• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/5

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

5 Cards in this Set

  • Front
  • Back
-explain the fundamentals of a tent camp layout in relation to the following.

-latrine from galley
-latrine from water supply
-garbage pit from water
-garbage pit from galley
-latrine from galley 100 yds
-latrine from water supply 100 yds
-garbage pit from water 100 yds
-garbage pit from galley 30 yds
-discuss the purpose of leach fields
-used to dispose of grey water into the ground using 4" to 6" perforated pipe.
-discuss the following as it pertains to camp maintanance

-trouble desk
-three types of work
-operator inspection
-control inspections
-trouble desk: recieves all customer service calls.
-3 types of work: emergency service work- all work requiring immidiate action and requires less than 16 man hours and less than $100 in material cost. specific job order- is a job that will take more than 16 man hours. standing job order- a large job that takes more than 40 hours to complete.
-operators inspection: preformed by the operator of the equipment
-control inspection: review of camp facilities to determine necessary maintanance during a deployment.
-discuss potable water, chlorination, and super chlorination
-potable water: satisfactory for drinking
-chlorination: residual chlorine of 2PPM
-super chlorination: 100 PPM
-discuss the three parts of the ABFC system and explain their relationship
-component site plan: a group of personnel and material that has a specific function or mission at and advanced base (NMCB)
-facility drawing: lists and describes by assembly number the assembly requirement for each facility. (250 man tent camp)
-assembly drawing: lists line item requirements by NSN for each assembly (tent 16X32)