spacing of vertical supports shall be ______

7.5 m