• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/9

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

9 Cards in this Set

  • Front
  • Back
THE ____________INITIATES THE LAUNCH COMPLETE PHASE OF THE CATAPULT OPERATION
STEAM PRESSURE CUT-OFF SWITCHES
CVN 68 AND CVN 69 CUT-OFF SWITCH INSTALLATION LOCATION IS _______ FEET FROM CATAPULT STATION ZERO.
186
CVN 70 TROUGH CVN 75 CUT-OFF SWICH INSTALLATION LOCATION IS ______ FEET FROM CATAPULT STATION ZERO.
198
SWITCHES AR IDENTIFIED FROM LEFT TO RIGHT AS _______ OR _______
1. S790A
2. S790B
THE CUT-OFF SWITCHES ARE ________ ACTUATED, PRESSURE SENSING, AND WIRED IN SERIES.
WATER
THE CUT-OFF SWITCHS ARE PRE-SET TO CLOSE AT ___________ AND OPEN AT ____________.
1. 20 +/- 1 PSI
2. 10 +/- 2 PSI
THE ORIFICE LOCATED IN THE DRAIN LINE OF THE CUT-OFF SWITCHES SIZE IS _____________.
.187 +/- .010 INCHES (3/16 INCH)
WHAT IS THE LAUNCH COMPLETE RELAY BREAK DOWN?
1. FS DE-ENERGIZES
2. CL ENERGIZES
3. EA ENERGIZES
4. OE ENERGIZES
5. TD DE-ENERGIZES
REPLACE STEAM PRESSURE CUT-OFF SWITCHES AFTER _________ SHOTS.
15,000