• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/24

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

24 Cards in this Set

  • Front
  • Back
What is the purpose of the equipment tag-out procedures?
Provides units with a standardized equipment tag-out procedure as required by COMDTINST M9000.6
The use of tag is temporary and not a substitue for what?
Chaining, locking valves, removing fuses, or racking out circuit breakers.
Tags should never be used for what?
valve identification, marking leaks, or any purpose not specified in teh tag-out procedure manual
Caution tags are what color?
Yellow
Danger tags are what color?
Red
Out-of-Calibration tag is what color?
Orange
Out-of-commission tag is what color?
Red
Which tag provides a special set of instructions and you must get permission from the EOW before use.
Caution Tag
Which tag prevents any and all use of equipment under all circumstances?
Danger Tag
Which label identifys equipment that may not give proper indications due to being out of tollerance.
Out-Of-Calibration Label
Which label identifys equipment not in use because of being defective or issolated from the system?
Out-Of-Commission Label
How many tag-out logs are required for WHEC, WMEC, and WAGB cutter classes?
Two to be maintained by operations and engineering departments.
A copy of what should be placed in the front of the tag-out log?
A copy of teh AUTHORIZED OFFICERS letter(s)
Who is ultimately responsible for the safety of all maintenance personnel and for the protection of the cutters equipment?
Commanding Officer
After a tag is placed what must a second person do?
Verify that the system or equipment is in the position or condition indicated by the tag and that the tag is properly placed.
The person cheking the tag shall not be what?
The same person who attached the tag
Danger and Caution tags shall be removed when?
Immediatley when the situation requireing the tag-outs has been corrected.
No tags shall be cleared without approval from who?
Authorizing Officer
Who can remove a tag and submit it for clearance?
ONLY the person who attached it.
When there are multiple tags in place which ones take precedence?
Danger tags
Checks and Audits of all tag-outs are required how often, and by who?
Once every two weeks by the cognizant department head.
Who should perform a spot check of installed tags?
Authorizing Officer's
The tag number shall start on what date of each year? And what number will they start at?
01 October

(E/O)-001
Who is responsible for ensuring a daily inventory of all department PMS tags by serial number?
The Department Head