• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back

The Project

Will channel 44.8 billion m3 of water


3 canal systems


1300 Km long


Cost = $79 billion

Controversy

Opponents say...


Waste of resources


Evaporation and pollution cause mass waste of water


73% increase in pollution


Huge cost


Forced relocation of villages - 250000 people

Befits

Industrialised arid north gets supply of fresh water


From the big southern rivers


60% of cost borne by govt


Stops drought