• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/93

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

93 Cards in this Set

  • Front
  • Back

What is a Records Management System?

A specific set of processes, related control functions, and tools that are consolidated and combined to record and retain information about the project

What is the Perform Quantitative Risk Analysis process?

The process of numerically analyzing the effect of identified risks on overall project objectives

What is Negative Float?

The amount of time by which the early date (start or finish) of an activity exceeds its late date.

What are Make-or-Buy Decisions?

Decisions made regarding the external purchase or internal manufacture of a product

What is Gold Plating?

Giving the customer extras like extra functionality, high quality, better performance than what is part of the project requirements

What is Code of Accounts?

Any numbering system used to uniquely identify each component of the WBS

What is Finish Date?

The date of completion of a schedule activity, usually qualified by one of the following: actual, planned, estimated, scheduled, early, late, baseline, target, or current.

What is an Imposed Date?

A fixed date imposed on a schedule activity or schedule milestone, usually in the form of a 'start no later than' and 'finish no later than' date

What is a Collective Bargaining Agreement?

Written, legally enforceable contract for a specified period (usually 1 year), between organization and its employees represented by an independent trade union. It sets down and defines conditions of employment (wages, working hours, conditions, etc) and procedures for dispute resolution. Its is also called labor agreement, union agreement, or union contract

What is Project Management?

The application of knowledge, skills, tools, and techniques to project activities to meet the project requirements

What is Cost of Non-Conformance?

Failure costs (such as costs associated with rework, scrap, loss of business, and warranty)

What is Manage Communications process?

The process of creating, collecting, distributing, storing, retrieving, and the ultimate disposition of project information in accordance with the communications management plan.

That is a Project Management Knowledge Area?

A grouping of project management processes by areas of specialization

What is Earned Value (EV)?

The estimated (monetary) value of the work accomplished. It is also referred to as the budget cost of work performed (BCWP).

That is Fast Tracking?

A schedule compression technique that reduces the project duration by performing critical path activities in a parallel that were originally planned to be performed in sequence.

What are Risk Audits?

Examination and documentation of the effectiveness of risk responses in dealing with identified risks and their root causes, as well as the effectiveness of the risk management process.

What is Cost Variance (CV)?

It is the amount of budget deficit or surplus at a given point in time, and is expressed as the difference between earned value (EV) and actual cost (AC).

What is a Project Management Plan?

The document that describes how the project will be executed, monitored, and controlled.

What is a Near-Critical Activity?

A schedule activity that has low total float

What is the Identify Risk process?

The process of identifying the risks that may affect a project and documenting their characteristics.

What are Prototypes?

A method of obtaining early feedback on requirements by providing a working model (usually on a smaller scale) of the expected product before actually building it. They help customers visualize their end product and provide early feedback, and reduce the risks on the project

What are Enterprise Environmental Factors?

The external or internal factors, not under the immediate control of the team, that surround or influence a project's success. Examples include organizational culture, industry standards, marketplace conditions.

What is Authority?

The right to apply project resources, expend funds, make decisions, or give approvals.

What is the Identify Stakeholders process?

The process of identifying all people, groups or organizations that could impact or be impacted by the project, and documenting relevant information regarding their interests, involvement, and impact on project success.

What is a Reserve?

A buffer in the Project Management Plan to account for cost and/or schedule risk

What is the Sequence Activities process?

The process of identifying and documenting dependencies among the project activities, and arranging the activities in a logical order

What is Networking?

Establishing connections and relationships with other people from the same or other organizations

Define Inspection

Examining or measuring to verify whether an activity, component, product, result, or service conforms to specified requirements.

Define Responsibility

An assignment that can be delegated within a PM Plan such that the assigned resource incurs a duty to perform the requirements of the assignment.

What is a Requested Change?

A formally documented change request that is submitted for approval to the integrated change control process

Define Stakeholder

Person or organization (eg., customer, sponsor) that is actively involved in a project, or whose interests may be positively or negatively affected by the project

What is the Plan Human Resource Management process?

