• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/7

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

7 Cards in this Set

  • Front
  • Back

RE-1

Ship Self-Assessment of total readiness during sustainment phase/while ship is deployed

RE-2

TYCOM-led assessment of material conditions during sustainment phase post RE-1

RE-3

TYCOM-Led event that is conducted during sustainment phase


1. Safety & Occupational Health (SOH)


2. Environmental Programs Review


3. Command Readiness Assessment Visit (CRAV)

RE-4

LOA


Crew Certification/Dock Trial


Fast Cruise


Contractor Sea Trial

RE-5/RFSA

Underway demonstrations

RE-6

Ship’s Mobility


1. MI SOE


2. Industrial Hygiene (IH)


3. Materials Validation


4. CMAV

RE-7

Pre-INSURV Checks or TYCOM MI