19 Cards in this Set
- Front
- Back
if instrument error is small and consistent, a_________ label may be used. And operator may continue to use the instrument
|
out of calibration
|
|
When a _______ label is used, the instrument must not be used for plant or equipment operation
|
out of commission
|
|
If cutter is assigned to non-cg facility for repairs, who follows the tag out system?
|
both parties (cg and contractors)
|
|
Authorizing Officer
|
-authority to sign tags/labels to be issued or cleared
-COs designate AOs in writing |
|
Caution Tag
|
-Yellow
-Temporary special instructions when operating equipment |
|
Danger Tag
|
-Red color
-Prohibits operation of equipment -Laminated danger tags authorized for repeated use on designated PMS operations |
|
Out of Calibration Label
|
-Orange color
-instruments that will not accurately indicate parameters |
|
Out of Commision Labels
|
-Red color
-instruments will not indicate accurate parameters due to defect |
|
Instrument Log
|
labels associated with Out of Commission and Out of Calibration
|
|
Organizing Tag Out Labels
|
-in a sequencing serial number
-O for operations -E for engineering -ex- E-002 ir O-001 -more than one tag...E-001-1 |
|
When filling Danger/Caution tagout sheet...
|
either Danger or Caution to be circled and the other lined out
|
|
Do not attached tags to.....
|
breaker covers or valve caps, they may be removed
|
|
After tag is attached, a second person shall....
|
-Verify the tag is correctly attached to proper system
- Sign the tag and initial tagout sheet -Must have approval of AO -Person may be Repair Activity Memeber |
|
No tags can be cleared without...
|
the AOs approval
|
|
The person attaching the tag shall be the only person...
|
removing the tag
|
|
Cleared tags shall be returned to....
|
the AO, which he will verify and then destroy
|
|
Department heads are responsible that checks and audits of tagout logs are conducted....
|
once every 2 weeks
|
|
Completed inactive record sheets shall be retained...
|
for 6 months
|
|
The tag numbering shall start on....
|
1 October of each year at number
(E/O)-001 |