The process of identifying and documenting project roles, responsibilities, required skills, reporting relationships, and creating a staffing management plan

What is a Project Life Cycle?

A collection of phases, from concept to end-of-life, that a product passes through. A typical product life cycle many include the following phases: concept, definition, production, operation, and obsolescence.

What is a Requirements Management Plan?

A component of the Project Management Plan that describes how requirements will be analyzed, documented, and managed throughout the project.

Who is a Risk Response Owner?

An individual responsible for implementing a pre-planned response for a risk

What is Budgeted Cost of Work Performed (BCWP)?

An old term for Earned Value (EV)

What is a Flowchart?

A diagrammatic representation of the inputs, process actions, and outputs of one or more processes within a system

What is Expected Monetary Value (EMV) Analysis?

A statistical technique that calculates the profit or loss of an outcome based on different scenarios, by taking into consideration the probability of occurrence and the expected profit or loss from each scenario. It is commonly used in Decision Tree Analysis.

What is Program Evaluation and Review Technique (PERT)?

A technique for estimating, that applies a weighted average of optimistic, pessimistic, and most likely estimates where there is uncertainty with the individual activity estimates.

What is Present Value (PV)?

The current value of future cash flow, discounted to reflect the time value of money and other factors such as investment risk.

What is a Bar Chart?

A graphic display of schedule-related information. Schedule activities or work breakdown structure components are listed down the left side of the chart, dates are shown across the top, and activity durations are shown as date-placed horizontal bars.

What is Pre-Assignment?

Team members selected in advance are considered pre-assigned. Sometimes, pre-assigned resources are listed in the project charter itself.

Define Referent Power.

The power derived from personality traits or charisma

What is a Project Schedule Network Diagram?

A graphical representation of the logical relationships among the project schedule activities. Always drawn from left to right to reflect project chronology.

What is a Work Package?

A unit of work or deliverable at the lowest level of each branch on the WBS for which cost and duration can be estimated and managed.

What is a Risk Register?

The document that contains the list of identified risks along with their description, category, probability, impact, planned responses, owners and status.

What is an Output?

A product, result, or service generated by a process.

What is Accountability?

It is the acceptance of success or failure

What is a Work Authorization?

A process for sanctioning project work to ensure that the work is done by the person or organization, at the right time, and in the proper sequence.

What is the Control Costs process?

The process of monitoring project costs and managing changes to the cost baseline.

What is Marginal Analysis?

The process of weighing the benefits of an action against the incremental cost of performing the action.

What is Progressive Elaboration?

Continuously improving and detailing a plan as more detailed and specific information is available, and thereby producing more accurate and complete plans.

Define Critical Path.

In a project schedule network diagram, it is the longest path, and corresponds to the shortest duration to complete the project. It's duration determines the duration of the project.

What is a Change Request?

A formal proposal to modify any document, deliverable, or baseline. It may include corrective actions, preventive actions, defect repairs, and updates to project documentation and plans.

What is Accuracy in the context of quality management?

A measure of correctness

What is Trend Analysis?

A technique used for identifying patterns (or trends) in historical information, in order to predict future events.

What is Sensitivity Analysis?

A quantitative risk analysis and modeling technique used to help determine which risks have the most potential impact on the project. It examines the extent to which the uncertainty of each project element affects the objective being examined when all other uncertain elements are held at their baseline values. The typical display of results is int he form of a Tornado Diagram

What is a Responsibility Assignment Matrix (RAM)?

A grid that shows the project resources assigned to each work package

What is a Reporting System?

Facilities, processes, and procedures used to generate or consolidate reports from one or more information management systems and facilitate report distribution to project stakeholders.

What is Performance Reporting?

The act of collecting and distributing performance information, including status reports, progress measurements, and forecasts.

What is Parametric Estimating?

An estimating technique that uses a statistical relationship established based on historical data, to calculate and estimate for activity parameters, such as scope, cost, budget, and duration.

Define Issue.

Something in dispute or to be decided.

Define Emotional Intelligence.

The capability to identify, assess, and manage the personal emotions of oneself and other people, as well as the collective emotions of groups of people.

What is a Control Chart?

The display of the results of a process over time. Control Charts are used to determine whether a process is "in control" or in need of adjustment.

What are Questionnaires and Surveys?

Written sets of questions designed to quickly accumulate information from a large number of respondents.

What is the Collect Requirements process?

The process of defining and documenting the needs of the stakeholders in order to meet the project objectives

What is the definition of Quality?

The degree to which a set of inherent characteristics fulfills requirements.

What is a Milestone Schedule?

A project schedule in summary form that identifies major milestones

What is What-If Scenario Analysis?

A technique used to develop and control project schedule by assessing the feasibility of project schedule under various scenarios. It works by asking questions such as "what if scenario x happens?".

What is Point of Total Assumption (PTA)?

The total cost on a Fixed Price Incentive Fee (FPIF) contract, above which the seller bears all cost overruns.

What is Design of Experiments (DOE)?

A statistical method of identifying which factors may influence specific variable of a project or process under development or in production.

What is a Schedule Performance Index (SPI)?

A measure of schedule efficiency expressed as the ratio of Earned Value (EV) to Planned Value (PV).

What is a Tornado Diagram?

A special type of bar chart used in sensitivity analysis for comparing the relative importance of the variables.

What is a Histogram?

A vertical bar chart used to plot the frequency of occurrence of a particular problem or situation. It describes the central tendency, dispersion, and shape of a statistical distribution.

What is a Time-Scaled Schedule Network Diagram?

A project schedule network diagram in the form of a bar chart where bars represent activities, and the length of the bars represent activity durations.

What are Communication Methods?

Systematic procedures, techniques, or processes used to transfer information among project stakeholders.

What is a Tool?

Something tangible (eg scheduling software, simulation program, template, etc) that is used to perform an activity to produce a deliverable.

What is a Resource Breakdown Structure?

A hierarchical structure of project resources by resource category and type

What is Crashing?

A schedule compression technique that involves determining an approach that brings maximum reduction in project duration with least incremental cost and risk, and without changing the scope.

What are Operations?

Ongoing activities that produce repetitive outputs

What is Backward Pass?

A Critical Path Method (CPM) technique to calculate the late finish dates and late start dates by working backwards from the project's end date, in the schedule model.

What is an Activity?

A task performed within a project

What is a Change Control Board (CCB)?

A formally constituted group of stakeholders responsible for approving or rejecting changes to the project, and for recording and communicating the decisions taken.

What is Failure Mode and Effect Analysis (FMEA)?

An analytical procedure in which each potential failure mode in every component of a product is analyzed to determine its effect on the reliability and function of that component, product or system. For each potential failure, the effect and its impact is estimated, and actions are planned to reduce the probability of failure.

What is the Weighted Milestone Method?

An earned value method that divides a work package into measurable segments, each ending with an observable milestone, and then assigns a weighted value to the achievement of each milestone

Define Policy.

A structured pattern of actions adopted by an organization such that the organization's policy can be explained as a set of basic principles that govern the organization's conduct.

Define Requirement.

A condition or capability that is required to be present in a product, service, or result to satisfy a contract or other formally imposed specification.

What is Schedule Data?

The collection of information for describing and controlling the schedule.

Define Duration (DU or DUR).

The total number of work periods (days, weeks) excluding holidays or other nonworking periods, required to complete an activity

What is a Risk Breakdown Structure (RBS)?

A hierarchical organization of project risks by risk categories or sources of risk.

What is Value Engineering?

A product analysis technique to perform the same work at lesser cost. It is also known as Value Analysis or Value Management.

What is Adaptive Life Cycle?

A project life cycle that is intended to facilitate change and requires a high degree of ongoing stakeholder involvement. it is also iterative and incremental, but its iterations are very rapid (usually 2-4 weeks in length) and are fixed in time and resources.

What are Procurement Audits?

The review of contracts and contracting processes for completeness, accuracy, and effectiveness.